Inspection Verification Items for NEI License Renewal Demonstration Project
ML012140471
Person / Time
Site: PROJ0690
Issue date: 08/02/2001
From: Charemagne Grimes
Division of Regulatory Improvement Programs
To: Alexis Nelson
Nuclear Energy Institute
Mitra, SK, NRR/RLSB, 415-2783
References
Download: ML012140471 (9)


Text

August 2, 2001Mr. Alan P. NelsonNuclear Energy Institute 1776 I Street, NW., Suite 400 Washington, DC 20006-3708

SUBJECT:

INSPECTION VERIFICATION ITEMS FOR NEI LICENSE RENEWALDEMONSTRATION PROJECT

Dear Mr. Nelson:

By letter dated May 24, 2001, Nuclear Energy Institute (NEI) submitted sample sections todemonstrate the use of the Generic Aging Lessons Learned (GALL) report in preparing a license renewal application. The NRC staff is reviewing the information contained in these sample sections. The staff is also reviewing the NEI's response to the staff's request for additional information (RAI) submitted on July 11, 2001. As agreed, the staff review does not include Section 2 of the submitted samples because it relates to scoping and the GALL report is not a scoping document.The staff has identified specific items from the demonstration sections which should be verifiedby inspection as described in the enclosure. Please arrange to bring the necessary supporting documents which should contain information to respond to the enclosed list of sample inspection verification items to a public meeting at the NRC Headquarters. The exercise of the inspection verification activity as part of the demonstration project should provide the staff with an understanding of the supporting documentation that is normally maintained on site. Please contact S. K. Mitra at (301) 415-2783 to schedule the public meeting for the first week in September. Sincerely,/RA/Christopher I Grimes, Chief License Renewal and Standardization BranchDivision of Regulatory Improvement Programs Office of Nuclear Reactor RegulationProject No. 690

Enclosure:

As stated cc w/encl: See next page Mr. Alan P. Nelson Nuclear Energy Institute1776 I Street, NW., Suit 400 Washington, DC 20006-3708

SUBJECT:

INSPECTION VERIFICATION ITEMS FOR NEI LICENSE RENEWALDEMONSTRATION PROJECT

Dear Mr. Nelson:

By letter dated May 24, 2001, Nuclear Energy Institute (NEI) submitted sample sections todemonstrate the use of the Generic Aging Lessons Learned (GALL) report in preparing a license renewal application. The NRC staff is reviewing the information contained in these sample sections. The staff is also reviewing the NEI's response to the staff's request for additional information (RAI) submitted on July 11, 2001. As agreed, the staff review does not include Section 2 of the submitted samples because it relates to scoping and the GALL report is not a scoping document.The staff has identified specific items from the demonstration sections which should be verifiedby inspection as described in the enclosure. Please arrange to bring the necessary supporting documents which should contain information to respond to the enclosed list of sample inspection verification items to a public meeting at the NRC Headquarters. The exercise of the inspection verification activity as part of the demonstration project should provide the staff with an understanding of the supporting documentation that is normally maintained on site. Please contact S. K. Mitra at (301) 415-2783 to schedule the public meeting for the first week in September. Sincerely,/RA/Christopher I Grimes, Chief License Renewal and Standardization BranchDivision of Regulatory Improvement Programs Office of Nuclear Reactor RegulationProject No. 690

Enclosure:

As stated cc w/encl: See next page Distribution

See next page*See previous concurrenceDOCUMENT NAME:C:\Program Files\Adobe\Acrobat 4.0\PDF Output\inspection letter to NEI dr~.wpdOFFICELARLSBSC:RLSBBC:RLSBNAMEEGHyltonSKMitraPTKuoCGrimesDATE 7/30/01* 7/30/01* 8/01/01* 8/02/01OFFICIAL RECORD COPY DISTRIBUTION
HARD COPY RLSB RFE. HyltonE-MAIL:PUBLICJ. Johnson W. Borchardt D. Matthews C. Carpenter C. Grimes W. Beckner B. Zalcman

J. Strosnider (RidsNrrDe)

F. Eltawila G. Bagchi K. Manoly W. Bateman J. Calvo C. Holden P. Shemanski S. Rosenberg G. Holahan T. Collins B. Boger D. Thatcher G. Galletti B. Thomas J. Moore R. Weisman M. Mayfield A. Murphy W. McDowell S. Droggitis S. Duraiswami RLSB Staff


A. Thadani R. Zimmerman C. Julian R. Gardner D. Chyu M. Modes J. Vora INSPECTION VERIFICATION ITEMSPLANT X LICENSE RENEWAL APPLICATIONSECTION 3.4: AGING MANAGEMENT OF STEAM AND POWER CONVERSION SYSTEM1.The applicant indicated that Plant X's Flow-Accelerated Corrosion (FAC) Program wasconsistent with the aging management program XI.M6, Flow Accelerated Corrosion, specified in Chapter XI of the GALL report.*Provide the FAC program description and procedures and the documentationsupporting the applicant's determination that the Plant X program is consistent with program XI.M6 as described and evaluated in the GALL report.*In an RAI response, the applicant indicated that the main feedwater piping insidethe containment as identified in Information Notice 2001-09 was inspected as part of the FAC program at Plant X. Provide the FAC inspection record for such piping.

2.The applicant's justification for not having a one-time inspection with the chemistry programto manage aging was that during routine and corrective maintenance requiring equipmentdisassembly, internal surfaces of components are visually inspected for loss of material and other aging effects.*Provide a routine maintenance program description and procedures showing thatthe operator visually inspects the internal surfaces of components for loss of material and other aging effects.*Provide 3 routine maintenance records of the steam and power conversion systemdocumenting the inspection of aging effects inside the piping. Also, provide the associated corrective action records if corrective action was deemed appropriate.3.The applicant indicated that Plant X's history had not identified any cases of watercontamination of the auxiliary feedwater lube oil. Therefore, the applicant concluded that water contamination was not considered to be applicable to this system. Provide 3 auxiliary feedwater lube oil sample reports or inspection reports to support this conclusion.

INSPECTION VERIFICATION ITEMSPLANT Y LICENSE RENEWAL APPLICATIONSECTION 3.4: AGING MANAGEMENT OF STEAM AND POWER CONVERSION SYSTEM1.In Appendix B of the LRA for the Secondary Chemistry Monitoring program, the applicantstated that operating experience at the plant had not identified any problem that would warrant a one-time inspection to confirm the adequacy of the chemistry program. The applicant further stated that the operating experience included inspections of systems and components during maintenance activities that occured routinely.

  • Provide a routine maintenance program description and procedures showing thatthe operator visually inspected the internal surfaces of components for loss ofmaterial and other aging effects.*Provide 3 routine maintenance records of the steam and power conversion systemdocumenting the inspection of aging effects inside the piping. Also, provide the associated corrective action records if corrective action was deemed appropriate.2.In the response to RAI (#19) for Plant Y (Section 3.4 of the LRA: Steam and PowerConversion System), the applicant stated that no plant specific experience had been identified of field-erected tank in contact with the ground. The applicant further stated that unless these areas were wetted no aging effects are anticipated.*Provide plant records to show that these areas were not wetted (including due toground water or moisture).*Provide information on the water table level and the drawing and elevation of thefield-erected tank.INSPECTION VERIFICATION ITEMS File: Inspn List Demo X 6 July 30, 2001PLANT X LICENSE RENEWAL APPLICATIONSECTION 3.5: CONTAINMENT, STRUCTURES, AND COMPONENT SUPPORTS1.Section 3.5.1.1 of the LRA stated that Plant X utilizes carbon steel bellows and therefore therewere no dissimilar metal welds. Provide the plant documents (such as design drawings or materials specification) to show:*There were no stainless steel elements included in the component group penetrationsleeves, bellows, and dissimilar welds.*There were no stainless steel elements in the pressure boundary portion of the fueltransfer tube containment penetration.2In response to RAI (#3.5-3), the applicant indicated that the concrete at Plant X was notexposed to aggressive river water or groundwater. Provide the documentation supporting the applicant's determination, such as groundwater pH values. In the same RAI response, the applicant indicated that the concrete had a pH greater than or equal to 12.5 per ACI 201.2R.

Provide documentation (such as fabrication or test records) to show that the concrete had a pH greater than or equal to 12.5.

3.Appendix B of the LRA indicated that Plant X's Structures Monitoring Program, with identifiedenhancements, was consistent with program XI.S6 in the GALL report. Provide the program description and procedures and the documentation supporting the applicant's determination that the Plant X program was consistent with program XI.S6 as described and evaluated in the GALL report, and enhancements that had been identified.4.In response to RAI (#3.5-8), the applicant indicated that the reactor vessel annulus outlettemperature at Plant X did not exceed 150 degrees F concrete temperature. Provide documentation supporting this determination, such as measured temperature data and/or analysis.5.Appendix B of the LRA indicates that Plant X's Containment Inservice Inspection Program wasconsistent with programs XI.S1 and XI.S2 in the GALL report. Provide the program description and procedures and the documentation supporting the applicant's determination that the Plant X program was consistent with programs XI.S1 and XI.S2 as described and evaluated in the GALL report.INSPECTION VERIFICATION ITEMS File: Inspn List Demo X 7 July 30, 2001PLANT Y LICENSE RENEWAL APPLICATIONSECTION 3.5: STRUCTURES AND STRUCTURAL COMPONENTS(CONTAINMENT STRUCTURE CONCRETE COMPONENTS)1. In response to RAI (#3.5-4), the applicant indicated that the following codes and standards apply to Plant Y's structural components as listed in the GALL report:Codes and StandardsPlant Y's structural component according toGALL Item NumberACI 201.2R-77IIA1.1-b ASTM C295-54IIA1.1-d ACI 349-85 or ACI 318-63IIA1.1-e Provide documentation (such as fabrication records) for the Plant Y structural components to show that they met these specified codes and standards.2.LRA subsection 3.5.1.1.2 eliminated the aging effect of loss of strength and modulus dueto elevated temperatures on the basis that the hot piping penetrations were designed and constructed to maintain concrete components below the degradation threshold and localized temperature limits of the ACI standards without forced ventilation. The LRA also indicated that no other containment structure concrete components were exposed to elevated temperature. In response to a staff RAI, the applicant stated that "Containment temperatures were limited by Technical Specifications to 120 F and local temperatureswere limited by design." Provide available plant records that verify non-exceedence of these temperature limits.3.Appendix B of the LRA indicated that Plant Y's Structures Monitoring Program, withidentified enhancements, was consistent with program XI.S6 in the GALL report. Provide the program description and procedures and the documentation supporting the applicant's determination that the Plant Y program was consistent with program XI.S6 as described and evaluated in the GALL report, and enhancements that had been identified.4.Appendix B of the LRA indicated that inspections had been performed in the auxiliarybuilding, containment, intake structure, and turbine building in 1996/1997 and 1999/2000.

Provide 1 inspection record for each of the above structures/buildings to support the applicant's determination that no significant deterioration had been identified in the inspections performed.

File: Inspn List Demo X 8 July 30, 2001INSPECTION VERIFICATION ITEMSLICENSE RENEWAL APPLICATIONSECTION 3.6: AGING MANAGEMENT OF ELECTRICAL AND INSTRUMENTATION AND CONTROLS1.In Section 3.6.1 of the LRA the applicant identified the Aging Management Program forNon-EQ Electrical Cables and Connectors evaluated in Chapter XI.E1 of GALL for managing aging of these components. The applicant stated that the information in the GALL report bounds Plant X. Provide the program description and procedures and the documentation supporting the applicant's determination that the Plant X program was consistent with program XI.E1 as described and evaluated in the GALL report.2.In Appendix B of the LRA, the applicant stated that the non-EQ inaccessible medium-voltage (2 kV to 15 kV) cables were designed such that moisture and voltage exposures were not significant at Plant X and the design criteria for cables assured the cables would continue to perform their intended function. Therefore, periodic testing was not required.

Provide the plant electrical design drawings and cable specifications to verify this

conclusion.3.In Section 3.6.1.2.2 of the LRA, the applicant stated that aging management of theelectrical components at Plant X was included in the Boric Acid Corrosion Program.

Therefore, a separate program for electrical components was not warranted. Provide the program description and procedures for the Plant X Boric Acid Corrosion Program to verify that it specifically included electrical components.

File: Inspn List Demo X 9 July 30, 2001NUCLEAR ENERGY INSTITUTE Project No. 690

cc:Mr. Joe BartellU.S. Department of Energy NE-42 Washington, D.C. 20585Mr. Richard P. Sedano, CommissionerState Liaison Officer Department of Public Service 112 State Street Drawer 20 Montipelier, Vermont 05620-2601National Whistleblower Center3238 P Street, N.W.

Washington, DC 20007-2756Mr. Stephen T. HaleFlorida Power & Light Company 9760 S.W. 344 Street Florida City, Florida 33035Mr. Robert GillDuke Energy Corporation Mail Stop EC-12R P.O. Box 1006 Charlotte, NC 28201-1006Mr. Charles R. PierceSouthern Nuclear Operating Co.

40 Inverness Center Parkway BIN B064 Birmingham, AL 35242Mr. David LochbaumUnion of Concerned Scientists 1707 H Street, NW Suite 600 Washington, DC 20006-3919Mr. Garry YoungEntergy Operations, Inc.

Arkansas Nuclear One 1448 SR 333 GSB-2E Russellville, Arkansas 72802