ct ct Agenda Opening Remarks Yankee Rowe Plant Status Connecticut Yankee Plant Status Public Participation End State Strategic Planning Summary/Concluding Remarks 2

CY and YR Security Enhancements

"* Site Access Control

"* Vehicle Barriers

"* Additional Staff

"* Visitor Restrictions 3

CI u)

C) 4-4 ct 0t

Safety Performance

"* Over 350,000 Safe Work Hours Without a LTA

"* Two OSHA Recordable Incidents for 2001

"* Continue to Emphasize Occupational and Radiological Safety 5

Dry Fuel Storage Project Status

  • ISFSI and Fuel Transfer Enclosure Complete
  • Transportable Storage Canisters Delivered
  • Vertical Concrete Casks Constructed
  • Fuel Load to Start in Spring 2002
  • "Phased Approach" to Planning and Preparation
  • Multiple Dry Runs Planned
  • NAC's Oversight Program 6

r--

lmý

Fuel Transfer Preparations

  • NAC International Team Selected as Fuel Transfer Operations Contractor (FTOC)

- Experienced in Fuel Transfer

- General License Holder for NAC-MPC System

  • Experienced Team of Sub-Contractors

- Framatome

- Duratek

- WSI

- Master Lee

- DE&S 9

Fuel Transfer Activities

"* Construct Vertical Concrete Casks - Complete

"*Repackage GTCC - Complete

"* Reconstitute Upper Tier Fuel - Complete

  • Inspect and Reconstitute Lower Tier Fuel
  • Load and Prepare Canisters
  • Operate ISFSI Throughout Fuel Transfer
  • Remove Spent Fuel Racks
  • Package and Ship Wastes 10

Dry Fuel Storage Project Oversight

"* Licensee's Role and Responsibilities

"* Experienced Oversight Team

- Safety: Radiological and Occupational

- Fuel Handling

- Quality Assurance

- Engineering

"* Formal Oversight Program

- Oversight Manual and Implementing Procedures

- DOC Oversight Lessons Learned 11

ct 4)-4

Safety Performance

  • 1.2 Million Safe Work Hours Since Last Lost Time Accident
  • Improving Dose Performance
  • Effective Dose Management Key to Meeting PSDAR Dose Estimate
  • 13 Million Pounds of Waste Shipped to Date
  • Continued Emphasis On Occupational and Radiological Safety 13

Spent Fuel Pool Island

"* Security Systems Enhanced

"* Fuel Assembly Sized (FAS) Canisters Transferred to Spent Fuel Pool

"* Isolation of Spent Fuel Pool Complete

"* Emergency Planning Drills 14

CY ISFSI

"* NAC MPC/STC Design

- VCC Liners Delivered

- Draft C of C and SER Issued

- Fuel Canister Delivery Beginning in Spring 2002

"* ISFSI Construction On Hold Pending Building Permit

"* Spent Fuel Building Modifications 15

ct ct

Decommissioning Status

"* Large Components Shipped

- Reactor Vessel Head

- Steam Generator Lower Assemblies

- Pressurizer

"* Reactor Internals Segmentation Demobilization

"* Reactor Vessel Removal Planning in Process

"* PAB Commodity Removal Complete

"* Turbine Building Equipment Removals Ongoing 17

ct ct 4-j

Radiological Work Performance

"* Successful Remediation of High Alpha Contaminated Areas

- PAB Pipe Trench

- RHR Pit

- Tank Farm

- Waste Disposal Building

"* Successful Control & Monitoring of Airborne Radiation - No Internal Exposures >50 mrem

"* Ongoing Campaign to Reduce High Radiation Areas and Radiological Sources 20

Dose Reduction Improvement

"* Planning Improvements

- Enhanced Planning Process

- Craft and Technician Involvement in Planning

"* Performance Indicators Tracked and Published For Each Task

"* Maintaining Dose Below Targets

"* Extensive Radiological Planning Ongoing

- Cavity Draindown

- Reactor Vessel Removal

- Commodity Removal 21

CY Oversight

"* Oversight Roles and Responsibilities

- Maintain Licensee Responsibilities

- Planning Involvement/Reviews

- Evaluation of Field Activities

- Focused Assessments

"* Risk Based Approach

"* Reporting Tools

- Oversight Reports

- Monthly Oversight Status Report

- Quarterly Performance Report 22

CY Oversight

"* Oversight Self Assessments/Bechtel Feedback

"* Two Site Integration with Yankee Rowe Oversight

"* Bechtel Strengths Occupational Safety Radiation Protection Corrective Action Program Operations/Nuclear

"* Bechtel Areas for Improvement - Schedule and Sub-Contractor Control 23

License Termination Plan

"*NRC Approval

- NRC/CY RAI Resolution Meetings Ongoing

- SER Completion Targeted for June 2002

"*ASLB Hearing

- DPUC Contentions Resolved

- Citizens Advisory Network (CAN) Contention Resolution Ongoing

"*Final Status Survey

- Programs and Processes Developed

- Two Class 3 Areas Surveyed 24

Groundwater Characterization

"* Developed Groundwater Monitoring Plan

- Initiated Program in 1999

- 38 Monitoring Wells

"* Completed Six Rounds of Sampling

- Radiological Issues (H3, Cs137, Sr90)

- Non-Radiological Issues (Boron, pH)

"* Groundwater Results Will Be Incorporated in Site Dose Assessment 25

Public Participation

"* CDAC/ CAB (Citizens Advisory Committees)

"* Public Meetings on CY ISFSI/LTP

"* Town Emergency Planning Meetings

"* Land Donation Stakeholder Meetings

"* REPAC (Repowering Advisory Committee) 26

Land Conservation

  • Exploring Land Conservation
  • Using CLF Ventures to Determine Long-Term Solution
  • Forming Land Donation Advisory Committee
  • Request Proposals in Spring 2002
  • Does Not Include ISFSI Site or Industrial Area Slated for Repowering 27

End State Strategic Planning

Purpose:

Guide CYAPCO and YAEC through Completion of Business Affairs

  • Mission:

- Complete Decommissioning

- Implement Safe & Efficient Dry Cask Storage

- Transfer Fuel to Third Party

- Complete Business Affairs 28