ML012320309

From kanterella
Jump to navigation Jump to search

Storage License Amendment Request for the Fuelsolutions System Transmittal of Modified Tech Spec Pages
ML012320309
Person / Time
Site: 07201026
Issue date: 08/09/2001
From: Quinn R
BNFL Fuel Solutions Corp
To:
Office of Nuclear Material Safety and Safeguards
References
-RFPFR, BFS/NRC 01-016, CMPC.0006.2, TAC L23296
Download: ML012320309 (8)


Text

BNFL Fuel Solutions BNFL Fuel Solutions Corporation 3600 Glen Canyon Road Scotts Valley, CA 95066 Tel: (831) 438-6444 Fax: (831) 438-5206 August 9, 2001 BFSiNRC 01-016 Docket No. 72-1026 File No. CMPC.0006.2 Director, Office of Nuclear Material Safety and Safeguards United States Nuclear Regulatory Commission Washington, DC 20555-0001

Subject:

Reference:

Storage License Amendment Request for the FuelSolutionsTM System Transmittal of Modified Tech Spec Pages (TAC No. L23296)

FuelSolutionsTM License Amendment Request (LAR) for the W74 Canister, LAR 01-02, Revision 1, July 2001.

Dear Sir or Madam:

This letter transmits modified pages for Table 1.2-6 for the recently issued FuelSolutionsTM W74 Canister License Amendment Request (LAR 01-02), Revision 1. These changes reflect incorporation of clarification comments from NRC staff. Specifically, pages 3.3-3 and 3.3-5 of the FuelSolutionsTM W74 Canister Technical Specifications, Amendment 2 (8/9/01), are enclosed.

Should you or any member of your staff have any questions, please contact the undersigned at (831) 430-5220.

Sincerely, Robert D. Quinn, P.E.

Manager of Operations

Enclosure:

Modified pages 3.3-3 and 3.3.5 of FuelSolutionsTM W74 Canister Technical Specifications, Amendment 2 (8/9/0 1) (10 copies)

U.S. Nuclear Regulatory Commission BFS/NRC 01-016 Page 2 cc:

Mr. John Broschak Consumers Energy Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043 Mr. Mike Bourassa Consumers Energy Big Rock Point Plant 10269 US 31 North Charlevoix, MI 49720 Mr. Norio Hiyama IHI Westinghouse Energy Center Site 4350 Northern Pike Monroeville, PA 15146-2886

SOBNFL Fuel Solutions BNFL Fuel Solutions Corporation 3600 Glen Canyon Road Scotts Valley, CA 95066 Tel: (831) 438-6444 Fax: (831) 438-5206 August 9, 2001 BFS/NRC 01-016 Docket No. 72-1026 File No. CMPC.0006.2 Director, Office of Nuclear Material Safety and Safeguards United States Nuclear Regulatory Commission Washington, DC 20555-0001

Subject:

Reference:

Storage License Amendment Request for the FuelSolutionsTM System Transmittal of Modified Tech Spec Pages (TAC No. L23296)

FuelSolutionsTM License Amendment Request (LAR) for the W74 Canister, LAR 01-02, Revision 1, July 2001.

Dear Sir or Madam:

This letter transmits modified pages for Table 1.2-6 for the recently issued FuelSolutionsTM W74 Canister License Amendment Request (LAR 01-02), Revision 1. These changes reflect incorporation of clarification comments from NRC staff. Specifically, pages 3.3-3 and 3.3-5 of the FuelSolutionsTM W74 Canister Technical Specifications, Amendment 2 (8/9/01), are enclosed.

Should you or any member of your staff have any questions, please contact the undersigned at (831) 430-5220.

Sincerely, Robert D. Quinn, P.E.

Manager of Operations

Enclosure:

Modified pages 3.3-3 and 3.3.5 of FuelSolutionsTM W74 Canister Technical Specifications, Amendment 2 (8/9/01) (10 copies)

U.S. Nuclear Regulatory Commission BFS/NRC 01-016 Page 2 cc:

Mr. John Broschak Consumers Energy Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043 Mr. Mike Bourassa Consumers Energy Big Rock Point Plant 10269 US 31 North Charlevoix, MI 49720 Mr. Norio Hiyama IHI Westinghouse Energy Center Site 4350 Northern Pike Monroeville, PA 15146-2886

Storage Cask Temperatures During Storage 3.3.2 3.3.2 Storage Cask Temperatures During Storage COMPLETION CONDITION REQUIRED ACTION TIME A.4 Repair or replace thermocouple 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> and related instrumentation as necessary.

AND A.5 Perform visual inspection of the 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> STORAGE CASK vent channels by removing the debris screens and using visual aids as necessary. If no obstruction is found, the interior of the STORAGE CASK, including the guide rails and heat shield, is to be visually inspected for ventilation obstructions using remote inspection tools or by temporarily removing the STORAGE CASK top cover.

AND A.6 Verify STORAGE CASK 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> temperature returns to within limit B.

Required Actions and B.1 Initiate actions to cool the cask 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> associated Completion to within the limit Times are not met.

AND B.2 Return CANISTER to 30 days TRANSFER CASK.

AND B.3 Return CANISTER to 270 days repaired or replacement STORAGE CASK.

FuelSolutionsTM W74 Canister Amendment 2 (8/9/0 1) 3.3-3

Storage Cask Temperatures During Horizontal Transfer 3.3.3 3.3 STORAGE CASK INTEGRITY 3.3.3 Storage Cask Temperatures During Horizontal Transfer LCO 3.3.3 The measured temperature of a STORAGE CASK with a W74 CANISTER containing fuel assemblies, as indicated by the liner thermocouple, shall not exceed 185°F (85°C).

APPLICABILITY:

Duinng TRANSFER OPERATIONS.

ACTIONS NOTE Separate Condition entry is allowed for each STORAGE CASK.

I r COMPLETION CONDITION REQUIRED ACTION TIME A.

STORAGE CASK concrete A.1 Transfer the CANISTER into 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> temperature limit is not met the TRANSFER CASK.

B.

Required Action A. 1 and B. 1 Inspect the STORAGE 5 days associated Completion Time CASK for damage.

are not met.

AND B.2.1 If no damage, transfer 7 days CANISTER to STORAGE CASK.

OR B.2.2 If damaged, transfer 21 days CANISTER to new STORAGE CASK.

C.

Required Actions B.1 and C.1 Return CANISTER to 30 days B.2-1 or B.1 and B.2.2 TRANSFER CASK.

and associated AND Completion Times are not met.

C.2 Return CANISTER to 270 days repaired or replacement STORAGE CASK.

FuelSolutionsm W74 Canister Amendment 2 (8/9/01) 3.3-5

Storage Cask Temperatures During Storage 3.3.2 3.3.2 Storage Cask Temperatures During Storage COMPLETION CONDITION REQUIRED ACTION TIME A.4 Repair or replace thermocouple 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> and related instrumentation as necessary.

AND A.5 Perform visual inspection of the 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> STORAGE CASK vent channels by removing the debris screens and using visual aids as necessary. If no obstruction is found, the interior of the STORAGE CASK, including the guide rails and heat shield, is to be visually inspected for ventilation obstructions using remote inspection tools or by temporarily removing the STORAGE CASK top cover.

AND A.6 Verify STORAGE CASK 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> temperature returns to within limit.

B.

Required Actions and B.1 Initiate actions to cool the cask 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> associated Completion to within the limit.

Times are not met.

AND B.2 Return CANISTER to 30 days TRANSFER CASK.

AND B.3 Return CANISTER to 270 days repaired or replacement STORAGE CASK.

FuelSolutionsTM W74 Canister I I Amendment 2 (8/9/0 1) 3.3-3

Storage Cask Temperatures During Horizontal Transfer 3.3.3 3.3 STORAGE CASK INTEGRITY 3.3.3 Storage Cask Temperatures During Horizontal Transfer LCO 3.3.3 The measured temperature of a STORAGE CASK with a W74 CANISTER containing fuel assemblies, as indicated by the liner thermocouple, shall not exceed 185°F (85'C).

APPLICABILITY:

During TRANSFER OPERATIONS.

ACTIONS NOTE Separate Condition entry is allowed for each STORAGE CASK.

SCOMPLETION CONDITION REQUIRED ACTION TIME A.

STORAGE CASK concrete A.1 Transfer the CANISTER into 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> temperature limit is not met the TRANSFER CASK.

B.

Required Action A.1 and B.1 Inspect the STORAGE 5 days associated Completion Time CASK for damage.

are not met.

AND B.2.1 If no damage, transfer 7 days CANISTER to STORAGE CASK.

OR B.2.2 If damaged, transfer 21 days CANISTER to new STORAGE CASK.

C.

Required Actions B.1 and C. I Return CANISTER to 30 days B.2-1 or B.1 and B.2.2 TRANSFER CASK.

and associated Completion Times are not met.

C.2 Return CANISTER to 270 days repaired or replacement STORAGE CASK.

FuelSolutionsTM W74 Canister 3.3-5 Amendment 2 (8/9/01)