ML020330004

From kanterella
Jump to navigation Jump to search

Technical Specifications - Oyster Creek - Amendment No. 224 (Tac No MB2431)
ML020330004
Person / Time
Site: Oyster Creek
Issue date: 01/28/2002
From:
NRC/NRR/DLPM
To:
References
TAC MB2431
Download: ML020330004 (2)


Text

6.5.1.2 Proposed changes to the Appendix "A" Technical Specifications sha)l bc reviewed by a knowledgeable individual(s)/group other than the individual(s)/group who prepared the change.

6.5.1.3 Proposed modifications, that affect nuclear safety, to facility structures, systems and components shall be designed by an individual/organization knowledgeable in the areas affected by the proposed modification. Each such modification shall be reviewed by an individual/group other than the individcal/group which designed the modification but may be from the same division as the individual who designed the modification.

6.5.1.4 Proposed tests and experiments that affect nuclear safety shall be reviewed by a knowledgeable individual(s)/group other than the preparer but who may be from the same division as the individual who prepared the tests and experiments.

6.5.1.5 Investigation of all violations of the Technical Specifications including the preparation and forwarding of reports covering evaluation and recommendations to prevent recurrence, shall be reviewed by a knowledgeable individual(s)/group other than the individual/group which performed the investigation.

6.5.1.6 Events requiring 24-hour written notification to the Commission shall be reviewed by an individual/group other than the individual/group which prepared the report.

6.5.1.7 Special reviews, investigations or analyses and reports thereon as requested by the Vice President - Oyster Creek shall be performed by a knowledgeable individual(s)/group.

6.5.1.8 The Security Plan and implementing procedures shall be reviewed by a knowledgeable individual(s)/group other than the individual(s)/group which prepared them.

6.5.1.9 The Emergency Plan and implementing procedures shall be reviewed by a knowledgeable individual(s)/group othe-r than the individual(s)/group which prepared them.

6.5.1.10 Review of every unplanned onsite release of radioactive material to the environs including the preparation and forwarding of reports covering evaluation shall be performed by a knowledgeable individual(s)/group. Recommendations and disposition of the corrective action to prevent recurrence shall be sent to the Vice President - Oyster Creek.

6.5.1.11 Major changes to radwaste systems shall be reviewed by a knowledgeable individual(s)/group other than the individual(s)/group which prepared them.

6.5.1.12 Individuals responsible for reviews performed in accordance with 6.5.1.1 through 6.5.1.4 shall include a determination of whether or not additional cross-disciplinary review is necessary. If deemed necessary, such review shall be performed by the appropriate personnel. Individuals responsible for reviews considered under 6.5.1.1, 6.5.1.3, and 6,5.1.4 shall render determinations in writing with regard to whether or not NRC approval is required pursuant to IOCFR50.59.

Amendment No.: 69, 125, 134, 180, 210, 213, 224 OYSTER CREFK 6-4

RESPONSTBTLITIES 6.5.2.5 The following subjects shall be independently reviewed by the functionally assigned divisions:

a.

Written evaluations of changes in the facility as described in the Updated Final Safety Analysis Report (UFSAR), of changes in procedures as described in the UFSAR, and of tests or experiments not described in the UFSAR, which are completed without prior NRC approval under the provisions of IOCFR50.59(c)(1). This review is to verify that such changes, tests or experiments did not involve a change in the Technical Specifications or require NRC approval pursuant to IOCFR50.59. Such reviews need not be performed prior to implementation.

b.

Proposed changes in procedures, proposed changes in the facility, or proposed tests or experiments, any of which involves a change in the Technical Specifications or requires NRC approval pursuant to 10CFR50.59. Matters of this kind shall be reviewed prior to submittal to the NRC.

c.

Proposed changes to Technical Specifications or license amendments related to nuclear safety shall be reviewed prior to submittal to the NRC for approval.

d.

Violations, deviations, and reportable events which require reporting to the NRC in writing. Such reviews are performed after the fact. Review of events covered under this subsection shall include results of any investigations made and the recommendations resulting from such investigations to prevent or reduce the probability of recurrence of the event.

e.

Written summaries of audit reports in the areas specified in section 6.5.3 and involving safety related functions.

f.

Any othcer matters involving safe operations of the nuclear power plant which a reviewer deems appropriate for consideration, or which is referred to the independent reviewers.

QUALIFICATIONS 6.5.2.6 The independent reviewer(s) shall either have a Bachelors Degree in Engineering or the Physical Sciences and five (5) years of professional level experience in the area being reviewed or have 9 years of appropriate experience in the field of his specialty. An individual performing reviews may possess competence in more than one specialty area. Credit toward experience will be given for advanced degrees on a one-for-one basis up to a maximum of two years.

RECORDS 6.5.2.7 Reports of reviews encompassed in Section 6.5.2.5 shall be prepared, maintained and transmitted to the cognizant department director and the Vice President - Oyster Creek.

Amendment No.: 69,134,203,210,213,224 OYSTER CREEK 6*-6