Letter Sequence Approval |
---|
|
|
MONTHYEARML0133800802002-02-0101 February 2002 DC Cook, Units 1 and 2, - Issuance of Amendments 264 & 246. Amendments Would Create TS 3.0.6 & Associated Bases to Allow Equipment That Was Removed from Service or Declare Inoperable to Be Returned to Service Under Administrative Control Project stage: Approval 2002-02-01
[Table View] |
Similar Documents at Cook |
---|
Category:Letter
MONTHYEARIR 05000315/20230042024-01-31031 January 2024 Integrated Inspection Report 05000315/2023004 and 05000316/2023004 ML24004A1582024-01-19019 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0039 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) AEP-NRC-2024-01, Emergency Plan Revision 482024-01-0808 January 2024 Emergency Plan Revision 48 AEP-NRC-2023-56, Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor2023-12-20020 December 2023 Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor ML23352A3502023-12-19019 December 2023 Dc. Cook Nuclear Power Plant, Units 1 Biennial Licensed Operator Requalification Program Inspection and Request for Information ML23338A2642023-12-0505 December 2023 Confirmation of Initial License Examination AEP-NRC-2023-45, Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation IR 05000315/20234042023-11-0606 November 2023 Cyber Security Inspection Report 05000315/2023404 and 05000316/2023404 ML23310A1152023-11-0606 November 2023 Notification of the NRC Baseline Inspection and Request for Information, Inspection Report 05000316/2024002 IR 05000315/20234032023-09-19019 September 2023 Security Baseline Inspection Report 05000315/2023403 and 05000316/2023403 IR 05000315/20230112023-08-31031 August 2023 Functional Engineering Inspection - Commercial Grade Dedication Report 05000315/2023011 and 05000316/2023011 ML23242A1832023-08-30030 August 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report05000315/2023004 AEP-NRC-2023-40, Annual Report of Loss-of-Coolant Accident Evaluation Model Changes2023-08-29029 August 2023 Annual Report of Loss-of-Coolant Accident Evaluation Model Changes IR 05000315/20234022023-08-11011 August 2023 Security Baseline Inspection Report 05000315/2023402 and 05000316/2023402 AEP-NRC-2023-34, Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation2023-08-0202 August 2023 Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation IR 05000315/20230022023-07-24024 July 2023 Integrated Inspection Report 05000315/2023002 and 05000316/2023002 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III IR 05000315/20230122023-06-22022 June 2023 Biennial Problem Identification and Resolution Inspection Report 05000315/2023012 and 05000316/2023012 IR 05000315/20235012023-06-21021 June 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000315/2023501 and 05000316/2023501 AEP-NRC-2023-29, Core Operating Limits Report2023-06-19019 June 2023 Core Operating Limits Report ML23159A0192023-06-13013 June 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Donald C. Cook Nuclear Plant, Units 1 and 2 AEP-NRC-2023-32, Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations2023-06-0606 June 2023 Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2023-33, Renewable Operating Permit2023-06-0505 June 2023 Renewable Operating Permit AEP-NRC-2023-30, Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump2023-06-0101 June 2023 Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-27, Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Annual Radiological Environmental Operating Report ML23131A3282023-05-11011 May 2023 D.C. Cook Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000315/2023404 and 05000316/2023404 IR 05000315/20230012023-05-0303 May 2023 Integrated Inspection Report 05000315/2023001 and 05000316/2023001 AEP-NRC-2023-19, Annual Radioactive Effluent Release Report2023-04-30030 April 2023 Annual Radioactive Effluent Release Report ML23117A0062023-04-27027 April 2023 Review of the Spring 2022 Steam Generator Tube Inspections Report ML23114A1142023-04-25025 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection AEP-NRC-2023-23, Annual Report of Individual Monitoring for 20222023-04-24024 April 2023 Annual Report of Individual Monitoring for 2022 AEP-NRC-2023-24, Notification of Ph Non-Compliance for Turbine Room Sump2023-04-12012 April 2023 Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-20, Annual Report of Property Insurance2023-04-0303 April 2023 Annual Report of Property Insurance AEP-NRC-2023-15, Decommissioning Funding Status Report2023-03-28028 March 2023 Decommissioning Funding Status Report ML23076A0212023-03-20020 March 2023 Request for Information for NRC Commercial Grade Dedication Inspection; Inspection Report 05000315/2023011; 05000316/2023011 IR 05000315/20234012023-03-16016 March 2023 Security Baseline Inspection Report 05000315/2023401 and 05000316/2023401 ML23066A1882023-03-0707 March 2023 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Donald C. Cook Nuclear Plant IR 05000315/20220062023-03-0101 March 2023 Annual Assessment Letter for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2022006 and 05000316/2022006) IR 05000315/20220042023-02-0101 February 2023 Integrated Inspection Report 05000315/2022004 and 05000316/2022004 and Exercise of Enforcement Discretion AEP-NRC-2023-11, Form OAR-1, Owner'S Activity Report2023-01-31031 January 2023 Form OAR-1, Owner'S Activity Report IR 05000315/20230102023-01-31031 January 2023 Phase 4 Post-Approval License Renewal Inspection Report 05000315/2023010 and 05000316/2023010 AEP-NRC-2023-02, Request for Approval of Change Regarding Neutron Flux Instrumentation2023-01-26026 January 2023 Request for Approval of Change Regarding Neutron Flux Instrumentation ML22363A5622023-01-0404 January 2023 Relief Request ISIR-5-06 Related to ASME Code Case N-729-6 Supplemental Examination Requirements of Reactor Vessel Closure Head Penetration Nozzles AEP-NRC-2022-66, Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring2022-12-15015 December 2022 Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring AEP-NRC-2022-46, Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in2022-12-12012 December 2022 Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in ML22340A1392022-11-30030 November 2022 Submittal of Revision 31 to Updated Final Safety Analysis Report and 10CFR50.71(e) Updated and Related Site Change Reports IR 05000315/20220112022-11-0404 November 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000315/2022011 and 05000316/2022011 IR 05000315/20220032022-10-28028 October 2022 Integrated Inspection Report 05000315/2022003 and 05000316/2022003 AEP-NRC-2022-58, U1C31 Steam Generator Tube Inspection Report2022-10-24024 October 2022 U1C31 Steam Generator Tube Inspection Report AEP-NRC-2022-61, Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-062022-10-24024 October 2022 Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-06 2024-01-08
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML22214A0012022-10-0707 October 2022 Issuance of Amendment Nos. 361 and 343 Regarding Adoption of TSTF-554, Revise Reactor Coolant Leakage Requirements ML22046A2332022-06-21021 June 2022 Issuance of Amendment Nos. 360 and 342 Regarding Change to the Technical Specification Requirement for Containment Water Level Instrumentation ML22126A1922022-05-11011 May 2022 Correction to Pages Issued for Amendment No. 359 Regarding Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML22102A0122022-05-0202 May 2022 Issuance of Amendment Nos. 359 and 340 Regarding Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML21062A1882021-03-23023 March 2021 Issuance of Amendment No. 339 One Cycle Extension of Appendix J, Type a, Integrated Leakage Rate Test Interval (EPID L-2020-LLA-0280 (COVID-19)) ML21041A0862021-03-0303 March 2021 Issuance of Amendment No. 338 Regarding One-Time Deferral of the Steam Generator Tube Inspections ML21006A4582021-02-0202 February 2021 Issuance of Amendments Nos. 358 and 337 Regarding Revision to Technical Specifications to Adopt Technical Specifications Task Force Traveler 541, Revision 2 ML20366A1552021-01-15015 January 2021 Issuance of Amendments Nos. 357 and 336 Regarding Revision to Technical Specifications Bases Control Program ML20329A0012021-01-12012 January 2021 Issuance of Amendment No. 356 Regarding Updating the Reactor Coolant System Pressure-Temperature Limits ML20322A4282021-01-0606 January 2021 Issuance of Amendment Nos. 355 and 335, Revision to Technical Specifications to Adopt Technical Specification Task Force Traveler 567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML20315A4832020-12-30030 December 2020 Issuance of Amendment Nos. 354 and 334 Adopt Technical Specification Task Force Traveler TSTF-412, Revision 3, Provide Actions for One Steam Supply to the Turbine Driven Afw/Efw Pump Inoperable ML20213C7042020-09-0303 September 2020 Issuance of Amendment No. 353 One Cycle Extension of Appendix J, Type a, Integrated Leakage Rate Test Interval ML19347B3762020-01-31031 January 2020 Issuance of Amendment Nos. 350 and 331, Revise Technical Specification 5.5.5, Reactor Coolant Pump Flywheel Inspection Program, in Accordance with Technical Specification Task Force TSTF-421 ML19329A0112020-01-23023 January 2020 Issuance of Amendment Numbers 349 and 330 to Apply Leak Before-Break Methodology to Reactor Coolant System Branch Lines and Deletion of Containment Humidity Monitor ML19304B6722019-12-31031 December 2019 Issuance of Amendment Numbers 348 and 329 to Revise Operating Licenses DPR-58 and DPR-74, to Address Issues Identified in Westinghouse Document NSAL-15-1 ML19259A0542019-10-15015 October 2019 Issuance of Amendment to Revise Operating Licenses DPR-58 and DPR-74, Appendix B, Environmental Technical Specifications, Part II, Non-Radiological Environment Protection Plan ML19170A3622019-08-0101 August 2019 Issuance of Amendment Approval of Application of Proprietary Leak-Before-Break Methodology for Reactor Coolant System Small Diameter Piping ML19031B9662019-04-10010 April 2019 Issuance of Amendments 344, 326 Regarding Request to Adopt TSTF-529, Revision 4, Clarify Use and Application Rules ML18346A3582019-02-0505 February 2019 Issuance of Amendments 343 and 325 Regarding the Battery Monitoring and Maintenance Program AEP-NRC-2018-66, Request for License Amendment to Technical Specification 3.4.15, RCS Leakage Detection Instrumentation, and Application of Leak-Before-Break Methodology2018-11-20020 November 2018 Request for License Amendment to Technical Specification 3.4.15, RCS Leakage Detection Instrumentation, and Application of Leak-Before-Break Methodology ML18284A2542018-11-16016 November 2018 Issuance of Amendments Request for Deviation from National Fire Protection Association 805 Requirements ML18249A0192018-11-13013 November 2018 Issuance of Amendment Nos. 341 and 323 Technical Support Center Relocation ML18131A2532018-07-0606 July 2018 Issuance of Amendments Request for Deviation from National Fire Protection Association 805 Requirements ML17312B0302017-12-19019 December 2017 Issuance of Amendments License Amendment Request to Revise Technical Specifications Section 3.7.2, Steam Generator Stop Valves (CAC Nos. MF9539 and MF9540; EPID L-2017-LLA-0198) ML17214A5502017-09-21021 September 2017 Issuance of Amendments License Amendment Request Regarding Technical Specification 3.9.3, Containment Penetrations ML17131A2772017-06-0707 June 2017 Issuance of Amendments License Amendment Request Regarding Containment Leakage Rate Testing Program ML17103A1062017-05-24024 May 2017 Issuance of Amendments Adoption of TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing ML17045A1502017-03-31031 March 2017 Issuance of Amendments Adopting of TSTF0425-A, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B ML16258A3402016-11-0202 November 2016 Issuance of Amendments Cyber Security Implementation Schedule ML16242A1112016-10-20020 October 2016 DC Cook, Units 1 and 2 - Issuance of Amendments Adoption of TSTF-490,REV.0,Deletion of E-Bar Definition and Revision to Reactor Coolant System Specific Activity Technical Specification and Implementation of Full-Scope Alternative Source Ter ML16216A1812016-08-19019 August 2016 Issuance of Amendment to Revise Technical Specification 3.3.2, Engineered Safety Feature Actuation System Instrumentation ML16195A0042016-08-0404 August 2016 Issuance of Amendments to Revise Technical Specifications to Adopt Technical Specifications Task Force - 523, Generic Letter 2008 01, Managing Gas Accumulation ML15327A2172015-12-11011 December 2015 Issuance of Amendments Technical Specifications Surveillance Requirements 3.8.1.10, 3.8.1.11, and 3.8.1.15 ML14197A0972015-11-30030 November 2015 Issuance of Amendment Regarding Restoration of Normal Reactor Coolant System Pressure and Temperature Consistent with Previously Licensed Conditions ML15187A0022015-07-10010 July 2015 Issuance of Amendment No. 328 (Exigent) Regarding Revision to Technical Specifications for Engineered Safety Feature Actuation System ML15076A2262015-04-0606 April 2015 Issuance of Amendments Adoption of TSTF-427, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability, Revision 2 ML15072A2642015-03-30030 March 2015 Issuance of Amendments Containment Leakage Rate Testing Program (TACs MF3568 and MF3569) ML14317A5512014-12-18018 December 2014 Issuance of Amendments Cyber Security Implementation Schedule (Tac Nos. MF3363 and MF3364) ML14282A1182014-11-20020 November 2014 Issuance of Amendments Regarding Containment Divider Barrier Seal ML13140A3982013-10-24024 October 2013 Issuance of Amendment Nos. 322 and 305 - Transition to NFPA 805 Risk-Informed, Performance-Based Fire Protection Program in Accordance with 10 CFR 50.48(c) and NFPA 805 ML13282A2142013-10-0909 October 2013 Issuance of Amendment Revision to Technical Specification 3.6.9, Distributed Ignition System (Dis) (Emergency Circumstances) ML12318A2342012-12-13013 December 2012 Issuance of Amendments Revised Cyber Security Plant Implementation Schedule Milestone 6 ML12320A5442012-11-15015 November 2012 DC Cook CDBI Response to Question 2012-CDBI-298 ML12138A3982012-08-23023 August 2012 Issuance of Amendment No. 302 Regarding Optimized Zirlo Clad Fuel Rods ML11251A2272011-11-0303 November 2011 Issuance of Amendment to Relocate Closure Time Requirements for Certain Valves Per TSTF-491 ML11249A0902011-11-0101 November 2011 Issuance of Amendment to Reflect TSTF-513 Regarding Reactor Coolant Leakage Detection Instrumentation ML1116100202011-08-25025 August 2011 Issuance of Amendment No. 316 Use of Optimized Zirlo Fuel Design ML11182A1782011-07-28028 July 2011 License Amendment, Issuance of Amendments Cyber Security Plan ML11112A1232011-06-0101 June 2011 Issuance of Amendment No 314 and 298 to Units 1 and 2 Containment Spray Nozzle Surveillance ML1107307832011-03-31031 March 2011 (CNP-2)-Issuance of Amendment No. 297 Re. Large-Break Loss-of-Coolant Accident Analysis 2022-06-21
[Table view] Category:Safety Evaluation
MONTHYEARML22363A5622023-01-0404 January 2023 Relief Request ISIR-5-06 Related to ASME Code Case N-729-6 Supplemental Examination Requirements of Reactor Vessel Closure Head Penetration Nozzles ML22214A0012022-10-0707 October 2022 Issuance of Amendment Nos. 361 and 343 Regarding Adoption of TSTF-554, Revise Reactor Coolant Leakage Requirements ML22166A3302022-07-26026 July 2022 Review of Quality Assurance Program Changes ML22046A2332022-06-21021 June 2022 Issuance of Amendment Nos. 360 and 342 Regarding Change to the Technical Specification Requirement for Containment Water Level Instrumentation ML22055A0012022-06-0808 June 2022 Issuance of Amendment No. 341 Updating the Reactor Coolant System Pressure Temperature Limits ML22102A0122022-05-0202 May 2022 Issuance of Amendment Nos. 359 and 340 Regarding Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML21295A0092021-11-0303 November 2021 Relief Request ISIR-4-11 Limited Coverage Examinations During the Fourth 10 Year Inservice Inspection Interval ML21141A2612021-06-0202 June 2021 Alternative Request REL-PP2 Related to Fifth 10-Year Inservice Testing Program Interval ML21130A0082021-05-12012 May 2021 Relief Request ISIR-5-05 Related to ASME Code Case N 729-6 Supplemental Examination Requirements of Reactor Vessel Closure Head Penetration Nozzles (EPID L-2021-LLR-0033 (COVID-19)) ML21062A1882021-03-23023 March 2021 Issuance of Amendment No. 339 One Cycle Extension of Appendix J, Type a, Integrated Leakage Rate Test Interval (EPID L-2020-LLA-0280 (COVID-19)) ML21041A0862021-03-0303 March 2021 Issuance of Amendment No. 338 Regarding One-Time Deferral of the Steam Generator Tube Inspections ML21034A1552021-02-12012 February 2021 Relief Request ISIR-5-04 Related to ASME Code Case N-729-6 Supplemental Examination Requirements of Reactor Vessel Closure Head Penetration Nozzles ML21006A4582021-02-0202 February 2021 Issuance of Amendments Nos. 358 and 337 Regarding Revision to Technical Specifications to Adopt Technical Specifications Task Force Traveler 541, Revision 2 ML20366A1552021-01-15015 January 2021 Issuance of Amendments Nos. 357 and 336 Regarding Revision to Technical Specifications Bases Control Program ML20366A1342021-01-13013 January 2021 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML20329A0012021-01-12012 January 2021 Issuance of Amendment No. 356 Regarding Updating the Reactor Coolant System Pressure-Temperature Limits ML20322A4282021-01-0606 January 2021 Issuance of Amendment Nos. 355 and 335, Revision to Technical Specifications to Adopt Technical Specification Task Force Traveler 567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML20315A4832020-12-30030 December 2020 Issuance of Amendment Nos. 354 and 334 Adopt Technical Specification Task Force Traveler TSTF-412, Revision 3, Provide Actions for One Steam Supply to the Turbine Driven Afw/Efw Pump Inoperable ML20247J6562020-09-10010 September 2020 Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20213C7042020-09-0303 September 2020 Issuance of Amendment No. 353 One Cycle Extension of Appendix J, Type a, Integrated Leakage Rate Test Interval ML19347B3762020-01-31031 January 2020 Issuance of Amendment Nos. 350 and 331, Revise Technical Specification 5.5.5, Reactor Coolant Pump Flywheel Inspection Program, in Accordance with Technical Specification Task Force TSTF-421 ML19329A0112020-01-23023 January 2020 Issuance of Amendment Numbers 349 and 330 to Apply Leak Before-Break Methodology to Reactor Coolant System Branch Lines and Deletion of Containment Humidity Monitor ML19304B6722019-12-31031 December 2019 Issuance of Amendment Numbers 348 and 329 to Revise Operating Licenses DPR-58 and DPR-74, to Address Issues Identified in Westinghouse Document NSAL-15-1 ML19259A0542019-10-15015 October 2019 Issuance of Amendment to Revise Operating Licenses DPR-58 and DPR-74, Appendix B, Environmental Technical Specifications, Part II, Non-Radiological Environment Protection Plan ML19196A0642019-08-23023 August 2019 Relied Request ISIR-4-10 Regarding Fourth Inservice Inspection Program Interval ML19170A3622019-08-0101 August 2019 Issuance of Amendment Approval of Application of Proprietary Leak-Before-Break Methodology for Reactor Coolant System Small Diameter Piping ML19134A3552019-07-11011 July 2019 Issuance of Amendments Technical Specification Task Force (TSTF) Traveler 563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML19031B9662019-04-10010 April 2019 Issuance of Amendments 344, 326 Regarding Request to Adopt TSTF-529, Revision 4, Clarify Use and Application Rules ML18346A3582019-02-0505 February 2019 Issuance of Amendments 343 and 325 Regarding the Battery Monitoring and Maintenance Program ML18348A4182019-01-0909 January 2019 Units and 2 Approval of Request for Alternative from Volumetric/Surface Examination Frequency Requirements of ASME Code Case N 729-4 ML18337A3942018-12-11011 December 2018 Proposed Alternative Request for Elimination of the Reactor Pressure Vessel Threads in Flange Examination ML18284A2542018-11-16016 November 2018 Issuance of Amendments Request for Deviation from National Fire Protection Association 805 Requirements ML18249A0192018-11-13013 November 2018 Issuance of Amendment Nos. 341 and 323 Technical Support Center Relocation ML18284A3102018-10-26026 October 2018 Approval of Alternative to the ASME Code Regarding Reactor Vessel Weld Examination - Relief Request ISIR-4-08 ML18131A2532018-07-0606 July 2018 Issuance of Amendments Request for Deviation from National Fire Protection Association 805 Requirements ML18103A0592018-04-19019 April 2018 Request for Use of Alternative Isir 04-05, Revision 1, Associated with Reactor Vessel Closure Head Volumetric/Surface Examination Frequency Requirements for the Inservice Inspection Program ML17312B0302017-12-19019 December 2017 Issuance of Amendments License Amendment Request to Revise Technical Specifications Section 3.7.2, Steam Generator Stop Valves (CAC Nos. MF9539 and MF9540; EPID L-2017-LLA-0198) ML17214A5502017-09-21021 September 2017 Issuance of Amendments License Amendment Request Regarding Technical Specification 3.9.3, Containment Penetrations ML17131A2772017-06-0707 June 2017 Issuance of Amendments License Amendment Request Regarding Containment Leakage Rate Testing Program ML17103A1062017-05-24024 May 2017 Issuance of Amendments Adoption of TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing ML17096A6272017-04-12012 April 2017 Proposed Alternative to Use ASME OM Code Case OMN-20 ML17045A1502017-03-31031 March 2017 Issuance of Amendments Adopting of TSTF0425-A, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B ML16327A1102016-12-28028 December 2016 Cover Letter for Revised Safety Evaluation for Amendment Nos. 332 and 314 Adoption of TSTF-490, Rev. 0, and Implementation of Full-Scope Alternative Source Term ML16242A1112016-10-20020 October 2016 DC Cook, Units 1 and 2 - Issuance of Amendments Adoption of TSTF-490,REV.0,Deletion of E-Bar Definition and Revision to Reactor Coolant System Specific Activity Technical Specification and Implementation of Full-Scope Alternative Source Ter ML16216A1812016-08-19019 August 2016 Issuance of Amendment to Revise Technical Specification 3.3.2, Engineered Safety Feature Actuation System Instrumentation ML16195A0042016-08-0404 August 2016 Issuance of Amendments to Revise Technical Specifications to Adopt Technical Specifications Task Force - 523, Generic Letter 2008 01, Managing Gas Accumulation ML16032A0312016-02-0404 February 2016 Request for Use of Alternative REL-PP1 Associated with Pump Inservice Testing (CAC Nos. MF6548 and MF6549) ML15327A2172015-12-11011 December 2015 Issuance of Amendments Technical Specifications Surveillance Requirements 3.8.1.10, 3.8.1.11, and 3.8.1.15 ML14197A0972015-11-30030 November 2015 Issuance of Amendment Regarding Restoration of Normal Reactor Coolant System Pressure and Temperature Consistent with Previously Licensed Conditions ML15264A8512015-11-0909 November 2015 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 2023-01-04
[Table view] |
Text
February 1, 2002 Mr. A. Christopher Bakken III, Senior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group 500 Circle Drive Buchanan, MI 49107
SUBJECT:
DONALD C. COOK NUCLEAR PLANT, UNITS 1 AND 2 - ISSUANCE OF AMENDMENTS (TAC NOS. MB2738 AND MB2739)
Dear Mr. Bakken:
The U.S. Nuclear Regulatory Commission (NRC) has issued the enclosed Amendment No. 264 to Facility Operating License No. DPR-58 and Amendment No. 246 to Facility Operating License No. DPR-74 for the Donald C. Cook Nuclear Plant, Units 1 and 2. The amendments consist of changes to the Technical Specifications (TSs) in response to your application dated August 7, 2001.
The amendments would create TS 3.0.6 and associated bases to allow equipment that was removed from service or declared inoperable to be to returned to service under administrative controls solely to perform the testing required to demonstrate its operability or the operability of other equipment. TS 3.0.6 would incorporate the administrative controls currently set forth as TS 3.0.5 in NUREG-1431, Standard Technical Specifications Westinghouse Plants, Revision 2, dated April 30, 2001.
A copy of our related safety evaluation is also enclosed. A Notice of Issuance will be included in the Commission's next biweekly Federal Register notice.
Sincerely,
/RA/
John F. Stang, Senior Project Manager, Section 1 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-315 and 50-316
Enclosures:
- 1. Amendment No. 264 to DPR-58
- 2. Amendment No. 246 to DPR-74
- 3. Safety Evaluation cc w/encls: See next page
ML013380080 *See previous concurrence OFFICE PM:PD3-1 LA:PD3-1 BC:RTSB OGC (A)SC:PD3-1 NAME JStang THarris WBeckner RWeisman* WReckley DATE 01/28/2002 01/29/2002 02/01/2002 01/23/02 02/01/2002 Donald C. Cook Nuclear Plant, Units 1 and 2 cc:
Regional Administrator, Region III Drinking Water and Radiological U.S. Nuclear Regulatory Commission Protection Division 801 Warrenville Road Michigan Department of Lisle, IL 60532-4351 Environmental Quality 3423 N. Martin Luther King Jr Blvd Attorney General P.O. Box 30630, CPH Mailroom Department of Attorney General Lansing, MI 48909-8130 525 West Ottawa Street Lansing, MI 48913 Scot A. Greenlee Director, Nuclear Technical Services Township Supervisor Indiana Michigan Power Company Lake Township Hall Nuclear Generation Group P.O. Box 818 500 Circle Drive Bridgman, MI 49106 Buchanan, MI 49107 U.S. Nuclear Regulatory Commission David A. Lochbaum Resident Inspector's Office Union of Concerned Scientists 7700 Red Arrow Highway 1616 P Street NW, Suite 310 Stevensville, MI 49127 Washington, DC 20036-1495 David W. Jenkins, Esquire Site Vice President Indiana Michigan Power Company Indiana Michigan Power Company Nuclear Generation Group Nuclear Generation Group One Cook Place One Cook Place Bridgman, MI 49106 Bridgman, MI 49106 Mayor, City of Bridgman Michael W. Rencheck, Vice President P.O. Box 366 Strategic Business Improvements Bridgman, MI 49106 Indiana Michigan Power Company Nuclear Generation Group Special Assistant to the Governor 500 Circle Drive Room 1 - State Capitol Buchanan, MI 49107 Lansing, MI 48909 Joseph E. Pollock Plant Manager Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106
INDIANA MICHIGAN POWER COMPANY DOCKET NO. 50-315 DONALD C. COOK NUCLEAR PLANT, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 264 License No. DPR-58
- 1. The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Indiana Michigan Power Company (the licensee) dated August 7, 2001, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-58 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 264, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
- 3. This license amendment is effective as of its date of issuance and shall be implemented within 30 days of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
William D. Reckley, Acting Chief, Section 1 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: February 1, 2002
ATTACHMENT TO LICENSE AMENDMENT NO. 264 TO FACILITY OPERATING LICENSE NO. DPR-58 DOCKET NO. 50-315 Replace the following pages of the Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
REMOVE INSERT 3/4 0-1 3/4 0-1 B 3/4 0-3 B 3/4 0-3
INDIANA MICHIGAN POWER COMPANY DOCKET NO. 50-316 DONALD C. COOK NUCLEAR PLANT, UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 246 License No. DPR-74
- 1. The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Indiana Michigan Power Company (the licensee) dated August 7, 2001, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-74 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 246, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
- 3. This license amendment is effective as of its date of issuance and shall be implemented within 30 days of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
William D. Reckley, Acting Chief, Section 1 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: February 1, 2002
ATTACHMENT TO LICENSE AMENDMENT NO. 246 FACILITY OPERATING LICENSE NO. DPR-74 DOCKET NO. 50-316 Replace the following pages of the Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
REMOVE INSERT 3/4 0-1 3/4 0-1 B 3/4 0-3 B 3/4 0-3 B 3/4 0-4 B 3/4 0-4
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 264 TO FACILITY OPERATING LICENSE NO. DPR-58 AND AMENDMENT NO. 246 TO FACILITY OPERATING LICENSE NO. DPR-74 INDIANA MICHIGAN POWER COMPANY DONALD C. COOK NUCLEAR PLANT, UNITS 1 AND 2 DOCKET NOS. 50-315 AND 50-316
1.0 INTRODUCTION
By application dated August 7, 2001, the Indiana Michigan Power Company (the licensee) requested amendments to the Technical Specifications (TSs) for the Donald C. Cook Nuclear Plant, Units 1 and 2. The proposed amendments would create TS 3.0.6 and associated bases to allow equipment that was removed from service or declared inoperable to be to returned to service under administrative controls solely to perform the testing required to demonstrate its operability or the operability of other equipment. TS 3.0.6 would incorporate the administrative controls currently set forth as TS 3.0.5 in NUREG-1431, Standard Technical Specifications Westinghouse Plants, Revision 2, dated April 30, 2001. In addition, the amendments make format changes to the TS pages.
2.0 EVALUATION During normal plant operations there are situations when equipment that was declared inoperable must be returned to service to perform post-maintenance testing to demonstrate its operability or the operability of other equipment. This is not allowed by the current TS requirements. As a result, a plant shutdown may be necessary if the required testing cannot be completed in the current mode of plant operation.
The proposed TS establishes an allowance for restoring equipment to service under administrative controls when the equipment has been removed from service or declared inoperable to comply with required TS actions. The purpose of the proposed TS is to provide an exception to TS 3.0.1 and TS 3.0.2 to allow the performance of required testing to demonstrate either:
The operability of the equipment being returned to service; or The operability of other equipment.
Administrative controls, such as test procedures, ensure the time the equipment is returned to service is limited to the time absolutely necessary to perform the required testing to demonstrate operability. This proposed TS does not provide time to perform any other preventive or corrective maintenance.
The proposed changes are consistent with NUREG-1431. The proposed TS would prevent the need for plant shutdowns, and the associated transient conditions that may challenge safety-related systems to complete the required testing. Therefore, the staff finds the proposed addition of TS Section 3.0.6 to the D. C Cook TS is acceptable.
The proposed amendments make three types of format changes to the revised TS pages:
Reformat the header to include numbered first and second tier TS section titles and a full-width single line to separate the header section titles from the page text.
Reformat the footer to include Page (page number) center page, AMENDMENT (past amendment numbers, with strike through, and ending with the current amendment number) on the right side of the page, and a full-width single line to separate the footer from the page text.
The format changes to the TS pages do not change any current TS requirements. The changes provide consistency between units, improve readability, and improve page layout.
Therefore, the staff finds the proposed format changes are acceptable.
3.0 STATE CONSULTATION
In accordance with the Commission's regulations, the Michigan State official was notified of the proposed issuance of the amendments. The State official had no comments.
4.0 ENVIRONMENTAL CONSIDERATION
These amendments change the requirements with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The staff has determined that the amendments involve no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendments involve no significant hazards consideration and there has been no public comment on such finding (66 FR 59508). Accordingly, the amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendments.
5.0 CONCLUSION
The staff has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: John Stang Date: February 1, 2002