ct ct Agenda Opening Remarks Yankee Rowe Plant Status Connecticut Yankee Plant Status Public Participation End State Strategic Planning Summary/Concluding Remarks 2
CY and YR Security Enhancements
"* Site Access Control
"* Vehicle Barriers
"* Additional Staff
"* Visitor Restrictions 3
CI u)
C) 4-4 ct 0t
Safety Performance
"* Over 350,000 Safe Work Hours Without a LTA
"* Two OSHA Recordable Incidents for 2001
"* Continue to Emphasize Occupational and Radiological Safety 5
Dry Fuel Storage Project Status
- ISFSI and Fuel Transfer Enclosure Complete
- Transportable Storage Canisters Delivered
- Vertical Concrete Casks Constructed
- Fuel Load to Start in Spring 2002
- "Phased Approach" to Planning and Preparation
- Multiple Dry Runs Planned
- NAC's Oversight Program 6
r--
lmý
Fuel Transfer Preparations
- NAC International Team Selected as Fuel Transfer Operations Contractor (FTOC)
- Experienced in Fuel Transfer
- General License Holder for NAC-MPC System
- Experienced Team of Sub-Contractors
- Duratek
- WSI
- Master Lee
- DE&S 9
Fuel Transfer Activities
"* Construct Vertical Concrete Casks - Complete
"*Repackage GTCC - Complete
"* Reconstitute Upper Tier Fuel - Complete
- Inspect and Reconstitute Lower Tier Fuel
- Load and Prepare Canisters
- Operate ISFSI Throughout Fuel Transfer
- Remove Spent Fuel Racks
- Package and Ship Wastes 10
Dry Fuel Storage Project Oversight
"* Licensee's Role and Responsibilities
"* Experienced Oversight Team
- Safety: Radiological and Occupational
- Fuel Handling
- Quality Assurance
- Engineering
"* Formal Oversight Program
- Oversight Manual and Implementing Procedures
- DOC Oversight Lessons Learned 11
ct 4)-4
Safety Performance
- 1.2 Million Safe Work Hours Since Last Lost Time Accident
- Improving Dose Performance
- Effective Dose Management Key to Meeting PSDAR Dose Estimate
- 13 Million Pounds of Waste Shipped to Date
- Continued Emphasis On Occupational and Radiological Safety 13
Spent Fuel Pool Island
"* Security Systems Enhanced
"* Fuel Assembly Sized (FAS) Canisters Transferred to Spent Fuel Pool
"* Isolation of Spent Fuel Pool Complete
"* Emergency Planning Drills 14
CY ISFSI
"* NAC MPC/STC Design
- VCC Liners Delivered
- Draft C of C and SER Issued
- Fuel Canister Delivery Beginning in Spring 2002
"* ISFSI Construction On Hold Pending Building Permit
"* Spent Fuel Building Modifications 15
ct ct
Decommissioning Status
"* Large Components Shipped
- Reactor Vessel Head
- Steam Generator Lower Assemblies
- Pressurizer
"* Reactor Internals Segmentation Demobilization
"* Reactor Vessel Removal Planning in Process
"* PAB Commodity Removal Complete
"* Turbine Building Equipment Removals Ongoing 17
ct ct 4-j
Radiological Work Performance
"* Successful Remediation of High Alpha Contaminated Areas
- PAB Pipe Trench
- RHR Pit
- Tank Farm
- Waste Disposal Building
"* Successful Control & Monitoring of Airborne Radiation - No Internal Exposures >50 mrem
"* Ongoing Campaign to Reduce High Radiation Areas and Radiological Sources 20
Dose Reduction Improvement
"* Planning Improvements
- Enhanced Planning Process
- Craft and Technician Involvement in Planning
"* Performance Indicators Tracked and Published For Each Task
"* Maintaining Dose Below Targets
"* Extensive Radiological Planning Ongoing
- Cavity Draindown
- Reactor Vessel Removal
- Commodity Removal 21
CY Oversight
"* Oversight Roles and Responsibilities
- Maintain Licensee Responsibilities
- Planning Involvement/Reviews
- Evaluation of Field Activities
- Focused Assessments
"* Risk Based Approach
"* Reporting Tools
- Oversight Reports
- Monthly Oversight Status Report
- Quarterly Performance Report 22
CY Oversight
"* Oversight Self Assessments/Bechtel Feedback
"* Two Site Integration with Yankee Rowe Oversight
"* Bechtel Strengths Occupational Safety Radiation Protection Corrective Action Program Operations/Nuclear
"* Bechtel Areas for Improvement - Schedule and Sub-Contractor Control 23
License Termination Plan
"*NRC Approval
- NRC/CY RAI Resolution Meetings Ongoing
- SER Completion Targeted for June 2002
"*ASLB Hearing
- DPUC Contentions Resolved
- Citizens Advisory Network (CAN) Contention Resolution Ongoing
"*Final Status Survey
- Programs and Processes Developed
- Two Class 3 Areas Surveyed 24
Groundwater Characterization
"* Developed Groundwater Monitoring Plan
- Initiated Program in 1999
- 38 Monitoring Wells
"* Completed Six Rounds of Sampling
- Radiological Issues (H3, Cs137, Sr90)
- Non-Radiological Issues (Boron, pH)
"* Groundwater Results Will Be Incorporated in Site Dose Assessment 25
Public Participation
"* CDAC/ CAB (Citizens Advisory Committees)
"* Public Meetings on CY ISFSI/LTP
"* Town Emergency Planning Meetings
"* Land Donation Stakeholder Meetings
"* REPAC (Repowering Advisory Committee) 26
Land Conservation
- Exploring Land Conservation
- Using CLF Ventures to Determine Long-Term Solution
- Forming Land Donation Advisory Committee
- Request Proposals in Spring 2002
- Does Not Include ISFSI Site or Industrial Area Slated for Repowering 27
End State Strategic Planning
Purpose:
Guide CYAPCO and YAEC through Completion of Business Affairs
- Mission:
- Complete Decommissioning
- Implement Safe & Efficient Dry Cask Storage
- Transfer Fuel to Third Party
- Complete Business Affairs 28