February 5, 2002 Mr. Oliver D. Kingsley, President Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

ASSESSMENT FOLLOWUP - BRAIDWOOD STATION, UNIT 1

Dear Mr. Kingsley:

On January 25, 2002, the NRC staff completed a quarterly review of the Braidwood Station, Units 1 and 2. The assessment evaluated the performance indicators (PIs) and inspection results. The purpose of this letter is to inform you of your safety performance during this period and our plans for a future inspection at your facility.

Our review identified that you have crossed the threshold from Green to White for the Unit 1 safety system unavailability, heat removal system (Auxiliary Feedwater System) performance indicator as a result of two component failures during the past year. As a result, we have assessed Braidwood Station performance to be in the Regulatory Response Cornerstone column of the NRCs Action Matrix. Therefore, we plan to conduct supplemental inspection 95001, Inspection for One or Two White Inputs in a Strategic Performance Area, during the weeks of February 11 and 19, 2002. This inspection procedure is conducted to provide assurance that the root causes and contributing causes of risk significant performance issues are understood, the extent of condition is identified, and the corrective actions are sufficient to prevent recurrence.

In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-rm.html (the Public Electronic Reading Room).

O. Kingsley Please contact Ann Marie Stone at 630-829-9729 with any questions you may have regarding this letter.

Sincerely, Original signed by Geoffrey E. Grant Geoffrey E. Grant, Director Division of Reactor Projects Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 cc:

J. Skolds, Chief Operating Officer W. Bohlke, Senior Vice President, Nuclear Services C. Crane, Senior Vice President - Mid-West Regional Operating Group J. Cotton, Senior Vice President - Operations Support J. Benjamin, Vice President - Licensing and Regulatory Affairs R. Hovey, Operations Vice President K. Ainger, Director - Licensing R. Helfrich, Senior Counsel, Nuclear DCD - Licensing J. von Suskil, Site Vice President K. Schwartz, Plant Manager A. Ferko, Regulatory Assurance Manager M. Aguilar, Assistant Attorney General Illinois Department of Nuclear Safety State Liaison Officer Chairman, Illinois Commerce Commission

DOCUMENT NAME: G:\\brai\\braidwood.wpd To receive a copy of this document, indicate in the box:"C" = Copy without enclosure "E"= Copy with enclosure"N"= No copy OFFICE RIII RIII NAME AMStone/trn GGrant DATE 02/04/02 02/05/02 OFFICIAL RECORD COPY

O. Kingsley ADAMS Distribution:

AJM DFT MLC RidsNrrDipmIipb GEG HBC CJP3 C. Ariano (hard copy)

DRPIII DRSIII PLB1 JRK1