Exam 50-390, 391/2001-301 Jan 29 - Feb 6, 2001 - Final JPMs for Walk - Through Test & Admin
ML011130220
Person / Time
Site: Watts Bar  Tennessee Valley Authority icon.png
Issue date: 09/13/2000
From:
NRC/RGN-II
To:
References
-RFPFR, 50-390/01301, 50-391/01301
Download: ML011130220 (226)


See also: IR 05000390/2001301

Text

/

FINAL SUBMITTAL

WATTS BAR EXAM

50-390, 391/2001-301

JANUARY 29 - FEBRUARY 6,

2001

FINAL AS-GIVEN JPMs FOR EACH

WALK-THROUGH TEST

4r

JPMR023/Sim

Page 1 of 14

REGION II

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

B.l.b JPMR023ISim

RESPOND TO PRESSURIZER HIGH LEVEL PER FR-I.1

APPLICANT

EXAMINER

JPMR023/Sim

Page 2 of 14

REGION !1

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

Task: RESPOND TO PRESSURIZER HIGH LEVEL PER FR-I.1

Alternate Path: 1-FCV-62-69 will not open requiring the performer to use RNO and establish

excess letdown.

Facility JPM #: 3-OT-JPMR023 Rev 1

KIA Rating(s): 011A1.01 (3.5/3.6) 011A1.02 (3.3/3.5) 2.1.23 (3.9/4.0)

2.1.31 (4.2/3.9) 006A4.09 (4.1/4.2)

Task Standard: Performance of FR-I.1 which results in Excess Letdown being placed in service.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator X In-Plant Perform X Simulate

References: FR-I.1 "High Pressurizer Level" Rev. 6

Task Number:: RO-113-FRI.1-001 APPLICABLE FOR: RO/SRO

IOCFR55.45: 6

Validation Time: 17 min. Time Critical: No

Applicant: Time Start:

NAME SSN Time Finish:

Performance Rating: SAT UNSAT Performance Time

Examiner: /

NAME SIGNATURE DATE

COMMENTS

JPMR023/Sim

Page 3 of 14

SIMULATOR OPERATOR INSTRUCTIONS:

1. Initialize to IC # 145.

2. Acknowledge all alarms.

3. Ensure 1-FCV-62-69 has been over ridden to the close position.

View on ORS summary.

4. Ensure Source Range Count Rate is audible in horse shoe.

5. Freeze simulator until the performance indicates understanding of the task and time

is allowed for control board familiarization.

6. NOTE: This JPM has been preshot in IC #145. The following is the setup instructions

if needed:

Reset to IC #40

Manually initiate Reactor Trip and SI.

Allow to run until PZR level is = 94%.

Terminate SI

Establish Charging at minimum flow.

Reset 0 A isolation signal.

Transfer Steam Dumps to pressure mode and stabilize RCS temperature.

Re-establish Letdown per ES-I.1.

Ensure Letdown Valve 1-FCV-62-77 is closed.

Insert ior zdihs6269a close to override valve hand switch to close position..

Acknowledge all alarms.

FREEZE the simulator till the performer indicates an understanding of the task.

7. After performer indicates understanding of task, place simulator in run.

SIMULATOR OPERATOR INSTRUCTIONS:

ENSURE 1-FCV-62-69 has been over ridden closed.

(view override summary for zdihs6269a close)

JPMR023/Sim

Page 4 of 14

ToolslEquipment/Procedures Needed:

Ensure clean copy of FR-I.1 in all copies of Operating Instructions on the Simulator

Floor.

READ TO OPERATOR

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control

room steps shall be performed for this JPM, including any required

communications. I will provide initiating cues and reports on other actions when

directed by you. Ensure you indicate to me when you understand your assigned

task. To indicate that you have completed your assigned task return the handout

sheet I provided you.

INITIAL CONDITIONS:

An Inadvertent Safety Injection has occurred.

SI has been terminated and ECCS Pumps stopped.

While performing Step 19 of ES-I.1, the STA has determined there is a Yellow

Condition on the Inventory Status Tree due to the high Pressurizer level.

You are the OAC.

INITIATING CUES:

You have been directed by the Unit Supervisor to perform the appropriate

procedure for a Yellow Condition on Status Tree INVENTORY.

You are to notify the Unit Supervisor when the procedure has been completed.

JPMR023/Sim

Page 5 of 14

START TIME:

I

STEP 1: Obtain the correct procedure.

SAT

STANDARD: A copy of FR-I.1 has been obtained.

EXAMINER'S CUE: After the performer has demonstratedthe method of

obtaining the correct instruction,the evaluatorcan UNSAT

provide a copy of the instruction.

COMMENTS:

I-

STEP 2: [Step 1] CHECK SI terminated:

"* Both SI pumps STOPPED.

"* BIT isolated. SAT

STANDARD: Performer verifies Sl pumps stopped:

e1A-A SI Pump (green indicating lights on 1-HS-63-10A)

  • 1B-B SI pump (green indicating lights on 1-HS-63-11A) UNSAT

and:

Performer verifies BIT outlet valves are closed:

e1-FCV-63-25 (green indicating lights on 1-HS-63-25A)

e1-FCV-63-26 (green indicating lights on 1-HS-63-26A)

COMMENTS:

"**Italicized Cues Are To Be Used Only If JPM PerformanceIs Being Simulated.

JPMR023/Sim

Page 6 of 14

STEP 3: [STEP 2] ENSURE cntmt air in service:

a. Aux air press greater than 75 psig [M-15]

b. Cntmt air supply valves OPEN [M-1 5]: SAT

"* 1-FCV-32-80.

"* 1-FCV-32-102.

  • 1-FCV-32-110.

UNSAT

STANDARD: a. The performer verifies aux air pressure > 75 psig both

trains using 1-PI-32-104A & 1-PI-32-105A on M-15.

b. Valves listed are determined to be open by red indicating

lights LIT on M-15:

  • 1-HS-32-80A,
  • 1-HS-32-102A
  • 1-HS-32-11OA
    • CUE: If contacted, all air compressors are operating properly

COMMENTS:

i

CAUTION: During RCS solid water operation, any change in charging or

letdown flows could cause rapid RCS pressure changes.

STEP 4: [STEP 3] CHECK at least one charging pump RUNNING.

STANDARD: 1-HS-62-108A CCP IA-A has a red light verified to be

illuminated or amps on meter above handswitch. SAT

COMMENTS: UNSAT

"**ItalicizedCues Are To Be Used Only If JPM PerformanceIs Being Simulated.

JPMR023/Sim

Page 7 of 14

STEP 5: [STEP 4] CHECK charging flow established.

STANDARD: *Charging Flow Indicator, 1-FI-62-93A, indicating flow.

  • 1-FVC-62-90 (verified open by red lights on handswitch)
  • 1-FCV-62-91 (verified open by red lights on handswitch). SAT
  • 1-FCV-62-85 (verified open by red lights on handswitch).
  • 1-FCV-62-89 is throttled open to establish flow through the

Regen. Heat Exchanger.

UNSAT

COMMENTS:

Note To Evaluator: Step 6 will drive the performer to the RNO --

I

column. Step 7 is the RNO and the performer will NOT be able

to complete the RNO due to 1-FCV-62-69 failing to open.

I1_____________________________

STEP 6: [STEP 5] CHECK letdown in service.

STANDARD: Letdown is determined to NOT be in service by letdown flow

indicator, 1-FI-62-82, indicating no flow and letdown valves SAT

closed.

COMMENTS:

UNSAT

I _____________________________________________________

    • Italicized Cues Are To Be Used Only If JPM PerformanceIs Being Simulated.

JPMR023/Sim

Page 8 of 14

STEP 7: [STEP 5 RNO] IF charging flow established, THEN

ESTABLISH letdown:

a. OPEN letdown isolation valves.

  • 1- FCV-62-69 SAT

9 1- FCV-62-70

  • 1- FCV-62-77

STANDARD: Performer attempts to open 1-FCV-62-69 and determines the UNSAT

valve remains closed and cannot be opened by green light on

1-HS-62-69A.

    • CUE: If contacted, acknowledge the request to open valve

locally. Report back that the valve will not open locally.

NOTE TO EVALUATOR: May perform other steps of RNO, however

letdown flow will not be established.

COMMENTS:

Note To Evaluator: Step 8 will drive the performer to the RNO

column. Steps 8 through 14 are all part of this same

instruction step (8 - 13 is the RNO).

4-

STEP 8: [STEP 6] CHECK Charging and letdown flows established.

STANDARD: Performer determines that normal letdown is NOT

established and proceeds to the RNO, excess letdown is SAT

required due to normal letdown being isolated and proceeds to

the RNO column of the instruction.

UNSAT

COMMENTS:

    • ItalicizedCues Are To Be Used Only If JPM PerformanceIs Being Simulated.

JPMR023/Sim

Page 9 of 14

STEP 9: [STEP 6 RNO] PLACE excess letdown in service: CRITICAL

a. OPEN 1- FCV-70-143 STEP

b. OPEN 1- FCV-70-85.

STANDARD: 1-HS-70-143A has been placed in the OPEN position. SAT

1-HS-70-85A has been placed and held in the OPEN position

until the valve gets full open.

Step is critical to establish cooling through excess UNSAT

letdown heat exchanger.

COMMENTS:

I

STEP 10: [STEP 6 RNO]

c. OPEN 1- FCV-62-54. CRITICAL

d. OPEN 1- FCV-62-55. STEP

SAT

STANDARD: 1-HS-62-54A has been placed in the OPEN position.

1-HS-62-55A has been placed in the OPEN position.

UNSAT

Step is critical to establish cooling through excess

letdown heat exchanger.

COMMENTS:

"**ItalicizedCues Are To Be Used Only If JPM PerformanceIs Being Simulated.

JPMR023/Sim

Page 10 of 14

STEP 11: [STEP 6 RNO]

e. ENSURE 1-FCV-62-59 in NORMAL.

STANDARD: 1-HS-62-59A has been checked/placed in the normal position.

SAT

COMMENTS:

UNSAT

STEP 12: [STEP 6 RNO]

f. ADJUST 1-FCV-62-56 to maintain excess letdown heat CRITICAL

exchanger outlet temp less than 225 0 F. STEP

STANDARD: 1-H IC-62-56A pot is rotated counter clockwise to open and

temperature is maintained <225°F on 1-TI-62-58 on 1-M-5. SAT

Step is critical to prevent excess thermal stress to the

excess letdown heat exchanger.

UNSAT

NOTE TO EVALUATOR: If ARI is referenced, performer may limit

temperature to less than 2000 F.

COMMENTS:

Note To Evaluator: Steps 13 and 14 are part of the same instruction

step.

i

STEP 13: [STEP 7] CHECK RCS press:

a. Pressure less than 2335 psig.

SAT

STANDARD: RCS pressure verified to be < 2335 psig by observation of

RCS pressure instruments on the MCR.

COMMENTS: UNSAT

    • Italicized Cues Are To Be Used Only If JPM PerformanceIs Being Simulated.

JPMR023/Sim

Page 11 of 14

STEP 14: [STEP 7] CHECK RCS press:

b. Pressure less than 2260 psig.

SAT

STANDARD: RCS pressure verified to be < 2260 psig by observation of

RCS pressure instruments on the MCR.

COMMENTS: UNSAT

STEP 15: [STEP 8] CHECK PZR PORVs CLOSED.

STANDARD: Both PORV Handswitches have been located and checked SAT

closed by green lights lit on 1-HS-68-340AA & 1-HS-68-334A.

COMMENTS:

UNSAT

STEP 16: [STEP 9] CONTROL pzr heaters as necessary to establish

pzr bubble.

SAT

STANDARD: Control Bank "D" and "A-A", "B-B" Backup Heaters may be

manually energized. "C" Backup heaters are observed to be

energized due to high level in pressurizer.

UNSAT

COMMENTS:

"**ItalicizedCues Are To Be Used Only If JPM PerformanceIs Being Simulated.

JPMR023/Sim

Page 12 of 14

- - . - -- - - 1

Note I o Evaluator: Steps 17 and 18 are part of the same instruction

step.

STEP 17: [STEP 10] ENSURE PZR spray valves CLOSED.

a. CHECK normal pzr spray valves closed. SAT

STANDARD: 1-XI-68-340B & 1-XI-68-340D are checked to indicate red

lights off & green lights on.

UNSAT

NOTE TO EVALUATOR: Spray valves may be slightly open due to

integral operation.

COMMENTS:

I

STEP 18: [STEP 10] b. ENSURE aux spray valve CLOSED.

SAT

STANDARD: 1-FCV-62-84 is checked closed by green light illuminated on

1-HS-62-84A

UNSAT

COMMENTS:

+

STEP 19: [STEP 11] CONTROL charging and letdown:

a. MAINTAIN RCS pressure stable. SAT

b. DECREASE pzr level.

STANDARD: 1. PZR pressure is being maintained in its normal range by

observation of RCS pressure instruments in the MCR. UNSAT

2. PZR Level is decreasing.

COMMENTS:

I

"**Italicized Cues Are To Be Used Only If JPM Performanceis Being Simulated.

JPMR023/Sim

Page 13 of 14

STEP 20: [STEP 12] CHECK pzr Level < 92%

SAT

STANDARD: PZR Level is decreasing. If pressurizer level is _>92% then

performer returns to Step 11 of FR-I. 1 (the previous

performance step). UNSAT

    • CUE: If pressurizer level is decreasing, state that pressurizer

level is now 90%

COMMENTS:

I1

STEP 21: [STEP 13] RETURN TO instruction in effect.

SAT

STANDARD: The Unit Supervisor has been notified that FR-I.1 has been

completed and to return to the instruction in effect.

UNSAT

    • EXAMINER CUE: When notified, acknowledge the report)

COMMENTS:

END OF TASK

_________________________________

I1

TIME STOP:

    • Italicized Cues Are To Be Used Only If JPM PerformanceIs Being Simulated.

Page 14 of 14

APPLICANT CUE SHEET

(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control

room steps shall be performed for this JPM, including any required

communications. I will provide initiating cues and reports on other actions when

directed by you. Ensure you indicate to me when you understand your assigned

task. To indicate that you have completed your assigned task return the handout

sheet I provided you.

INITIAL CONDITIONS:

An Inadvertent Safety Injection has occurred.

SI has been terminated and ECCS Pumps stopped.

While performing Step 19 of ES-1.1, the STA has determined there is a Yellow

Condition on the Inventory Status Tree due to the high Pressurizer level.

You are the OAC.

INITIATING CUES:

You have been directed by the Unit Supervisor to perform the appropriate

procedure for a Yellow Condition on Status Tree INVENTORY.

You are to notify the Unit Supervisor when the procedure has been completed.

JPMR055/Sim

Page 1 of 10

REGION il

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

B.l.c JPMR055/Sim

PERFORM ADDING N2 TO COLD LEG

ACUMULATORS WHILE IN SERVICE PER SOI-63.01

APPLICANT

EXAMINER

JPMR055/Sim

Page 2 of 10

REGION 11

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

Task: PERFORM ADDING N2 TO COLD LEG ACUMULATORS WHILE IN SERVICE PER SOI-63.01

Alternate Path: N/A

Facility JPM #: 3-OT-JPMR055 Rev 0

K/A Rating(s): 006A1.13 (3.5/3.7) 2.1.23 (3.9/4.0) 2.1.30 (3.9/3.4)

Task Standard: Cold Leg Accumulator 1 pressure is with-in alarm limits, and normal alignment is re

established per SOI-63.01.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator X In-Plant Perform X Simulate

References: SOI-63.01 "Safety Injection System" Rev. 24

Task Number:: RO-063-SOI-63-016 APPLICABLE FOR: RO/SRO

IOCFR55.45: 3, 4, 6, 7

Validation Time: 10 min. Time Critical: No

Applicant: Time Start:

NAME SSN Time Finish:

Performance Rating: SAT _ UNSAT Performance Time

Examiner: /

NAME SIGNATURE DATE

COMMENTS

JPMR055/Sim

Page 3 of 10

SIMULATOR OPERATOR INSTRUCTIONS:

1. Initialize to IC # 146 100% steady state power.

2. Acknowledge all alarms.

3. Freeze simulator until the performance indicates understanding of the task and time

is allowed for control board familiarization.

4. NOTE: This JPM has been preshot in IC #146. The following is the setup instructions

if needed:

Initialize to IC # 40.

Vent Cold Leg Accumulator 1 to 610 to 620 psig as follows:

Place 1-HS-63-127A in Open Position.

Place 1-HIC-63-65A in Open Position.

Close both valves after pressure is lowered.

Ensure 1-HS-63-64A, in the CLOSE position.

Acknowledge all alarms

5. After performer indicates understanding of task, place simulator in run.

SIMULATOR OPERATOR INSTRUCTIONS:

NONE

JPMR055ISim

Page 4 of 10

Tools/Equipment/Procedures Needed:

Ensure clean copy of SOI-63-01 in all copies of Operating Instructions on the Simulator

Floor.

READ TO OPERATOR

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control

room steps shall be performed for this JPM, including any required

communications. I will provide initiating cues and reports on other actions when

directed by you. Ensure you indicate to me when you understand your assigned

task. To indicate that you have completed your assigned task return the handout

sheet I provided you.

INITIAL CONDITIONS:

The Unit is at 100% RTP

Cold Leg Accumulator (CLA) 1 pressure Hi/Lo alarm is illuminated.

You are the Operator at the Controls (OAC).

INITIATING CUES:

The Unit Supervisor directs you to increase CLA 1 Nitrogen Pressure to normal

by adding Nitrogen.

You are to notify Unit Supervisor when you have completed the task.

JPMR055/Sim

Page 5 of 10

START TIME:

STEP 1: Obtain a copy of the procedure.

SAT

STANDARD: A copy of SOI-63.01 section 8.6 has been obtained

EXAMINER'S CUE: After the performerhas demonstratedthe method of

obtaining the correctinstruction, the evaluatorcan UNSAT

provide a copy of the instruction.

COMMENTS:

CAUTION: Adding N2 to more than one CLA at a time while they are required

to be operable places the plant outside design basis. This section

is to be used to add N2 to any selected single CLA. If more than

one CLA needs N2 , separate evolutions must be performed.

NOTE e This section adds N2 to in-service CLAs that are indicating normal

level, and have a N2 atmosphere.

" If N2 is added to a CLA with low level, subsequent level rises could

result in overpressurizing the CLA with associated airborne

release.

" Rising CLA level may restore CLA pressure to within limits without

adding N2.

4

STEP 2: [Step 1] IF CLA level needs to be raised prior to adding N2,

THEN GO TO Section 8.3.

STANDARD: Performer determines that level in CLA Accumulator #1 is SAT

adequate by checking 1-LI-63-119 and -129 or from initiating

cue and proceeds to the next step.

UNSAT

COMMENTS:

"**Italicized Cues Are To Be Used Only If JPM PerformanceIs Being Simulated.

JPMR055/Sim

Page 6 of 10

STEP 3: [STEP 2] OPEN applicable valve to place corresponding PCV

in service (N/A valve NOT used*:

NOMENCLATURE LOCATION POSITION UNID

N2 BANK A CNTMT ISOL A9X/729 OPEN 0-ISV-77-859A

(0-PCV-77-253)

N2 BANK B CNTMT ISOL A9X/729 OPEN 0-ISV-77-859B

(0-PCV-77-254)

STANDARD: Performer contacts an AUO to open either 0-ISV-77-859A or SAT

0-ISV-77-859B.

    • CUE: When contacted, respond as AUO, acknowledge request

using repeat back, then report that valve 0-ISV-77-859A UNSAT

or B has been opened (valve requested to be opened).

COMMENTS:

I-

CAUTION The consequences of not verifying I-FCV-63-65 closed in

the next step could cause the pressure to drop below T/S

limit.

+

STEP 4: [STEP 3] ENSURE the following: CRITICAL

STEP

NOMENCLATURE LOCATION POSITION UNID

CLA N2 VENT HDR CONTROL 1-M-6 CLOSED 1-HIC-63-65

N2 HDR TO CL ACCUMS 1-M-6 OPEN 1-FCV-63-64

STANDARD: 1-HIC-63-65 controller output is 0%. Hand switch for I-HS-63 SAT

64A has been placed in the OPEN position.

Step is critical to assure N2 is aligned to header that

supplies CLA's. UNSAT

NOTE TO EVALUATOR: Underlined portion is critical.

COMMENTS:

"**Italicized Cues Are To Be Used Only If JPM PerformanceIs Being Simulated.

JPMR055/Sim

Page 7 of 10

STEP 5: [STEP 4] PERFORM the following for selected N2 supply (N/A CRITICAL

vlvs not selected): STEP

NOMENCLATURE LOCATION POSITION UNID

N2 TO CL ACCUM 1 1-M-6 OPEN 1-FCV-63-127

N2 TO CL ACCUM 2 1-M-6 OPEN 1-FCV-63-107

N2 TO CL ACCUM 3 1-M-6 OPEN 1-FCV-63-87

N2 TO CL ACCUM 4 1-M-6 OPEN 1-FCV-63-63

STANDARD: Hand switch for 1-HS-63-127A has been placed in the OPEN SAT

position and 1-FCV-63-127 is verified open with associated

hand switch red light ON green light OFF.

Step is critical to open flow path to supply N2 to CLA UNSAT

Accumulator #1.

NOTE TO EVALUATOR: Underlined portion is critical.

COMMENTS:

i

STEP 6: [STEP 5] WHEN CLA(s) at desired pressure, THEN CRITICAL

PERFORM the following for selected N 2 sup (N/A vlvs not STEP

selected):

NOMENCLATURE LOCATION POSITION UNID

N2 TO CL ACCUM 1 1-M-6 CLOSED 1-FCV-63-127

N2 TO CL ACCUM 2 1-M-6 CLOSED 1-FCV-63-107

N2 TO CL ACCUM 3 1-M-6 CLOSED 1-FCV-63-87

N2 TO CL ACCUM 4 1-M-6 CLOSED 1-FCV-63-63

STANDARD: After pressure has been restored to Ž 617 psig & < 660 psig on SAT

1-PI-63-128 &/or PI-63-128, 1-HS-63-127A is placed in the

CLOSE position. and 1-FCV-63-127 is verified closed with

associated hand switch green light ON red light OFF.

UNSAT

Step is critical to close flow of N2 flow path to CLA

Accumulator #1.

NOTE TO EVALUATOR: Underlined portion is critical.

COMMENTS:

    • ItalicizedCues Are To Be Used Only If JPM PerformanceIs Being Simulated.

JPMR055/Sim

Page 8 of 10

STEP 7: [STEP 6] CLOSE 1-FCV-63-64, N2 HDR TO CL ACCUMS

CRITICAL

STANDARD: Hand switch for 1-HS-63-64A has been placed in the CLOSE STEP

position.

Step is critical to close second valve in flow path to CLA SAT

Accumulator #1.

COMMENTS: UNSAT

STEP 8: [STEP 7] ENSURE selected CLA is at desired press [Alarm

131-134-B, CL ACCUM 1(2,3,4) PRESS HI/LO]

STANDARD: Annunciator alarm window 131-B is checked DARK. SAT

COMMENTS:

UNSAT

STEP 9: [STEP 8] WHEN Accumulator N 2 fill COMPLETE, THEN

PERFORM the following:

NOMENCLATURE LOCATION POSITION UNID

N2 BANK A CNTMT ISOL A9X/729 CLOSED 0-ISV-77-859A

(0-PCV-77-253)

N2 BANK B CNTMT ISOL A9X/729 CLOSED 0-ISV-77-859B

(0-PCV-77-254)

STANDARD: Performer contacts an AUO to close the valve opened earlier SAT

(JPM Step 3) either 0-ISV-77-859A or 0-ISV-77-859B.

    • CUE: When contacted, respond as AUO, acknowledge request

using repeat back, then report that valve 0-ISV-77-859A UNSAT

or B has been closed (valve requested to be closed). The

Rad waste AUO has completed the IV.

COMMENTS:

"**ltalicizedCues Are To Be Used Only If JPM PerformanceIs Being Simulated.

JPMR055/Sim

Page 9 of 10

STEP 10: Notify the Unit Supervisor that N2 addition to CLA 1 is

complete.

SAT

STANDARD: Unit Supervisor has been notified that N2 addition to CLA 1

has been completed.

UNSAT

    • CUE: When notified, acknowledge the report using "repeat

back"

COMMENTS:

END OF TASK

TIME STOP:

    • ltalicizedCues Are To Be Used Only If JPM PerformanceIs Being Simulated.

Page 10 of 10

APPLICANT CUE SHEET

(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed.. All control

room steps shall be performed for this JPM, including any required

communications. I will provide initiating cues and reports on other actions when

directed by you. Ensure you indicate to me when you understand your assigned

task. To indicate that you have completed your assigned task return the handout

sheet I provided you.

INITIAL CONDITIONS:

The Unit is at 100% RTP

Cold Leg Accumulator (CLA) 1 pressure HilLo alarm is illuminated.

You are the Operator at the Controls (OAC).

INITIATING CUES:

The Unit Supervisor directs you to increase CLA 1 Nitrogen Pressure to normal

by adding Nitrogen.

You are to notify Unit Supervisor when you have completed the task.

JPMR028A/Sim

Page 1 of 18

REGION II

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

B.l.d JPMR028A/Sim

START A REACTOR COOLANT PUMP PER SOI-68.02

APPLICANT

EXAMINER

JPMR028A/Sim

Page 2 of 18

REGION I!

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

Task: START A REACTOR COOLANT PUMP PER SOI-68.02

Alternate Path: After RCP is started, its #1 seal will fail requiring the performer to stop the

RCP based on pump bearing temperature.

Facility JPM #: 3-OT-JPMR028A Rev 3

K/A Rating(s): 003K1.03 (3.3/3.6) 003K1.12 (3.0/3.3) 003A.3.01 (3.3/3.2)

003A3.03 (3.2/3.1) 003A3.04 (3.6/3.6) 003A.4.01 (3.3/3.2)

003A4.04 (3.1/3.0)

Task Standard: RCP #1 is started per SOI-68.02. Then RCP #1 is stopped due to high bearing

temperature.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator X In-Plant Perform X Simulate

References: SOI-68.02 "Reactor Coolant Pumps" Rev. 15

AOI-24 "RCP Seal Abnormalities During Pump Operation" Rev 20

Task Number:: RO-068-SOI-68-007 APPLICABLE FOR: RO/SRO

IOCFR55.45: 3, 4, 6, 7

Validation Time: 18 min. Time Critical: No

Applicant: Time Start:

NAME SSN Time Finish:

Performance Rating: SAT _ UNSAT _ Performance Time

Examiner: /

NAME SIGNATURE DATE

COMMENTS

JPMR028A/Sim

Page 3 of 18

SIMULATOR OPERATOR INSTRUCTIONS:

1. Initialize to IC # 147 BOL Mode 3..

2. Acknowledge all alarms.

3. Freeze simulator until the performance indicates understanding of the task and time

is allowed for control board familiarization.

4. NOTE: This JPM has been preshot in IC #147. The following is the setup instructions

if needed:

Initialize to IC # 49.

Drive control banks to 0 steps.

Place HS-68-8BA (RCP # 1) in the STOP position.

Place HS-68-8AA (RCP # 1) in the PUSHED IN position.

Plave 1-PIC-68-340D "Loop 1 Spray Control" in MANUAL and CLOSED

Insert the following:

ior zdihs629a (el) open RCP #1 Seal Return Valve OPEN to manual trigger 1.

imf cv17a (el) 100 to fail seal #1 on RCP #1 to 100% is assigned to manual

trigger 1.

Ensure the following indications are correct:

- #1 Seal AP > 200 psig

- Thermal Barrier Flow Ž_ 40 gpm

- Lower Bearing Flow > 5 gpm

- Upper Bearing Flow > 150 gpm

- Seal Water HTX Flow > 215 gpm

- RCP Seal Flow 8 to 13 gpm

- VCT Pressure >_17 psig

- Seal Leakoff > 0.2 gpm

- Aux Overcurrent Protection ACB Indicating Lights Energized

Acknowledge all alarms.

5. After performer indicates understanding of task, place simulator in run.

SIMULATOR OPERATOR INSTRUCTIONS:

After performer has stopped #1 RCP's Oil Lift Pump (Performance step 23) than insert

the following over rides by activating manual trigger 1: imf itrigger

ior 62hs9a open to fail #1 RCP Seal Return open.

imf cvl 7a 100 to fail #1 seal to 100%

JPMR028A/Sim

Page 4 of 18

ToolslEquipment/Procedures Needed:

Ensure clean copy of SOI-68.02 in all copies of Operating Instructions on the Simulator

Floor.

READ TO OPERATOR

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control

room steps shall be performed for this JPM, including any required

communications. I will provide initiating cues and reports on other actions when

directed by you. Ensure you indicate to me when you understand your assigned

task. To indicate that you have completed your assigned task return the handout

sheet I provided you.

INITIAL CONDITIONS:

The Unit is in Mode 3, Hot Standby.

RCP # 1 has been shut down 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for repairs to the motor leads.

Maintenance reported the repairs have been completed.

An AUO has performed Checklist 3, RCP Local Inspection.

All conditions are normal.

You are the Operator at the Controls (OAC).

INITIATING CUES:

The Unit Supervisor has directed you to start RCP #1 per procedure.

You are to notify the Unit Supervisor when the procedure is complete.

JPMR028A/Sim

Page 5 of 18

START TIME:

STEP 1: Obtain a copy of the procedure.

SAT

STANDARD: A copy of SOI-68.02 section 5.0 has been obtained

EXAMINER'S CUE: After the performerhas demonstratedthe method of

obtainingthe correctinstruction,the evaluatorcan UNSAT

provide a copy of the instruction.

COMMENTS:

i

NOTE This instruction may be repeated as deemed necessary by the

US/SRO.

I1

STEP 2: [Step 1] REVIEW Section 3.0, Precautions and Limitations.

STANDARD: Section 3.0 has been reviewed.

SAT

COMMENTS:

UNSAT

4-

STEP 3: [Step 2] VERIFY Section 4.2, Field Preparations,

COMPLETE.

STANDARD: Section 4.2 has been checked complete. SAT

    • CUE: Inform performer that Section 4.2 has been completed.

UNSAT

COMMENTS:

I ____________________________

"**ItalicizedCues Are To Be Used Only If JPM PerformanceIs Being Simulated.

JPMR028A/Sim

Page 6 of 18

NOTE RCP status may be checked by remote indications if cntmt

conditions do not permit access per PAI-2.03.

NOTE Step [3] is NIA if not performed.

STEP 4: [Step 3] IF containment conditions permit access, THEN

PERFORM Checklist 3, "RCP Local Inspection". SAT

STANDARD: Information given in initial conditions. No action required.

UNSAT

    • CUE: If asked, the local checklist 3 has been performed

COMMENTS:

STEP 5: [STEP 4] WHEN RCS press is greater than 100 psig,

ENSURE the following:

NOMENCLATURE LOCATION POSITION UNID

RCP 1 SEAL RETURN 1-M-5 OPEN 1-FCV-62-9

RCP 2 SEAL RETURN 1-M-5 OPEN 1-FCV-62-22

RCP 3 SEAL RETURN 1-M-5 OPEN 1-FCV-62-35

RCP 4 SEAL RETURN 1-M-5 OPEN 1-FCV-62-48

STANDARD: Performer verifies red open indication for above valves are lit. SAT

COMMENTS:

UNSAT

"**Italicized Cues Are To Be Used Only If JPM PerformanceIs Being Simulated.

  • JPMR028A/Sim

Page 7 of 18

NOTE: Procedure step [5] & [6] are NIA if not performed.

Performance Step 6 and Step 7 relate to the Procedure Steps 5 & 6

STEP 6: [Step 5] IF no RCP's are in service THEN

EVALUATE the following criteria to determine if a potential SAT

"pocket" of low boron concentration exists:

"* Plant configuration since the last RCP was removed from

service (unexplainable decrease in Primary Water Storage

Tank level since last RCP was removed from service. UNSAT

"* Change in RCS boron concentration since last RCP was

removed from service.

"* Loss of 0ffsite power during post refueling dilution to

criticality.

"* During refueling, the Cold Leg Accumulator level decrease

without a corresponding increase in Hold Up Tank level.

"* Any natural circulation cooldown where boration has

occurred.

  • Any Post SGTR condition where natural circulation

cooldown has occurred.

STANDARD: Performer determines that step in not applicable and N/As

step.

COMMENTS:

"**ItalicizedCues Are To Be Used Only lf JPM PerformanceIs Being Simulated.

JPMR028A/Sim

Page 8 of 18

STEP 7: [Step 6] IF a "pocket" is suspected in RCS THEN

EVALUATE the following criteria to determine if a potential SAT

"pocket" of low boron concentration exists:

Plant configuration since the last RCP was removed from

service (unexplainable decrease in Primary Water Storage

Tank level since last RCP was removed from service. UNSAT

[a] INITIATE sampling of boron concentration for the

potential areas of concern.

[b] EVALUATE the samples to determine potential

"pockets" of low concentration boron in the RCS.

[c] COORDINATE with Reactor Engineering to develop an

ACTION PLAN to address the "pocket" of low boron

concentration.

[d] DO NOT start an RCP, UNTIL

ACTION PLAN has addressed the "pocket" of low

boron concentration.

STANDARD: Performer determines that step in not applicable and N/As

step.

COMMENTS:

NOTE: Procedure Steps [7] thru [23] are performed for each RCP to

be started.

STEP 8: [Step 7] ENSURE the following parameters [0-M-27B]:

[a] Thermal Barrier Flow 35-50 gpm SAT

[b] LWR Oil CIr flow greater than 5 gpm

[c] UPR Oil CIr flow greater than 170 gpm

[d] RCP Seal Water Hx flow greater than 215 gpm

UNSAT

STANDARD: Thermal Barrier (1-FI-70-115), Lower oil cooler (1-FI-70-119),

Upper oil cooler (1-FI-70-116), and Seal Water HTX (1-FI-70

176) flows of specified values are verified.

COMMENTS:

"**ItalicizedCues Are To Be Used Only If JPM PerformanceIs Being Simulated.

JPMR028A/Sim

Page 9 of 18

CAUTION Inadvertent RCP start may occur if RCP alternate supply

breaker is left in its automatic configuration (pulled out).

NOTE Oil Lift Pump is started 2 minutes before RCP start.

STEP 9: [STEP 8] ENSURE the following: CRITICAL

STEP

NOMENCLATURE LOCATION POSITION UNID

RCP 1 NORMAL BKR & LIFT 1-M-5 PULL OUT, 1-HS-68-8AA

PUMP THEN START

RCP 2 NORMAL BKR & LIFT 1-M-5 PULL OUT, 1-HS-68-31AA

PUMP THEN START

RCP 3 NORMAL BKR & LIFT 1-M-5 PULL OUT, 1-HS-68-50AA

PUMP THEN START

RCP 4 NORMAL BKR & LIFT 1-M-5 PULL OUT, 1-HS-68-73AA

PUMP THEN START

STANDARD: Hand switch 1-HS-68-8AA has been "pulled out" and placed to SAT

the START position.

Step is critical to assure oil lift pressure thrust bearings to

prevent metal to metal contact on bearing surfaces when UNSAT

pump is started from idle.

COMMENTS:

STEP 10: [Step 9] VERIFY #1 seal AP greater than 200 psid [1-M-5].

SAT

STANDARD: #1 seal AP for RCP 1 verified greater than 200 psid on 1-PDI

62-8A.

UNSAT

COMMENTS:

"**Italicized Cues Are To Be Used Only If JPM PerformanceIs Being Simulated.

JPMR028A/Sim

Page 10 of 18

I

STEP 11: [Step 10] VERIFY 8 to 13 gpm to RCP seal [1-M-5].

SAT

STANDARD: RCP I seal flow indicated between 8 and 13 gpm verified on 1

FI-62-1A.

UNSAT

NOTE TO EVALUATOR: Performer may make adjustment of seal injection

flow.

COMMENTS:

I

STEP 12: [Step 11] ENSURE VCT press at least 15 psig [1-M-6].

SAT

STANDARD: VCT indicated pressure verified greater than 15 psig on 1-PI

62-122.

UNSAT

COMMENTS:

i

STEP 13: [Step 12] VERIFY #1 seal leakoff greater than 0.2 gpm or

within Normal Operating Range for existing #1 Seal AP (see SAT

Appendix B).

UNSAT

STANDARD: Seal leakoff from RCP 1 verified greater than 0.2 gpm or within

Normal Operating Range by red pen of 1-FR-62-23 and 24

respectively.

COMMENTS:

"**ItalicizedCues Are To Be Used Only If JPM Performanceis Being Simulated.

JPMR028A/Sim

Page 11 of 18

I

STEP 14: [Step 13] IF leakoff flow is not established, THEN GO TO

Section 8.0. SAT

STANDARD: Performer verifies seal flow established and goes to next step.

UNSAT

COMMENTS:

STEP 15: [Step 14] ENSURE RCS press is greater than 325 psig but

less than 1000 psig. SAT

[a] OPEN 1-FCV-62-53, #1 SEAL BYPASS [1-M-51 to VENT

RCP.

[b] CLOSE 1-FCV-62-53, #1 SEAL BYPASS [1-M-5].

UNSAT

STANDARD: Performer determines that this step does not apply and

proceeds to the next step.

COMMENTS:

NOTE: Step [15] prevents excessive Rod motion upon starting RCP.

NOTE TO EVALUATOR: The above note refers to JPM Step 16, I

______________

i

STEP 16: [Step 15] IF restarting RCP with Control Rods withdrawn,

THEN PLACE Rod Bank Select in MANUAL after matching SAT

Tavg with Tref.

UNSAT

STANDARD: Performer determines that this step does not apply, NAs this

step and proceeds to the next step.

COMMENTS:

    • Italicized Cues Are To Be Used Only If JPM PerformanceIs Being Simulated.

JPMR028A/Sim

Page 12 of 18

CAUTION To reduce thermal shock to RCP shaft and seals, a maximum

of 1°F per minute temp reduction will be observed, until

bearing temp is less than 225 0 F.

STEP 17: [Step 16] IF restarting RCP after stopping due to high temp

limits caused by loss of Injection Water and High CCS temp, SAT

THEN ENSURE following parameters established to prevent

thermal shock to RCP parts:

[a] CCS temp to thermal barrier less than 105°F (CCS Hx

outlet). UNSAT

[b] Seal leakoff temp less than 180'F.

[c] 0.2 to 5 gpm seal flow

STANDARD: Performer determines that this step does not apply and

proceeds to the next step.

    • CUE: If asked, inform performer that this condition does not

apply to current situation.

COMMENTS:

STEP 18: [Step 17] ENSURE Aux OC Bkr, CLOSED.

SAT

STANDARD: Performer verifies red ACB position indicating light for RCP 1

Aux Overcurrent Protection ACB illuminated.

UNSAT

COMMENTS:

"**Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated.

JPMR028A/Sim

Page 13 of 18

STEP 19: [Step 18] IF starting RCP 1, THEN ENSURE Pzr spray, 1

PCV-68-340D, is CLOSED. SAT

STANDARD: 1-PCV-68-340D has been checked in the CLOSED position by

1-XI-68-340D green light lit. UNSAT

COMMENTS:

STEP 20: [Step 19] IF starting RCP 2, THEN ENSURE Pzr spray, 1

PCV-68-340B, is CLOSED. SAT

STANDARD: NO action required, not starting loop #2 RCP, however 1

PCV-340B may be checked in the CLOSED position by 1-XI UNSAT

68-340B green light lit.

COMMENTS:

i

STEP 21: [Step 20] ANNOUNCE RCP start on plant PA system.

SAT

STANDARD: Performer simulates announcement of RCP start on plant PA

system.

UNSAT

COMMENTS:

    • ltalicized Cues Are To Be Used Only If JPM PerformanceIs Being Simulated.

JPMR028A/Sim

Page 14 of 18

NOTE: Below 15% power with station service NOT transferred, the

Alternate handswitch is used to start RCP.

STEP 22: [STEP 21] START selected RCP (N/A HSs not used): CRITICAL

STEP

NOMENCLATURE LOCATION POSITION UNID

RCP 1 NORMAL BKR & LIFT 1-M-5 PUSH IN, 1-HS-68-8AA

PUMP THEN START

RCP 1 ALTERNATE BKR & 1-M-5 PUSH IN, 1-HS-68-8BA

XFER SELECTOR THEN START

RCP 2 NORMAL BKR & LIFT 1-M-5 PUSH IN, 1-HS-68-31AA

PUMP THEN START

RCP 2 ALTERNATE BKR & 1-M-5 PUSH IN, 1-HS-68-31 BA

XFER SELECTOR THEN START

RCP 3 NORMAL BKR & LIFT 1-M-5 PUSH IN, 1-HS-68-50AA

PUMP THEN START

RCP 3 ALTERNATE BKR & 1-M-5 PUSH IN, 1-HS-68-50BA

XFER SELECTOR THEN START

RCP 4 NORMAL BKR & LIFT 1-M-5 PUSH IN, 1-HS-68-73AA

PUMP THEN START

RCP 4 ALTERNATE BKR & 1-M-5 PUSH IN, 1-HS-68-73BA

XFER SELECTOR THEN START

STANDARD: 1-HS-68-8BA has been pushed in and placed to the START SAT

position, and RCP 1 amps and flow verified to be within proper

range after appropriate time delay (pump is up to normal

speed).

UNSAT

Step is critical to close breaker supplying RCP #1.

COMMENTS:

I _____________

"**ItalicizedCues Are To Be Used Only If JPM PerformanceIs Being Simulated.

JPMR028A/Sim

Page 15 of 18

1

STEP 23: [STEP 22] WHEN RCP has operated 1 minute, THEN STOP

Oil Lift Pump with applicable handswitch (N/A HSs not used):

NOMENCLATURE LOCATION POSITION

RCP 1 NORMAL BKR & LIFT 1-M-5 PULL OUT,

PUMP THEN STOP

RCP 2 NORMAL BKR & LIFT 1-M-5 PULL OUT,

PUMP THEN STOP

RCP 3 NORMAL BKR & LIFT 1-M-5 PULL OUT,

PUMP THEN STOP

RCP 4 NORMAL BKR & LIFT 1-M-5 PULL OUT,

PUMP THEN STOP

STANDARD: Handswitch 1-HS-68-8AA has been "pulled out" and placed to SAT

the STOP position.

UNSAT

COMMENTS:

+1

CONSOLE OPERATOR inserts the following when oil lift pump is stopped:

OVERRIDE 62HS9A TO FAIL 'AS IS' (#1 RCP Seal Return)

INSERT MALFUNCTION CV17A @ 100% -FAILS #1 SEAL

--- I

STEP 24: Performer transitions to AOI-24 or performer determine that the

bearing temperature will exceed limit and stops the Reactor CRITICAL

Cooling pump. STEP

STANDARD: Performer transitions to AOI-24 or 1-HS-68-8BA is placed in

SAT

the STOP position and green ACB position indicating light is

illuminated.

Step is to prevent additional damage to RCP #1 Seal

UNSAT

Package.

NOTE TO EVALUATOR: Underlined portion critical if performed at this

time. The performer may elect to stop RCP since it was

just started.

COMMENTS:

I

"**ltalicizedCues Are To Be Used Only If JPM PerformanceIs Being Simulated,

JPMR028A/Sim

Page 16 of 18

NOTE TO EVALUATOR: The following steps are from AOI-24 Section

3.2. The performer may refer to ARI for 99D or IOOD.

CAUTION A seal leakoff rise to greater than 2.0 gpm AFTER

experiencing low leakoff of less than 0.8 gpm may indicate

seal degradation. Plant Management should be notified of

leakoff trends.

NOTE Anytime #1 seal leakoff flow exceeds the values shown on

attachment 1, system engineering should be requested to

perform an evaluation of the #11 seal condition.

During plant startup after seal maintenance, the #1 seal

may require 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of run time before the seal fully seats

fully and operates normally.

The #1 seal return should be isolated between 3 and 5

minutes after tripping an RCP to allow for pump

coastdown.

+

STEP 25: [Step 1] MONITOR #1 seal leakoff equal to or greater than

6.0 gpm.

SAT

STANDARD: Performer determines seal leakoff flow is equal to or greater

than 6 gpm by checking Seal Leakoff - High Range - flow

recorder 1-FR-62-24 Red Pen.

UNSAT

COMMENTS:

+

STEP 26: [Step 2] MONITOR RCPs lower bearing and #1 seal outlet

temp STABLE or DROPPING.

SAT

STANDARD: Performer determines RCPs lower bearing and #1 seal outlet

temperatures are increasing and transitions to the RNO

column.

UNSAT

COMMENTS:

"**Italicized Cues Are To Be Used Only If JPM PerformanceIs Being Simulated.

JPMR028A/Sim

Page 17 of 18

STEP 27: [Step 2 RNO] IF reactor power greater than P8, THEN TRIP

CRITICAL

reactor.

IF reactor power less than or equal to P-8 THEN PLACE rods STEP

in MAN.

STOP affected RCP.

SAT

STANDARD: 1-HS-68-8BA is placed in the STOP position and green ACB

position indicating light is illuminated. Step is to prevent

additional damage to RCP #1 Seal Package.

UNSAT

    • CUE: After RCP is stopped, state that we will stop here.

COMMENTS:

END OF TASKI

TIME STOP:

    • ItalicizedCues Are To Be Used Only If JPM PerformanceIs Being Simulated.

Page 18 of 18

APPLICANT CUE SHEET

(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control

room steps shall be performed for this JPM, including any required

communications. I will provide initiating cues and reports on other actions when

directed by you. Ensure you indicate to me when you understand your assigned

task. To indicate that you have completed your assigned task return the handout

sheet I provided you.

INITIAL CONDITIONS:

The Unit is in Mode 3, Hot Standby.

RCP # 1 has been shut down 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for repairs to the motor leads.

Maintenance reported the repairs have been completed.

An AUO has performed Checklist 3, RCP Local Inspection.

All conditions are normal.

You are the Operator at the Controls (OAC).

INITIATING CUES:

The Unit Supervisor has directed you to start RCP #1 per procedure.

You are to notify the Unit Supervisor when the procedure is complete.

JPMR039/Sim

Page 1 of 8

REGION II

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

B.l.e JPMR039/Sim

START A THERMAL BARRIER BOOSTER PUMP PER

SOI-70.01

APPLICANT

EXAMINER

JPMR039/Sim

Page 2 of 8

REGION II

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

Task: START A THERMAL BARRIER BOOSTER PUMP PER SOI-70.01

Alternate Path: N/A

Facility JPM #: 3-OT-JPMR039 Rev 5

K/A Rating(s): 008A4.01 [3.3/3.1] 008A4.08 [3.1"/2.8]

Task Standard: 1A-A TBBP running with control switch in A-P AUTO (pulled out) and 1B-B TBBP

control switch in A-P Auto (pulled out).

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator X In-Plant Perform X Simulate

References: SOI-70.01 "Component Cooling Water (CCS)" Rev. 39

Task Number:: RO-070-SOI-70-020 APPLICABLE FOR: RO/SRO

ICFR55.45: 3, 4, 6, 7

Validation Time: 7 min. Time Critical: No

Applicant: Time Start:

NAME SSN Time Finish:

Performance Rating: SAT__ UNSAT _ Performance Time

Examiner: /

NAME SIGNATURE DATE

COMMENTS

JPMR039/Sim

Page 3 of 8

SIMULATOR OPERATOR INSTRUCTIONS:

1. Initialize to IC # 156 place the simulator in run.

2. Acknowledge all alarms.

3. Shutdown T.B. Booster pumps and pull to lock.

4. Place simulator in run and clear all alarms.

5. Reset Hi-Flux at shutdown alarm at NI cabinet.

6. Ensure Source Range Count is Audible in Control Room.

SIMULATOR OPERATOR INSTRUCTIONS:

NONE

JPMR039/Sim

Page 4 of 8

Needed:

Tools/Equipment/Procedures

Ensure clean copy of SOI-70.01 in all copies of Operating Instructions on the Simulator

Floor.

READ TO OPERATOR

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control

room steps shall be performed for this JPM, including any required

communications. I will provide initiating cues and reports on other actions when

directed by you. Ensure you indicate to me when you understand your assigned

task. To indicate that you have completed your assigned task return the handout

sheet I provided you.

INITIAL CONDITIONS:

Plant start-up after refueling outage which required complete shutdown of the

Component Cooling Water System (CCS).

The CCS has been return to service and is operating normally except for the Thermal

Barrier Booster Pumps (TBBP) which are shutdown.

Both TBBPs have been aligned and are available for service.

You are the OAC operator.

INITIATING CUES:

The Unit Supervisor has directed you to place IA-A TBBP in service and align

both TBBP control switches in normal alignment per the procedure.

You are to notify the Unit Supervisor when the procedure has been completed.

JPMR039/Sim

Page 5 of 8

START TIME:

STEP 1: Obtain a copy of the procedure.

STANDARD: -SAT

A copy of SOI-70.01 Section 5.4 has been obtained.

EXAMINER'S CUE: After the performer has demonstrated the method of

obtainingthe correctinstruction,the evaluatorcan UNSAT

provide a copy of the instruction.

    • CUE: If asked, all of section 4.0 has been completed.

COMMENTS:

STEP 2: [Step 1] ENSURE Section 5.1 and 5.3 COMPLETE

STANDARD: Performer has determined that CCS has been determined to

be aligned, filled, and vented per task assignment. SAT

    • CUE: When checked, Sections 5.1 and 5.3, have been

performed

CMNSUNSAT

COMMENTS:

I______________

"**Italicized Cues Are To Be Used Only If JPM PerformanceIs Being Simulated.

JPMR039/Sim

Page 6 of 8

STEP 3: [Step 2] START either of the following (N/A pump not started): CRITICAL

STEP

NOMENCLATURE LOCATION POSITION UNID

THRM BAR BSTR PMP 1A 0-M-27B START 1-HS-70-131A

(TBBP)

THRM BAR BSTR PMP 1B 0-M-27B START 1-HS-70-130A

(TBBP)

STANDARD: 1-HS-70-131A has been placed in the START position. SAT

Step is critical in starting TBBP to establish flow.

COMMENTS: UNSAT

i

STEP 4: [STEP 3 ] MONITOR increase flow to approximately 160 gpm

on 1-FI-70-81, TH BAR RET HDR FLOW [0-M-27B].

SAT

STANDARD: 1-FI-70-81 has been checked for flow increase.

COMMENTS: UNSAT

I

STEP 5: [STEP 4] IF TBBP 1A is running (or available), THEN CRITICAL

ENSURE 1-HS-70-130A, THRM BAR BSTR PMP 1B (TBBP) STEP

in A-P AUTO.

STANDARD: 1-HS-70-130A has been placed in A-P AUTO position (pulled SAT

out).

Step is critical to ensure that pumps control switches are

aligned for either a process or accident signal. UNSAT

COMMENTS:

"**Italicized Cues Are To Be Used Only If JPM PerformanceIs Being Simulated.

JPMR039/Sim

Page 7 of 8

STEP 6: [STEP 5 ] IF TBBP 1B is running (or available), THEN CRITICAL

ENSURE 1-HS-70-131A, THRM BAR BSTR PMP 1A (TBBP) STEP

in A-P AUTO.

SAT

STANDARD: 1-HS-70-131A has been placed in A-P AUTO position (pulled

out).

Step is critical to ensure that pumps control switches are UNSAT

aligned for either a process or accident signal.

COMMENTS:

I-

STEP 7: Notify the Unit Supervisor that 1A-A TBBP Pump is running

both TBBP pumps hand switches are in A-P AUTO.

SAT

STANDARD: The Unit Supervisor has been notified that 1A-A TBBP Pump

is running and both TBBP hand switches are in A-P-AUTO.

UNSAT

    • CUE: When notified, acknowledge the report using repeat

back.

COMMENTS:

END OF TASK

TIME STOP:

"**Italicized Cues Are To Be Used Only If JPM PerformanceIs Being Simulated.

Page 8 of 8

APPLICANT CUE SHEET

(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control

room steps shall be performed for this JPM, including any required

communications. I will provide initiating cues and reports on other actions when

directed by you. Ensure you indicate to me when you understand your assigned

task. To indicate that you have completed your assigned task return the handout

sheet I provided you.

INITIAL CONDITIONS:

Plant start-up after refueling outage which required complete shutdown of the

Component Cooling Water System (CCS).

The CCS has been return to service and is operating normally except for the Thermal

Barrier Booster Pumps (TBBP) which are shutdown.

Both TBBPs have been aligned and are available for service.

You are the OAC operator.

INITIATING CUES:

The Unit Supervisor has directed you to place IA-A TBBP in service and align

both TBBP control switches in normal alignment per the procedure.

You are to notify the Unit Supervisor when the procedure has been completed.

JPMR168/Sim

Page 1 of 15

REGION II

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

B.l.f JPMR168/Sim

SHUTDOWN "A" TRAIN EGTS FOLLOWING 10

HOUR RUN PER SOI-65.02

APPLICANT

EXAMINER

JPMR168/Sim

Page 2 of 15

REGION I!

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

Task: SHUTDOWN "A" TRAIN EGTS FOLLOWING 10 HOUR RUN PER SOI-65.02

Alternate Path: N/A

Facility JPM #: New

KIA Rating(s): 027A4.01 (3.3-/3.3*) 027A4.01 (3.3*/3.2*) 2.1.23 (3.914.0)

2.1.30 (3.9/3.4)

Task Standard: EGTS "A" Train has been shutdown and returned to ES Standby alignment in

accordance with SOI-65.02.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator X In-Plant Perform X Simulate

References: SOI-65.02 "Emergency Gas Treatment System" Rev. 13

Task Number:: RO-065-SOI-65-005 APPLICABLE FOR: RO/SRO

1OCFR55.45: 3, 6, 8

Validation Time: 28 min. Time Critical: No

Applicant: Time Start:

NAME SSN Time Finish:

Performance Rating: SAT__ UNSAT Performance Time

Examiner: /

NAME SIGNATURE DATE

COMMENTS

JPMR168/Sim

Page 3 of 15

SIMULATOR OPERATOR INSTRUCTIONS:

1. Initialize to IC # 152 100% steady state power.

2. Acknowledge all alarms.

3. Freeze simulator until the performance indicates understanding of the task and time

is allowed for control board familiarization.

4. NOTE: This JPM has been preshot in IC #152. The following is the setup instructions

if needed:

Initialize to IC # 40.

Startup "A" Train EGTS per SOI-65.02 Section 8.3 as follows:

Open 1-FCV-65-10 with 1-HS-65-10.

Open 1-FCO-65-26 with 1-HS-65-26

Place 1-HS-65-81/86 to OPEN

Place 1-HS-65-83/87 in A AUTO STANDBY

Place 0-HS-65-23A to start and release.

Acknowledge all alarms

5. After performer indicates understanding of task, place simulator in run.

SIMULATOR OPERATOR INSTRUCTIONS:

NONE

JPMR168/Sim

Tools/Eauipment/Procedures Needed: Page 4 of 15

Ensure clean copy of SOI-65.02 in all copies of Operating Instructions on the Simulator

Floor.

READ TO OPERATOR

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control

room steps shall be performed for this JPM, including any required

communications. I will provide initiating cues and reports on other actions when

directed by you. Ensure you indicate to me when you understand your assigned

task. To indicate that you have completed your assigned task return the handout

sheet I provided you.

INITIAL CONDITIONS:

The Unit is at 100% RTP

0-SI-65-6-A "Emergency Gas Treatment System Train A 10-Hour Operation

performance in progress.

"A" Train EGTS Fan has been in service for 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br />.

You are a support operator in the control room.

INITIATING CUES:

The Unit Supervisor directs you shutdown the "A" Train EGTS Fan per SOI-65.02

and return EGTS to Standby Alignment per the procedure.

You are to notify Unit Supervisor when you have completed the task.

JPMR168/Sim

Page 5 of 15

START TIME:

STEP 1: Obtain a copy of the procedure.

STANDARD: A copy of SOI-65.02 section 7.1 has been obtained __SAT

EXAMINER'S CUE: After the performerhas demonstratedthe method of

obtaining the correctinstruction, the evaluatorcan

UNSAT

provide a copy of the instruction.

NOTE TO EVALUATOR: Performer may also identify Section 5.0 as

needed to return EGTS to standby. You may

provide a copy of this section when performer

seeks to obtain a copy.

COMMENTS:

CAUTION: If EGTS is in service due to an accident signal initiation, and the

charcoal filter banks have decay heat, an engineering evaluation

must be performed before shutting down the EGTS system.

NOTE If EGTS was Auto actuated, both Trains' shutdown sections must be

performed prior to return to standby readiness.

STEP 2: [Step 1] ENSURE a OA Cntmt Isolation signal is NOT

present.

STANDARD: Performer determines that OA Cntmt Isolation signal is NOT SAT

present by checking Master Isol Signal PNLs 1-XX-55-6C & 6D

OA light NOT LIT.

UNSAT

COMMENTS:

"**Italicized Cues Are To Be Used Only If JPM PerformanceIs Being Simulated.

JPMR168/Sim

Page 6 of 15

STEP 3: [Step 2] Momentarily PLACE 0-HS-65-23A, EGTS FAN & CRITICAL

DISCH DMPR, in STOP (returns to A-AUTO). STEP

STANDARD: Performer stops "A" Train EGTS Fan with 0-HS-65-23A and

checks red light off and green light ON the associated

handswitch. SAT

Step is critical to shutdown the running EGTS Fan.

UNSAT

COMMENTS:

I

STEP 4: [Step 3] ENSURE 1-FCV-65-8, EGTS TR-A U1 SUCT

DMPR, CLOSED.

STANDARD: Performer checks 1-HS-65-8 and verifies red light off and SAT

green light ON for the associated hand switch

UNSAT

COMMENTS:

STEP 5: [Step 4] PERFORM the following: CRITICAL

[a] CLOSE 1-FCO-65-10, EGTS TR-A Ul SUCT DMPR. STEP

[b] CLOSE 1-FCO-65-26, EGTS TO Ul SHIELD BLDG.

SAT

STANDARD: Performer closes 1-FCO-65-10 with 1-HS-65-10, performer

closes 1-FCO-65-26 with 1-HS-65-26. Respective hand

switches red lights are off and green lights are LIT. UNSAT

Step is critical to shutdown return ventilation lineup to

normal following 10 hour1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> run.

COMMENTS:

I __________________________

    • ItalicizedCues Are To Be Used Only If JPM PerformanceIs Being Simulated.

JPMR168/Sim

Page 7 of 15

STEP 6: [STEP 5] IF Train A EGTS to be returned to STANDBY,

CRITICAL

THEN: PERFORM the following: STEP

NOMENCLATURE

EGTS TR-A U1 SUCT DMPR

EGTS TR-A Ul SHIELD BLDG

STANDARD: Performer places 1-HS-65-10 and 1-HS-65-26 to the A AUTO SAT

position.

Step is critical to return these hand switches to ES

Standby alignment. UNSAT

COMMENTS:

i

STEP 7: [Step 6] IF Train B EGTS is to be shutdown, THEN GO TO

Section 7.2.

STANDARD: Performer determines that this step does not apply and SAT

proceeds to the next step.

COMMENTS:

UNSAT

-I

STEP 8: [Step 7] IF EGTS is to be returned to STANDBY, THEN GO

TO Section 5.0 to align EGTS for STANDBY.

STANDARD: Performer goes to Section 5.0. SAT

COMMENTS:

UNSAT

I

    • ltalicizedCues Are To Be Used Only if JPM PerformanceIs Being Simulated.

JPMR168/Sim

Page 8 of 15

NOTE TO EVALUATOR: The following performance steps are from

section 5.1 of SOI-65.02.

CAUTION IF EGTS is being returned to standby after auto actuation,

THEN both Sections 7.1 and 7.2 must be performed prior to

Standby Readiness alignment.

i

STEP 9: [Step 1] ENSURE a OA Cntmt Isolation signal is NOT

present.

STANDARD: Performer determines that OA Cntmt Isolation signal is NOT SAT

present by checking Master Isol Signal PNLs 1-XX-55-6C & 6D

OA light NOT LIT.

NOTE TO EVALUATOR: This was previously performed in step 2 of

_UNSAT

JPM.

COMMENTS:

I1 _____________

STEP 10: [STEP 2] PERFORM the following:

120VAC VITAL INST POWER BD 1-1

NOMENCLATURE LOCATION POSITION UNID

EGTS TRAIN A AUX RELAYS BKR 38 ON 1-BKR-235-1/38

1-PCV-65-81 /1-PCV-65-86

120VAC VITAL INST POWER BD 1-11

NOMENCLATURE LOCATION POSITION UNID

EGTS TRAIN B AUX RELAYS BKR 38 ON 1-BKR-235-2/38

1-PCV-65-81/1-PCV-65-87

STANDARD: An AUO is contacted to ensure 1-BKR-235-1/38 and 1-BKR SAT

235-2/38 are ON.

    • CUE: When contacted, respond as AUO, acknowledge request

using repeat back, then report that 1-BKR-235-1138 and 1 UNSAT

BKR-2/38 are ON.

COMMENTS:

-- I _____________________________

"**Italicized Cues Are To Be Used Only If JPM PerformanceIs Being Simulated.

JPMR168/Sim

Page 9 of 15

STEP 11: [STEP 3] PERFORM the following:

NOMENCLATURE LOCATION POSITION UNID

EGTS FAN A & DISCH DMPR O-M-27B A AUTO 0-HS-65-23A

EGTS FAN B & DISCH DMPR 0-M-27B A AUTO 0-HS-65-42A

STANDARD: Hand switches 0-HS-65-23A and 0-HS-65-42A have checked SAT

in the A AUTO position (pushed in).

COMMENTS:

UNSAT

STEP 12: [STEP 4] OPEN the following dampers, and PLACE the

handswitches in A AUTO:

NOMENCLATURE LOCATION POSITION UNID

Ul ANN VAC FANS SUCT 0-M-27B A AUTO 1-HS-65-52

Ul ANN VAC FANS SUCT 0-M-27B A AUTO 1-HS-65-53

STANDARD: Hand switches 0-HS-65-52 and 0-HS-65-53 have checked in SAT

the A AUTO position.

COMMENTS:

UNSAT

I _________________________________________________

"**ItalicizedCues Are To Be Used Only If JPM PerformanceIs Being Simulated.

JPMR168/Sim

Page 10 of 15

NOTE 1 The following step may be N/A'd if annulus fans are running.

NOTE 2 If a phase A signal has been present, the next step may start

one Ann Vac Fan due to low flow. Either fan may be selected

first. Flow should be allowed to stabilize before the second

fan is placed in auto to avoid two fans running. SOI-65.01

Section 5.0 should be referenced to ensure proper damper

alignment and control after fan start.

STEP 13: [STEP 5] PLACE the following handswitches in STOP to

break seal-in and , RETURN to A-P AUTO:

NOMENCLATURE LOCATION POSITION UNID

ANN VAC FAN 1A & SUCT FCO 0-M-27B A-P AUTO 1-HS-65-77A

ANN VAC FAN 1B & SUCT FCO 0-M-27B A-P AUTO 1-HS-65-74A

STANDARD: Performer determines ANN VAC FAN 1A is running by SAT

checking red light LIT on 1-HS-65-77A, that step is N/A and

proceeds to the next step.

COMMENTS: UNSAT

STEP 14: [STEP 6] IF an accident signal (0A) has occurred OR

Annulus AP has dropped below 4.0 in. H2 0, THEN:

[a] PERFORM the following:

NOMENCLATURE LOCATION POSITION UNID

Ul EGTS-ANN AP CNTLR B ISOL 0-M-27B A-AUTO 1-HS-65-83/87

Ul EGTS-ANN AP CNTLR A ISOL 0-M-27B A-AUTO 1-HS-65-81/86

STANDARD: Performer determines that step is NIA by checking Ul EGTS- SAT

ANN AP is greater than 4.0 " H2 0 on 1-PDI-30-126A.

Performer may also observe that Annunciator alarm window

232-B is DARK and proceeds to the next step.

UNSAT

    • CUE: If asked, respond as CRO, and state that Window 232-B

has remained DARK throughout the 10 hour1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> run of "A"

Train EGTS Fan.

COMMENTS:

"**ItalicizedCues Are To Be Used Only If JPM PerformanceIs Being Simulated.

JPMR168/Sim

Page 11 of 15

STEP 15: [STEP 6 b] WHEN Annulus AP is greater than 4.0 in. H 20,

THEN PERFORM the following (N/A if not required):

NOMENCLATURE LOCATION POSITION UNID

PCV-65-81 and PCV-65-86, A5W737, 1-JB- RESET 1-HS-65-80 and

EGTS CNTMTANNULUS DP 292-4013-A, N. 1-HS-65-90

RESET of GFFD Rm.

PCV-65-83 and PCV-65-87, A4V737, 1-JB- RESET 1-HS-65-82 and

EGTS CNTMTANNULUS DP 292-4015-B, S. 1-HS-65-97

RESET of GFFD Rm.

STANDARD: Performer determines that step is NIA by checking Ul EGTS SAT

ANN AP as greater than 4.0 " H20 on 1-PDI-30-126A.

Performer may also observe that Annunciator alarm window

232-B is DARK and proceeds to the next step.

UNSAT

COMMENTS:

STEP 16: [STEP 7] ENSURE the following dampers are CLOSED and,

PLACE either 1-HS-65-83/87 or 1-HS-65-81/86 in A AUTO,

and the other handswitch in A AUTO STANDBY:

NOMENCLATURE LOCATION AS-LEFT UNID

POSITION

Ul EGTS-ANN AP CNTLR B 0-M-27B 1-HS-65-83/87

ISOL

Ul EGTS-ANN AP CNTLR A 0-M-27B 1-HS-65-81/86

ISOL

STANDARD: Performer checks positions of 1-HS-65-83/87 and 1-HS-81/86 SAT

and ensures one switch is in A AUTO and the other switch is in

A-AUTO STANDBY.

COMMENTS: UNSAT

"**ItalicizedCues Are To Be Used Only If JPM PerformanceIs Being Simulated.

JPMR168/Sim

Page 12 of 15

CAUTION PDIC-65-80 & 82 Setpoint Thumbwheells are adjusted by MIG

STEP 17: [STEP 8] ENSURE the following controllers in AUTO:

NOMENCLATURE LOCATION POSITION UNID

EGTS-ANN AP CONTROL 0-M-27B AUTO 1-PDIC-65-82

EGTS-ANN AP CONTROL 0-M-27B AUTO 1-PDIC-65-80

STANDARD: Performer checks both handswitches (1-PDIC-65-82 & -80) are SAT

in AUTO.

COMMENTS:

UNSAT

i

STEP 18: [STEP 9] ENSURE the following:

NOMENCLATURE LOCATION POSITION UNID

EGTS TR A DECAY COOLING 0-M-27B CLOSE 0-HS-65-28B

EGTS TR A DECAY COOLING O-M-27B CLOSE 0-HS-65-28A

EGTS TR B DECAY COOLING O-M-27B CLOSE 0-HS-65-47A

EGTS TR B DECAY COOLING O-M-27B CLOSE 0-HS-65-47B

STANDARD: Performer check and verifies 0-HS-65-28B, -28A, -47A, -47B SAT

are in the close position.

COMMENTS:

UNSAT

I_____________________________

"**ltalicized Cues Are To Be Used Only If JPM PerformanceIs Being Simulated.

JPMR168/Sim

Page 13 of 15

STEP 19: [STEP 10] PERFORM the following

NOMENCLATURE LOCATION POSITION UNID

EGTS TR-A Ul SUCT DMPR 0-M-27B A AUTO 1-HS-65-10

EGTS TR-A Ul SUCT DMPR 0-M-27B CLOSE 1-HS-65-8

EGTS FAN B U1 SUCT DMPR 0-M-27B CLOSE 1-HS-65-51

EGTS TR-B Ul SUCT DMPR 0-M-27B A AUTO 1-HS-65-30

EGTS TO Ul SHIELD BLDG 0-M-27B A AUTO 1-HS-65-26

EGTS TO Ul SHIELD BLDG 0-M-27B A AUTO 1-HS-65-27

STANDARD: Performer checks 1-HS-65-10 & -26 to the A AUTO position.

SAT

Performer checks 1-HS-65-8 & -51 in the CLOSE position.

Performer checks 1-HS-65-30, -26, -27 in the A AUTO position.

UNSAT

COMMENTS:

NOTE TO EVALUATOR I

The following step is from Section 7.1

I

STEP 20: [Step 8] IF Annulus Vacuum System was shutdown, THEN

PLACE Annulus Vacuum in service per SOI-65.01.

SAT

STANDARD: Performer determines that this step is not applicable as

annulus vacuum is already in service.

UNSAT

COMMENTS:

I ______________________________

    • ItalicizedCues Are To Be Used Only lf JPM PerformanceIs Being Simulated.

JPMR168/Sim

Page 14 of 15

STEP 21: Notify the Unit Supervisor that "A"Train EGTS Fan has been

shutdown and EGTS has been returned to STANDBY.

SAT

STANDARD: Unit Supervisor has been notified that "A" Train EGTS Fan

has been shutdown and EGTS has been returned to

STANDBY. UNSAT

    • CUE: When notified, acknowledge the report using "repeat

back"

COMMENTS:

END OF TASK

I______________

TIME STOP:

"**ltalicized Cues Are To Be Used Only If JPM PerformanceIs Being Simulated.

Page 15 of 15

APPLICANT CUE SHEET

(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control

room steps shall be performed for this JPM, including any required

communications. I will provide initiating cues and reports on other actions when

directed by you. Ensure you indicate to me when you understand your assigned

task. To indicate that you have completed your assigned task return the handout

sheet I provided you.

INITIAL CONDITIONS:

The Unit is at 100% RTP

0-SI-65-6-A "Emergency Gas Treatment System Train A 10-Hour Operation

performance in progress.

"A" Train EGTS Fan has been in service for 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br />.

You are a support operator in the control room.

INITIATING CUES:

The Unit Supervisor directs you shutdown the "A" Train EGTS Fan per SOI-65.02

and return EGTS to Standby Alignment per the procedure.

You are to notify Unit Supervisor when you have completed the task.

JPMR108A/Sim

Page 1 of 11

REGION II

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

B.l.g JPMR108A/Sim

RETURN PRM N-42 TO SERVICE PER AOI-4

APPLICANT

EXAMINER

JPMR1 08A/Sim

Page 2 of 11

REGION !1

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

Task: RETURN PRM N-42 TO SERVICE PER AOI-4

Alternate Path: When rod control is returned to auto a continuous rod insertion occurs

requiring performer to return rod control to manual and then trip the reactor.

Facility JPM #: 3-OT-JPMR108 Rev 1

K/A Rating(s): 015A4.02 [3.9/3.91 2.1.23 [3.9/4.0] 001AA1.05 [4.3/4.21

Task Standard: The DETECTOR CURRENT COMPARATOR switch for UPPER SECTION, the

DETECTOR CURRENT COMPARATOR switch for LOWER SECTION, the ROD

STOP BYPASS, the POWER MISMATCH BYPASS, and the COMPARATOR

CHANNEL DEFEAT have been placed in NORMAL or OPERATE as directed AOI-2,

Attachment 1 and then reactor is manually tripped due to continuous rod insertion.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator X In-Plant Perform X Simulate

References: AOI-4, NUCLEAR INSTRUMENTATION MALFUNCTIONS, Rev 20

Task Number:: RO-092-AOI-4-002 APPLICABLE FOR: RO/SRO

RO-085-AO 1-2-0 05

IOCFR55.45: 2,3, 4, 5,6,12

Validation Time: 9 min. Time Critical: No

Applicant: Time Start:

NAME SSN Time Finish:

Performance Rating: SAT UNSAT Performance Time

Examiner: /

NAME SIGNATURE DATE

COMMENTS

JPMR 108A/Sim

Page 3 of 11

SIMULATOR OPERATOR INSTRUCTIONS:

1. Initialize to IC # 157.

2. Acknowledge all alarms.

3. IFreeze simulator until the performance indicates understanding

of the task and time

is allowed for control board familiarization.

4. NOTE: This JPM has been preshot in IC #157. The

following is the setup

instructions if needed:

Initialize to IC #40, 50, or 60

imf rd02 (el) 20 "Uncontrolled Rod insertion Bank D

Group 2".

Place PRM N42 OOS:

  • Place S/G LEVEL-NIS BIAS controllers for S/Gs

2 and 3 in MANUAL

and adjust to demand output of unaffected S/Gs.

"* Place DETECTOR CURRENT COMPARATOR

switch for UPPER

SECTION to N42

"* Place DETECTOR CURRENT COMPARATOR switch

for LOWER

SECTION to N42

"* Place ROD STOP BYPASS switch to N42

"* Place POWER MISMATCH BYPASS switch to N42

"* Place COMPARATOR CHANNEL DEFEAT switch

to N42

Acknowledge all alarms.

FREEZE the simulator till the performer indicates an

understanding of the task.

5. After performer indicates understanding of task, place

simulator in run.

SIMULATOR OPERATOR INSTRUCTIONS:

ENSURE rd 02 with 20 steps per minutes is assigned

to manual trigger 1.

When rod control has been returned to automatic (JPM

STEP 11 Completion), then

insert continuous rod insertion by activating manual

trigger 1:

imf itrigger

JPMR108ANSim

Page 4 of 11

Tools/Equipment/Procedures Needed:

Ensure clean copy of AOI-4 and AO1-2 in all copies of Abnormal Operating Instructions

on the Simulator Floor.

READ TO OPERATOR

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control

room steps shall be performed for this JPM, including any required

communications. I will provide initiating cues and reports on other actions when

directed by you. Ensure you indicate to me when you understand your assigned

task. To indicate that you have completed your assigned task return the handout

sheet I provided you.

INITIAL CONDITIONS:

Unit at 100% RTP

PRM N42 failed during last shift

AOI-4 Section 3.4 has been completed through Step 15.

Work Control has notified the MCR that repairs to PRM N42 are complete and the

instrument is ready to be returned to service.

You are the Operator at the Controls.

INITIATING CUES:

The Unit Supervisor has directed you to return PRM N42 to service.

You are to notify the US when the procedure has been completed.

JPMR108A/Sim

Page 5 of 11

START TIME:

STEP 1: Obtain the correct procedure.

SAT

STANDARD: A copy of AOI-4 has been obtained.

EXAMINER'S CUE: After the performer has demonstratedthe method of

obtaining the correct instruction,the evaluatorcan UNSAT

provide a copy of the instruction.

COMMENTS:

I

STEP 2: [Step 16] WHEN PRM is to be restored THEN:

a. PLACE controls rods in manual.

SAT

STANDARD: The rod control hand switch has been placed in Manual

position.

UNSAT

COMMENTS:

I

STEP 3: [Step 16b] REFER TO Attachment 1, PRM Function At NIS

Rack, step 2.

SAT

STANDARD: Performer refers to Attachment 1, PRM Function At NIS Rack,

Step 2 for restoration of PRM N42.

UNSAT

COMMENTS:

"**Italicized Cues Are To Be Used Only lf JPM PerformanceIs Being Simulated.

JPMRI 08A/Sim

Page 6 of 11

NOTE TO EVALUATOR: The following steps are from Attachment I page 2 6 of 11

JPMR108A/Sim

Page

of 2 AOI-4

STEP 4: [STEP 2] WHEN PRM is ready for return to service, THEN CRITICAL

PERFORM the following steps: STEP

a. PLACE DETECTOR CURRENT COMPARATOR switch for

UPPER SECTION in NORMAL

SAT

STANDARD: Detector Current Comparator Upper Section switch placed to

"NORMAL" (Miscellaneous Control & Indication Panel,I-IDWR

92-N50-G IV)

UNSAT

Step is critical for proper restoration of upper power

detector to current comparator.

COMMENTS:

CRTIA

STEP 5: [STEP 2 b] PLACE DETECTOR CURRENT COMPARATOR CRITICAL

switch for LOWER SECTION in NORMAL STEP

STANDARD: Detector Current Comparator Lower Section switch placed to

"NORMAL" (Miscellaneous Control & Indication Panel, 1-IDWR SAT

92-N50-G IV).

Step is critical for proper restoration of lower power

detector to current comparator. UNSAT

COMMENTS:

"**ItalicizedCues Are To Be Used Only If JPM PerformanceIs Being Simulated.

JPMR108A/Sim

Page 7 of 11

NOTE: On the following step, annunciator window 66-C, 67-C, 68-C, OR

69-C, N-(#) OVERPOWER ROD STOP BYPASSED, will clear

depending on which channel is bypassed.

STEP 6: [STEP 2 c] PLACE ROD STOP BYPASS switch in OPERATE.

CRITICAL

STEP

STANDARD: Rod Stop Bypass switch is positioned from "N42 to placed to

"OPERATE" (Miscellaneous Control & Indication Panel,1

SAT

IDWR-92-N50-G IV)

Step is critical for proper restoration of to enable rod stop

interlock protection from this channel. _UNSAT

COMMENTS:

STEP 7: [STEP 2 d] PLACE POWER MISMATCH BYPASS switch in CRITICAL

OPERATE.

STEP

_SAT

STANDARD: Power Mismatch Bypass switch is positioned from "N42" to

"OPERATE" (Miscellaneous Control & Indication Panel, 1

IDWR-92-N50-G IV)

UNSAT

Step is critical to restore channel input to high

auctioneering circuit and power mismatch circuits.

COMMENTS:

I __________________________

"**ItalicizedCues Are To Be Used Only If JPM PerformanceIs Being Simulated.

JPMR108A/Sim

Page 8 of 11

NOTE: On the following step, annunciator window 82-E, NIS CHANNEL IN

TEST, will clear.

I ______

STEP 8: [STEP 2 e] PLACE COMPARATOR CHANNEL DEFEAT switch in CRITICAL

NORMAL.

STEP

STANDARD: Comparator Channel Defeat Switch is positioned to "NORMAL" SAT

(Comparator & Rate Panel ,Comparator N37, 1-IDWR-92-N37

IV).

Step is critical to restore channel input to channel UNSAT

comparator alarm circuits.

COMMENTS:

NOTE: On the following step, annunciator window 115-E, POWER RANGE

FLUX RATE HI, will clear if the positive rate trip light is LIT.

STEP 9: [STEP 2 RNO fl IF POSITIVE RATE TRIP is LIT, THEN RESET

RATE MODE switch.

STANDARD: Positive Rate Trip light on Power Range Upper N42A, 1-IDWR-92- SAT

42A II, is checked and determine light is NOT LIT and continues to

next step.

COMMENTS:

UNSAT

NOTE TO EVALUATOR: Performer returns to AOI-4 at step 16 c.

STEP 10: [STEP 16 c] ENSURE T-avg and T-ref within 10.

SAT

STANDARD: Performer verifies T-avg and T-ref within 10 by recorder 1-TR

68-2B on 1-M-5 or other T-avg - T-ref indications.

COMMENTS: C__ UNSAT

"**ltalicized Cues Are To Be Used Only If JPM PerformanceIs Being Simulated.

JPMR108A/Sim

Page 9 of 11

STEP 11: [STEP 16 d] IF auto rod control desired, PLACE control rods

in AUTO.

SAT

STANDARD: The rod control hand switch has been placed in AUTO

position. UNSAT

    • CUE: If asked, respond as US that auto rod control is desired.

NOTE TO EVALUATOR: The continuous rod insertion malfunction

will be

inserted just after rod control has been placed to

auto. The operator may immediately return rod

control to manual, check for rod motion stopped,

then trip the reactor before referring to AOI-2.

COMMENTS:

NOTE TO EVALUATOR: The Following Steps are from AOI-2 Section 3.2

due to continuous rod insertion.

i

STEP 12: [STEP 1] PLACE control rods in MAN.

SAT

STANDARD: The rod control hand switch has been placed in Manual

position.

UNSAT

    • NOTE: Rods will continue to step IN.

COMMENTS:

I._________________________

"**ItalicizedCues Are To Be Used Only If JPM PerformanceIs Being Simulated.

JPMR108A/Sim

Page 10 of 11

STEP 13: [STEP 2] CHECK control rod movement STOPPED.

SAT

STANDARD: The rod control indications have been checked for movement

and performer determines that rods are still inserting and goes

to RNO for step.

UNSAT

"**NOTE. Rods will continue to step IN.

COMMENTS:

.1-

STEP 14: [STEP 2 RNO] TRIP reactor. GO TO E-0, Reactor Trip or CRITICAL

Safety Injection. STEP

SAT

STANDARD: Reactor Trip hand switch on 1-M-4 or 1-M-6 has been placed

to the TRIP position. Performer than goes to E-0.

Step is critical to task performance as uncontrolled rod UNSAT

movement in manual rod control requires reactor trip

    • CUE: When performer transitions to E-O, inform him/her that the

JPM is complete "WE'LL STOP HERE".

COMMENTS:

END OF TASKI

TIME STOP:

"**Italicized Cues Are To Be Used Only If JPM PerformanceIs Being Simulated.

Page 11 of 11

APPLICANT CUE SHEET

(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control

room steps shall be performed for this JPM, including any required

communications. I will provide initiating cues and reports on other actions when

directed by you. Ensure you indicate to me when you understand your assigned

task. To indicate that you have completed your assigned task return the handout

sheet I provided you.

INITIAL CONDITIONS:

Unit at 100% RTP

PRM N42 failed during last shift

AOI-4 Section 3.4 has been completed through Step 15.

Work Control has notified the MCR that repairs to PRM N42 are complete and the

instrument is ready to be returned to service.

You are the Operator at the Controls.

INITIATING CUES:

The Unit Supervisor has directed you to return PRM N42 to service.

You are to notify the US when the procedure has been completed.

JPMR095A/Sim

Page 1 of 13

REGION Ii

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

B.l.a JPMR095A/Sim

RETRIEVE A DROPPED ROD PER AOI-2

APPLICANT

EXAMINER

JPMR095A/Sim

Page 2 of 13

REGION II

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

Task: RETRIEVE A DROPPED ROD PER AOI-2

Alternate Path: Second rod drops while withdrawing dropped rod requiring a manual trip of

the reactor.

Facility JPM #: 3-OT-JPMR095A Rev 0

K/A Rating(s): 001A4.03 (4.0/3.7) 001A4.06 (2.9/3.2) 2.1.30 (3.9/3.4)

2.1.23 (3.9/4.0) 2.4.4 (4.0/4.3) 003AA1.02 (3.6/3.4)

003AA1.03 (3.6/3.3) 003AK3.04 (3.8/4.1 003AK3.09 (3.0/3.5)

Task Standard: Performer prepares for the withdrawal of the dropped rod per AOI-2, Section 3.3,

Steps 16-27.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator X In-Plant _ Perform X Simulate

References: AOI-2 "Malfunction Of The Reactor Control System" Rev.23

Task Number:: RO-085-AOI-2-004 APPLICABLE FOR: RO/SRO

IOCFR55.45: 2, 3, 4, 5, 6, 12

Validation Time: 23 min. Time Critical: No

Applicant: Time Start:

NAME SSN Time Finish:

Performance Rating: SAT UNSAT Performance Time

Examiner: /

NAME SIGNATURE DATE

COMMENTS

JPMR095A/Sim

Page 3 of 13

SIMULATOR OPERATOR INSTRUCTIONS:

1. Initialize to IC # 144.

2. Ensure Bank Step Counters at correct settings.

3. Acknowledge all alarms.

4. Freeze simulator until the performance indicates understanding of the task and time

is allowed for control board familiarization.

5. NOTE: This JPM has been preshot in IC #144. The following is the setup instructions

if needed:

Reset to IC #51

imf rd07b. Causes C-5 rod to drop.

Dilute 700 gallons

Ensure Shutdown Bank and Control Banks that are fully withdrawn have step counters

at correct setting (Simulator at 228, check K0015 which contains the current monthly

full out rod position on ICS computer).

Assign drop rod F6 (Control Bank C) to manual trigger el: imf rd07a (el)

6. Ensure CR in Manual

7. Ensure Power Range NIs at 75% or less.

8. After performer indicates understanding of task, place simulator in run.

SIMULATOR OPERATOR INSTRUCTIONS:

Ensure that malfunction to drop control rod F6 has been assigned to manual trigger el.

During performance of JPM step 12 [Step 27] "Align RCCA to affected bank position" when

control rod C-5 reaches 10 steps withdrawn, activate manual trigger 1 by:

imf itrigger or use ETM page.

JPMR095AISim

Page 4 of 13

ToolslEquipmentlProcedures Needed:

Ensure clean copy of AOI-2 in all copies of Operating Instructions on the Simulator

Floor.

READ TO OPERATOR

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control

room steps shall be performed for this JPM, including any required

communications. I will provide initiating cues and reports on other actions when

directed by you. Ensure you indicate to me when you understand your assigned

task. To indicate that you have completed your assigned task return the handout

sheet I provided you.

INITIAL CONDITIONS:

The plant was operating at 100% power when shutdown rod C-5 dropped into the core

due to a power cabinet card problem about 15 minutes ago.

AOI-2,Sect 3.3, was entered and performed through Step 16.

The problem has been repaired.

The reactor power was reduced to ___ 75% per the instruction.

Unit SRO, Shift Manager, Reactor Engineering and STA have agreed on a retrieval rate

of 64 steps per minute, and maximum power level of 100%.

You are the OAC.

INITIATING CUES:

The Unit Supervisor directs you to realign the C-5 rod starting at AOI-2, Section

3.3, Step 17.

You are to notify the Unit Supervisor when the rod is realigned with the bank.

JPMR095A/Sim

Page 5 of 13

START TIME:

STEP 1: Obtain the correct procedure.

SAT

STANDARD: A copy of AOI-2 Section 3.3 has been obtained.

EXAMINER'S CUE: After the performerhas demonstratedthe method of

obtainingthe correctinstruction, the evaluatorcan UNSAT

provide a copy of the instruction.

COMMENTS:

i

STEP 2: [Step 17] PLACE rod control in bank select position for CRITICAL

affected bank. STEP

1-RBSS is placed in the SBD position. Step is critical to SAT

STANDARD:

ensure proper bank is selected to align affected rod.

UNSAT

COMMENTS:

"**ItalicizedCues Are To Be Used Only If JPM PerformanceIs Being Simulated.

JPMR095A/Sim

Page 6 of 13

NOTE: Computer Points for individual rods are C0009A through

C0035A for shutdown banks and C0039A through C0076A for

control banks. Average rod position points are U0001 through

U001 3. Rod step position points are U0049 through U0056. All

points are in ICS "GROUP DISPLAY MENU" listed in "SPECIAL

GROUPS" as "SG 1".

STEP 3: [STEP 18] RECORD the value of the following:

"* Affected bank's step counter(s).

"* Computer step indication for rods in the affected bank. SAT

"* P/A converter for bank (N/A for Shutdown Bank) [Aux Inst

Room, el 708, 1-PNL-85-R42].

" Bank Overlap Counter (N/A for Shutdown Bank) [control rod

UNSAT

drive room, el 782, panel 1-L-122].

STANDARD: Performer determines & logs the following:

- Step counter readings for SD bank D

- Computer step indication for SD bank D.

COMMENTS:

i

NOTE: Toggle switch up is disconnected. Toggle switch down is

connected.

STEP 4: [STEP 19] DISCONNECT all lift coils in affected bank, EXCEPT CRITICAL

for dropped RCCA. STEP

STANDARD: Toggle switches in cabinet 1-XS-85-1 for rods E-13, N-1 1, & L

SAT

3 are placed in the disconnect position (up position). Step is

critical to assure proper rod is selected to be aligned and

the remaining rods are not inadvertently positioned in the

following steps.

UNSAT

COMMENTS:

"**ltalicizedCues Are To Be Used Only If JPM Performance Is Being Simulated.

JPMR095A/Sim

Page 7 of 13

NOTE: The next step will cause a CONTROL ROD URGENT FAILURE

alarm (except for Shutdown Banks C and D). Additional alarms

associated with rod position may occur due to possible errors

in the P/A converter and the computer (such as Lo-Lo Rod

insertion alarm when zeroing the P-A converter). After the rods

are aligned and the rod position is updated, then these alarms

will reset.

STEP 5: [STEP 20] INSERT affected RCCA greater than 10 steps, and

CONTINUE until NO RCCA motion is observed on RPI

STANDARD: 1-FLRM, Rod Motion Control IN-OUT stick, is used to insert rod

> 10 steps on step counter SAT

COMMENTS: UNSAT

STEP 6: [STEP 21] SET affected step counter to "000".

STANDARD: Shutdown Bank D Step counter is set at "0"

SAT

COMMENTS:

UNSAT

"**Italicized Cues Are To Be Used Only If JPM PerformanceIs Being Simulated.

JPMR095A/Sim

Page 8 of 13

I

STEP 7: [STEP 22] USE Plant computer to set affected bank's

position to zero.

a. SELECT NSS and BOP

b. SELECT ROD BANK UPDATE SAT

c. ENTER 0 in affected bank position, THEN PRESS F3 to

save.

STANDARD: Performer uses the plant computer Rod Bank update function UNSAT

to set Shutdown Bank D Step Counter to "0".

COMMENTS:

1-

STEP 8: [STEP 23] IF dropped RCCA is in Control Bank, THEN

ADJUST the P/A converter, USING Attachment 1 [Aux Inst

Room, el 708, 1-PNL-85-R42].

SAT

STANDARD: Performer determines the rod is in shutdown bank and

proceeds to next step.

UNSAT

COMMENTS:

"**ItalicizedCues Are To Be Used Only If JPM PerformanceIs Being Simulated.

JPMR095ASim

Page 9 of 13

NOTE: Computer constant K0015 contains the current monthly full out

rod position for all rod banks.

STEP 9: [STEP 24] DETERMINE affected RCCA bank's required

position.

STANDARD: Performer reviews data from Step 18 or from computer point SAT

KOO15 or from NOB or calls Rx Engineering to determine full

out position.

    • CUE: IF NOB is referenced or Reactor Engineering contacted, UNSAT

state full out position is 228 steps.

COMMENTS:

STEP 10: [STEP 25] OBTAIN approval from the Plant Manager or

designee prior to raising reactor power.

STANDARD: Performer calls Plant Manager or his designee for approval SAT

prior to increasing Reactor Power.

    • CUE: When Plant Manager or his designate is contacted, grant

approval to increase power. UNSAT

COMMENTS:

    • ItalicizedCues Are To Be Used Only If JPM PerformanceIs Being Simulated.

JPMR095A/Sim

Page 10 of 13

CAUTION Power level for performing recovery and maximum allowable

power level during recovery will depend on initial power,

location of dropped RCCA and duration of event.

STEP 11: [STEP 26] DO NOT CONTINUE UNTIL the following agree on

a retrieval rate, power level at which recovery will be SAT

performed and maximum power level:

"* Unit SRO.

"* Shift Manager.

"* Rx Engineering. UNSAT

"* STA.

STANDARD: Performer determines that the above personnel have agreed

to retrieval rate and maximum power level per initial

conditions.

    • CUE: If any one of the above is contacted, state that the Unit

SRO, Shift Manager, Rx Engineering and STA are in

agreement to retrieve the rod at normal manual speed of

64 steps/minute. Maximum power level is 100%.

Recover from present power level.

COMMENTS:

"**ItalicizedCues Are To Be Used Only If JPM PerformanceIs Being Simulated.

JPMR095A/Sim

Page 11 of 13

NOTE Step 27 RNO does not apply if alignment stopped due to

turbine load reaching maximum established in Step 26.

Step 28 will reduce turbine load and allow alignment to

continue.

STEP 12: [STEP 27] ALIGN RCCA to affected bank position:.

"* USE rod control to position affected RCCA to bank position SAT

determined in Step 24.

"* RAISE turbine load to maintain T-avg and T-ref within 30 F.

UNSAT

STANDARD: Performer attempts to realign the rod by placing 1-FLRM to

the OUT position AND determines that the rod is withdrawing.

Performer stops withdrawing rod after recognizing another rod

has dropped into core.

    • CUE: If requested then CRO will control turbine load to

maintain T-avg and T-ref within 30 F.

NOTE TO EVALUATOR When rod has been withdrawn 10 steps the

console operator will drop control rod F6 in

control bank C. The operator may immediately

stop withdrawing rod, announce that a second rod

has dropped, and then trip the reactor before

referring to AOI-2 Section 3.3.

COMMENTS:

"**Italicized Cues Are To Be Used Only If JPM PerformanceIs Being Simulated.

JPMR095A/Sim

Page 12 of 13

NOTE TO EVALUATOR: Following steps are from the beginning of Section

3.3 in AOI-2 due to another dropped rod.

STEP 13: [STEP 1] PLACE control rods in MAN.

SAT

STANDARD: Control Rods are in MAN position. No action required.

NOTE TO EVALUATOR: Rod control is in SBD position.

UNSAT

COMMENTS:

STEP 14: [STEP 2] IF two or more RCCAs have dropped THEN: CRITICAL

a. TRIP reactor. STEP

b. **GO TO E-0, Reactor Trip or Safety Injection.

STANDARD: Reactor Trip hand switch on 1-M-4 or 1-M-6 has been placed

to the TRIP position. Performer than goes to E-0. SAT

Step is critical to task performance as two dropped

control rods requires reactor trip.

UNSAT

    • CUE: When performer transitions to E-O, inform himlher that

the JPM is complete "WE'LL STOP HERE".

COMMENTS:

END OF TASK I

TIME STOP:

"**Italicized Cues Are To Be Used Only If JPM PerformanceIs Being Simulated.

Page 13 of 13

APPLICANT CUE SHEET

(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control

room steps shall be performed for this JPM, including any required

communications. I will provide initiating cues and reports on other actions when

directed by you. Ensure you indicate to me when you understand your assigned

task. To indicate that you have completed your assigned task return the handout

sheet I provided you.

INITIAL CONDITIONS:

The plant was operating at 100% power when shutdown rod C-5 dropped into the core

due to a power cabinet card problem about 15 minutes ago.

AOI-2,Sect 3.3, was entered and performed through Step 16.

The problem has been repaired.

The reactor power was reduced to < 75% per the instruction.

Unit SRO, Shift Manager, Reactor Engineering and STA have agreed on a retrieval rate

of 64 steps per minute, and maximum power level of 100%.

You are the OAC.

INITIATING CUES:

The Unit Supervisor directs you to realign the C-5 rod starting at AOI-2, Section

3.3, Step 17.

You are to notify the Unit Supervisor when the rod is realigned with the bank.

J PMA047/Local

Page 1 of 11

REGION II

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

B.2.a JPMA047/Local

LOCAL CONTROL OF SG LEVELS (AFWT A-S) PER

SOI-3.02

APPLICANT

EXAMINER

JPMA047/Local

Page 2 of 11

REGION II

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

Task: LOCAL CONTROL OF SG LEVELS (AFWT A-S) PER SOI-3.02.

Alternate Path: N/A

Facility JPM #: 3-OT-JPMA047 Rev 4

K/A Rating(s): 061A3.03 [4.2/4.2] 055EA2.01 [3.4/3.7] 055EK3.02 [403/4.6]

2.1.20 [4.3/4.2] 2.2.25 [2.5/3.7] 2.1.30 [3.913.4]

Task Standard: 1-FCV-3-173 and 1-FCV-3-172 are located and positioned per SOI-3.02.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator In-Plant X Perform Simulate X

References: SOI-3.02 "Auxiliary Feedwater System" Rev. 29

Task Number:: AUO-003-SOI-3.02-014 APPLICABLE FOR: AUO/RO/SRO

IOCFR55.45: 7, 8, 9

Validation Time: 10 min. Time Critical: No

Applicant: Time Start:

NAME SSN Time Finish:

Performance Rating: SAT UNSAT Performance Time

Examiner: /

NAME SIGNATURE DATE

COMMENTS

JPMA047/Local

Page 3 of 11

Tools/EquipmentlProcedures Needed:

Hard Hat, Safety Glasses, Flashlight, Hearing Protection, and Plant Approved Shoes.

Latest revision of SOI-3.02.

ALARA considerations.

NOTE: START THIS JPM AT THE RAD WASTE DESK.

Provide copy of SOI-3.02 Section 8.5 with Applicant's Cue Sheet.

READ TO OPERATOR

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control

room steps shall be performed for this JPM, including any required

communications. I will provide initiating cues and reports on other actions when

directed by you. Ensure you indicate to me when you understand your assigned

task. To indicate that you have completed your assigned task return the handout

sheet I provided you.

INITIAL CONDITIONS:

The unit has tripped from 100% power.

A loss of all AC power has occurred.

The Turbine Driven Aux. Feed Pump is running and on recirc.

All Control Air pressure (essential and non-essential) is decreasing and the TD AFW

pump LCVs have closed.

You are the Aux. Bldg. AUO

INITIATING CUES:

You have been dispatched by the CRO to take local control of valves I-LCV-3-173

and 1-LCV-3-172 per SOI-3.02 Section 8.5 (#2 and #3 SIG LCVs from the TD AFW

pump) with directions to manually open each valve approximately 50%.

You are to inform the operator after both valves are positioned.

JPMA047/Local

Page 4 of 11

START TIME:

STEP 1: Obtain a copy of the instruction.

SAT

STANDARD: A copy of S01-3.02 Section 8.5.3 has been obtained.

EXAMINER'S CUE: Provide performer copy of Section 8.5.3 from SOI

3.02. UNSAT

COMMENTS:

-I

NOTE TO EVALUATOR The following is not a procedure step but is

included as a procedure note preceding the

procedure section in effect. Simulate obtaining

radio.

NOTE Direct radio communication with UO required to perform this

section.

I

STEP 2: Establish communication with the UO.

STANDARD: Radio Communication with the MCR has been established. SAT

    • CUE: Role play as the MCR I UO, acknowledge report using

repeat back. UNSAT

COMMENTS:

I _____________________________

    • ItalicizedCues Are To Be Used Only If JPM PerformanceIs Being Simulated.

JPMA047/Local

Page 5 of 11

Note: The following step was given in the initial conditions and may be

omitted by the performer.

STEP 3: [Step 1] ENSURE TD AFW PUMP A-S running.

STANDARD: Performer determines TD AFW Pump A-S is running. This SAT

information was supplied in the initial conditions.

    • CUE: If a TDAFWP parameter is checked, state the condition to UNSAT

indicate that the Turbine Driven pump is running.

(Given in initial conditions)

COMMENTS:

Note: The performer may elect to position one valve at a time or may

perform steps on both valves simultaneously.

STEP 4: [Step 2] IF MANUAL control of SG 1 level is necessary,

THEN PERFORM the following to fail CLOSED 1-LCV-3-174, TD

AFW PUMP SG 1 LEVEL CONTROL {S. Vlv Rm]:

[a] CLOSE 1-ISV-32-3736, ESSENT CONTROL AIR ISOL VALVE SAT

TO 1-LCV-3-174.

[b] DEPRESSURIZE air from regulator on 1-LCV-3-174.

STANDARD: Performer determines that this step does not apply. UNSAT

COMMENTS:

    • ltalicized Cues Are To Be Used Only If JPM PerformanceIs Being Simulated.

JPMA047/Local

Page 6 of 11

STEP 5: [Step 3] MODULATE flow with handwheel on top of 1-LCV

3-174 (CLOCKWISE to OPEN) per UO instruction.

STANDARD: Performer determines that this step does not apply. SAT

UNSAT

COMMENTS:

STEP 6: [Step 4] IF MANUAL control of SG 2 level is necessary, CRITICAL

THEN PERFORM the following to fail CLOSED 1-LCV-3-173, STEP

TD AFW PUMP SG 2 LEVEL CONTROL [A3U/737 Pen. Rm]:

[a] CLOSE 1-ISV-32-3735, ESSENT CONTROL AIR ISOL VALVE

TO 1-LCV-3-173. SAT

[b] DEPRESSURIZE air from regulator on 1-LCV-3-173.

STANDARD: The control air supply to 1-LCV-3-173 has been isolated by

UNSAT

closing 1-ISV-32-3735, and the petcock on the regulator

opened to release any air pressure remaining.

Step is critical to isolate air from the diaphragm to fail

valve closed and ensure it is vented.

    • CUE: After air supply valve handwheel is rotated in the

clockwise direction, state that the handwheel rotates

several turns and gets snug.

    • CUE: After air supply is isolated and the petcock on the

regulator is opened, state that the air is initially heard/felt

coming from the petcock then slows down and stops.)

COMMENTS:

I _________________________

"**Italicized Cues Are To Be Used Only If JPM PerformanceIs Being Simulated.

J PMA047/Local

Page 7 of 11

STEP 7: [Step 5] MODULATE flow with handwheel on top of 1-LCV CRITICAL

3-173 (CLOCKWISE to OPEN) per UO instruction. STEP

STANDARD: The hand wheel on 1-LCV-3-173 has been rotated in the SAT

CLOCKWISE direction to open the valve zý50% by local

indication.

Step is critical to manually position valve to supply UNSAT

feedwater to SG #2.

    • CUE: If the hand wheel is turned counterclockwise, state that

the hand wheel will NOT move.

    • CUE: If the hand wheel is turned clockwise, state that the hand

wheel rotates.

    • CUE: If the valve stem is checked, state it indicates

approximately 50% open.

COMMENTS:

"**Italicized Cues Are To Be Used Only 1f JPM PerformanceIs Being Simulated.

JPMA047/Local

Page 8 of 11

I

STEP 8: [Step 6] IF MANUAL control of SG 3 level is necessary, CRITICAL

THEN PERFORM the following to fail CLOSED 1-LCV-3-172, STEP

TD AFW PUMP SG 3 LEVEL CONTROL [A3U/737 Pen. Rm]:

[a] CLOSE 1-ISV-32-3770, ESSENT CONTROL AIR ISOL VALVE

TO 1-LCV-3-172. SAT

[b] DEPRESSURIZE air from regulator on 1-LCV-3-172.

STANDARD: The control air supply to 1-LCV-3-172 has been isolated by

closing 1-ISV-32-3770, and the petcock on the regulator UNSAT

opened to release any air pressure remaining.

Step is critical to isolate air from the diaphragm to fail

valve closed and ensure it is vented.

    • CUE: After air supply valve hand wheel is rotated in the

clockwise direction, state that the hand wheel rotates

several turns and gets snug.

    • CUE: After air supply is isolated and the petcock on the

regulator is opened, state that the air is initially heard/felt

coming from the petcock then slows down and stops.

COMMENTS:

    • ItalicizedCues Are To Be Used Only If JPM Performance Is Being Simulated.

JPMA047/Local

Page 9 of 11

STEP 9: [Step 7] MODULATE flow with handwheel on top of 1-LCV CRITICAL

3-172 (CLOCKWISE to OPEN) per UO instruction. STEP

STANDARD: The hand wheel on 1-LCV-3-172 has been rotated in the

CLOCKWISE direction to open the valve = 50% by local SAT

indication.

Step is critical to manually position valve to supply

feedwater to SG #3. UNSAT

    • CUE: If the hand wheel is turned counterclockwise, state that

the hand wheel will NOT move.

    • CUE: If the hand wheel is turned clockwise, state that the hand

wheel rotates.

    • CUE: If the valve stem is checked, state it indicates

approximately 50% open.

COMMENTS:

STEP 10: [Step 8] IF MANUAL control of SG 4 level is necessary,

THEN PERFORM the following to fail CLOSED 1-LCV-3-175,

TD AFW PUMP SG 3 LEVEL CONTROL [S. Viv Rm]:

[a] CLOSE 1-ISV-32-3769, ESSENT CONTROL AIR ISOL VALVE

TO 1-LCV-3-175.

[b] DEPRESSURIZE air from regulator on 1-LCV-3-175. SAT

STANDARD: The performer determines that this step does not apply.

COMMENTS: UNSAT

    • ItalicizedCues Are To Be Used Only If JPM PerformanceIs Being Simulated.

JPMA047/Local

Page 10 of 11

STEP 11: [Step 9] MODULATE flow with handwheel on top of 1-LCV

3-175 (CLOCKWISE to OPEN) per UO instruction.

STANDARD: The performer determines that this step does not apply.

SAT

COMMENTS:

UNSAT

4

STEP 12: Inform the CRO that 1-LCV-3-172 and 1-LCV-3-173 have

been manually positioned to 50% open.

STANDARD: The CRO is contacted and informed that 1-LCV-3-172 and 1 SAT

LCV-3-173 have been manually positioned to 50% open.

    • CUE: When the CRO is contacted, repeat back and then

terminate the JPM by telling the performer, "Rad Waste UNSAT

AUO will take over control of LCVs 3-172 and 173. We'll

stop here".

COMMENTS:

END OF TASK

I _____________________________________________________

TIME STOP:

"**ltalicizedCues Are To Be Used Only If JPM PerformanceIs Being Simulated.

Page 11 of 11

APPLICANT CUE SHEET

(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control

room steps shall be performed for this JPM, including any required

communications. I will provide initiating cues and reports on other actions when

directed by you. Ensure you indicate to me when you understand your assigned

task. To indicate that you have completed your assigned task return the handout

sheet I provided you.

INITIAL CONDITIONS:

The unit has tripped from 100% power.

A loss of all AC power has occurred.

The Turbine Driven Aux. Feed Pump is running and on recirc.

All Control Air pressure (essential and non-essential) is decreasing and the TD AFW

pump LCVs have closed.

You are the Aux. Bldg. AUO

INITIATING CUES:

You have been dispatched by the CRO to take local control of valves 1 -LCV-3-173

and 1-LCV-3-172 per SOI-3.02 Section 8.5 (#2 and #3 SIG LCVs from the TD AFW

pump) with directions to manually open each valve approximately 50%.

You are to inform the operator after both valves are positioned.

JPMA44AILocal

Page 1 of 13

REGION I!

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

B.2.b JPMA044A/Local

ALIGNMENT UPPER CONTAINMENT MONITOR TO

THE LOWER CONTAINMENT LOCALLY

APPLICANT

EXAMINER

JPMA44A/Local

Page 2 of 13

REGION Ii

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

Task: Alignment Upper Containment Monitor To The Lower Containment Locally

Alternate Path: N/A

Facility JPM #: 3-OT-JPMA044A Rev 2

K/A Rating(s): 002K4.05 [3.8/4.2] 029K1.02 [3.3/3.6] 002A3.01 [3.7/3.91

Task Standard: 1-RM-90-112 is located, and valves are aligned and 1-RM-90-112 is sampling the

lower containment per SOI-90.02 Section 8.1

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator In-Plant X Perform Simulate X

References: SOI-90.02 "Gaseous Process Radiation Monitors" Rev. 11

Task Number:: AUO-090-SOI-90.2-005 APPLICABLE FOR: AUO/RO/SRO

10CFR55.45: 9

Validation Time: 15 min. Time Critical: No

Applicant: Time Start:

NAME SSN Time Finish:

Performance Rating: SAT _ UNSAT Performance Time

Examiner: /

NAME SIGNATURE DATE

COMMENTS

JPMA44A/Local

Page 3 of 13

Tools/Equipment/Procedures Needed:

Hard Hat, Safety Glasses, Flashlight, Hearing Protection, and Plant Approved Shoes.

Latest revision of SOI-90.02.

ALARA considerations.

READ TO OPERATOR

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control

room steps shall be performed for this JPM, including any required

communications. I will provide initiating cues and reports on other actions when

directed by you. Ensure you indicate to me when you understand your assigned

task. To indicate that you have completed your assigned task return the handout

sheet I provided you.

INITIAL CONDITIONS:

Unit One is at 10 % power following a startup.

1-RM-90-106 "Lower Containment Air Monitor" and 1-RM-90-112 "Upper Containment

Air Monitor" were aligned and were sampling their respective containments (normal

alignment).

1-RM-90-106 has tripped, neither sample pump could be restarted, and monitor was

shutdown per the appropriate procedure.

You are the Auxiliary Bldg AUO.

INITIATING CUES:

You have been directed by the Operator At Controls to align 1-RM-90-112 to

sample lower containment.

You are to notify the MCR operator when you have completed this alignment.

JPMA44A/Local

Page 4 of 13

START TIME:

I1

i

STEP 1: Obtain a copy of the appropriate instruction

SAT

STANDARD: A copy of SOI-90.02 Section 8.1 has been obtained

EXAMINER'S CUE: After the performer identifies correct instruction, the UNSAT

evaluator can provide a copy of the instruction.

COMMENTS:

7

NOTE If any Radiation Monitor experiences sufficient elevated

reading above normal request MIG to perform purge.

Cue: If asked, or MCR contacted, state Radiation Monitors are

reading normal.

I

STEP 2: [Step 1] ENSURE Upper Containment Air Monitor Aligned

per Section 5.2.

SAT

STANDARD: The performer determines that Upper Containment Air Monitor

is aligned normal per task assignment sheet.

UNSAT

    • CUE: IF asked, state that Section S01-90.02 Section 5.2 has

been completed and the Upper Containment Monitor is

sampling Upper Containment.

COMMENTS:

"**ltalicizedCues Are To Be Used Only If JPM PerformanceIs Being Simulated.

J PMA44A/Local

Page 5 of 13

I

STEP 3: [Step 2] NOTIFY Chem lab of intent to realign monitors so

that proper sampling of Cntmt. and release permits are

addressed.

SAT

STANDARD: The performer notifies Chem Lab of the intent to realign upper

containment monitor 1-RM-90-112 to the lower containment.

UNSAT

    • CUE: Respond as Chem Lab, using repeat back to the

notification as stated by the performer.

COMMENTS:

STEP 4: [Step 3] SHUTDOWN Lower Containment Air Monitor per

Section 7.1.

SAT

STANDARD: The performer determines that lower containment air monitor

1-RM-90-106 has been shut down based on task assignment

sheet.

UNSAT

    • CUE: Respond as OAC if contacted, using repeat back that

SOI-90.02 Section 7.1 has been completed for the lower

containment monitor.

COMMENTS:

"**ItalicizedCues Are To Be Used Only If JPM PerformanceIs Being Simulated.

JPMA44A/Local

Page 6 of 13

CRITICAL

STEP 5: [Step 4] ENSURE 1-RE-90-106 and 1-RE-90-112 pumps are

OFF before aligning monitor. CRITICAL

STEP

STANDARD: The performer locally checks90-106 and 90-112 monitor

sample pumps and turns off the running sample pump on the

1-90-RM-1 12 monitor (switch above monitor cabinet). SAT

Step is critical prevent burn-up of sample pump during

valve alignments to follow.

UNSAT

NOTE TO EVALUATOR: Underlined portion above is critical portion of

this step.

    • CUE: IF asked and when checked, state the following for

respective monitor:

  • RM-106 sample pumps "off" green light is LIT and

both handswitch stop pushbuttons are IN

  • RM-1 12, sample pump 11 2A in service red "on" light

is LIT and sample pump 112B green "off" light is LIT.

State sample pump for 11 2A green light is LIT and red

light is OFF when running pumps handswitch STOP

pushbutton is depressed.)

COMMENTS:

t

STEP 6: [Step 5] RECORD the monitor sample pump STOPPED (N/A

pump NOT stopped)

[a] 1-HS-90-112A

[b] 1-HS-90-112B SAT

STANDARD: The performer records the sample pump stopped in the

previous step I -HS-90-112A for the A pump. UNSAT

COMMENTS:

"**ItalicizedCues Are To Be Used Only If JPM PerformanceIs Being Simulated.

JPMA44A/Local

Page 7 of 13

Evaluator Note: JPM steps 7, 8, and 9 are part of the same procedure step,

can be performed in any order. I

I

STEP 7: [STEP 6] PERFORM THE FOLLOWING: CRITICAL

NOMENCLATURE STEP

LOCATION POSITION UNID

LOWER CONTAINMENT SUP A3U1737 OPEN 1-ISIV-90-112A

TO 1-RE-90-112 CROSS TIE

STANDARD: Performer locates 1-ISIV-90-112A and rotates hand wheel SAT

counter clockwise until valve is fully open. (Valve located

above monitor)

Step is critical align to upper containment monitor to lower UNSAT

containment.

    • CUE: After performer indicates how to open the valve, state

that the valve handle rotated several turns in the counter

clockwise direction and stops.

COMMENTS:

i __________________________

"**Italicized Cues Are To Be Used Only If JPM PerformanceIs Being Simulated.

JPMA44A/Local

Page 8 of 13

STEP 8: [STEP 6] PERFORM THE FOLLOWING: CRITICAL

STEP

NOMENCLATURE LOCATION POSITION UNID

CNTMT TO RM-106 CIV-CVI 0-M-12 CLOSED 1-HS-90-110

INSIDE CNTMT

CNTMT TO RM-106 CIV-CVI 0-M-12 CLOSED 1-HS-90-111

OUTSIDE CNTMT

CNTMT TO RM-112 CIV-CVI 0-M-12 CLOSED 1-HS-90-113

OUTSIDE CNTMT

CNTMT TO RM-112 CIV-CVI 0-M-12 CLOSED 1-HS-90-114

INSIDE CNTMT

CNTMT TO RM-112 CIV-CVI 0-M-12 CLOSED 1-HS-90-115

INSIDE CNTMT I

STANDARD: Performer contacts the control room and has the above valves SAT

positioned to the CLOSED position. Valves90-113, 90-114,90-115 are closed and verified closed by communication with

the control room. Valves90-110 & 111 are verified closed by

communication with the control room. UNSAT

Step is critical to ensure proper flow path from lower

containment to the upper containment monitor.

NOTE TO EVALUATOR: Underlined portion above is only portion that is

critical.

    • CUE: Respond as the MCR when contacted, using proper

communication technique and then state that 1-HS-90

110 & 111 hand switches were already closed, 1-HS-90

113, 114, & 115 hand switches have been placed to the

CLOSED position.

COMMENTS:

    • Italicized Cues Are To Be Used Only If JPM PerformanceIs Being Simulated

J PMA44A/Local

Page 9 of 13

7

STEP 9: [STEP 6] PERFORM THE FOLLOWING: CRITICAL

STEP

NOMENCLATURE LOCATION POSITION UNID

CNTMT TO RM-1 12 CIV-CVI 0-M-12 OPEN 1-HS-90-116

INSIDE CNTMT

CNTMT TO RM-112 CIV-CVI 0-M-12 OPEN 1-HS-90-117

OUTSIDE CNTMT

CNTMT TO RM-106 CIV-CVI 0-M-12 OPEN 1-HS-90-107

OUTSIDE CNTMT

CNTMT TO RM-106 CIV-CVI 0-M-12 OPEN 1-HS-90-108

INSIDE CNTMT

CNTMT TO RM-106 CIV-CVI 0-M-12 OPEN 1-HS-90-109

INSIDE CNTMT II

STANDARD: Performer contacts the control room and has the above valves SAT

positioned to the OPEN position. Valves90-116, 90-117 are

opened and verified open by communication with MCR. Valves90-107, 90-108, & 90-109 are verified open by communication

with control room. UNSAT

Step is critical to ensure proper flow path from lower

containment to the upper containment monitor.

NOTE TO EVALUATOR: Underlined portion above is only portion that is

critical.

    • CUE: Respond as the MCR when contacted, using proper

communication technique and then state that I -HS-90-116

& 117 hand switches have been placed to the OPEN

position.

    • CUE: Respond as the MCR when contacted, using proper

communication technique and state 1-HS-90-107, 108, &

109 hand switches were already in the OPEN position.

COMMENTS:

    • Italicized Cues Are To Be Used Only If JPM PerformanceIs Being Simulated.

JPMA44A/Local

Page 10 of 13

STEP 10: [STEP 7] START the monitor sample pump STOPPED in Step CRITICAL

[5] (N/A pump NOT started): STEP

[a] 1-HS-90-112A

[b] 1-HS-90-112B

SAT

STANDARD: The performer starts the proper sample pump that was

shutdown earlier using 1-HS-90-112A for the A pump..

Step is critical to establish flow from lower containment to UNSAT

the upper containment monitor.

    • CUE: When performer indicated how pump is started and if

asked state sample pump for 112A red "on" light is LIT

and green "off" light is OFF. Supply the following if/when

asked:

I-FI-90-112A indicates t 12 SCFM,

1-FI-90-112C indicates z 2.1 SCFM,

I -PI-90-1 12B indicates 2" vacuum,

I -PI-90-112A indicates 4" vacuum,

Iodine Low Flow red alarm light is LIT

COMMENTS:

I

STEP 11: [STEP 8] IF IODINE LOW FLOW ALARM on skid comes in,

THEN RESET with 1-HS-90-112JB.

SAT

STANDARD: The performer resets the iodine low flow alarm with 1-HS-90

112JB.

    • CUE: When asked and when checked, State that Iodine Low UNSAT

Flow red light is LIT.

    • CUE: When asked, State that light turns off when performer

operates 1-HS-90-112JB to reset.

COMMENTS:

    • ItalicizedCues Are To Be Used Only If JPM PerformanceIs Being Simulated.

JPMA44A/Local

rage II of 13

STEP 12: [STEP 9] PERFORM MONITOR SOURCE CHECK [0-M-12],

and ENSURE 1-RM-90-112 green OPERATE Light LIT and red

HIGH & yellow ALERT Lights NOT LIT.,

SAT

ENSURE ANN 173-A UPR CNTMT AIR 1-RM-112 RAD HI, NOT

LIT.

ENSURE ANN 173-D UPR CNTMT AIR 1-RM-1 12 INSTR

MALF, NOT LIT.

UNSAT

STANDARD: Performer contacts the control room to have the 90-112

monitor source checked and verifies that green operate light is

LIT and High & Alert light are NOT LIT and ANNs windows

173-A and 173-D are NOT LIT.

    • CUE: Respond as the MCR when contacted using proper

communication technique, then state:

v monitor source check was successful

  • green OPERATE light is LIT
  • High & Alert lights for monitor are NOT LIT
  • ANN windows 173-A & 173-D are NOT LIT.

COMMENTS:

I-

STEP 13: [STEP 10] ENSURE Local Panel Lights RESET

STANDARD: SAT

The performer verifies that Filter Failure light is NOT LIT,

verifies that the Particulate LOW Flow Light is NOT LIT,

verifies that the Iodine LOW flow Light is NOT LIT.

    • CUE: If asked and when checked, state that UNSAT

"* Iodine Low Flow light is NOT LIT (If Iodine low flow

was not reset in JPM step 11 step [8], this light will be

LIT)

"* Particulate Low flow light is NOT LIT

"* Filter Fail light is NOT LIT

COMMENTS:

I_____________________________

"**ltalicized Cues Are To Be Used Only If JPM PerformanceIs Being Simulated.

JPMA44A/Local

Page 12 of 13

STEP 14: Notify Operator At Controls that Upper Containment Monitor

has been aligned to Lower Containment.

STANDARD: The performer contacts the control room and reports that the

Upper Containment Monitor is aligned to Lower Containment.

SAT

    • CUE: When notified, acknowledge the report using "repeat

back"

UNSAT

COMMENTS:

END OF TASK

i ____________________________________________________

TIME STOP:

"**ItalicizedCues Are To Be Used Only If JPM PerformanceIs Being Simulated.

Page 13 of 13

APPLICANT CUE SHEET

(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control

room steps shall be performed for this JPM, including any required

communications. I will provide initiating cues and reports on other actions when

directed by you. Ensure you indicate to me when you understand your assigned

task. To indicate that you have completed your assigned task return the handout

sheet I provided you.

INITIAL CONDITIONS:

Unit One is at 10 % power following a startup.

1-RM-90-106 "Lower Containment Air Monitor" and 1-RM-90-112 "Upper Containment

Air Monitor" were aligned and were sampling their respective containments (normal

alignment).

1-RM-90-106 has tripped, neither sample pump could be restarted, and monitor was

shutdown per the appropriate procedure.

You are the Auxiliary Bldg AUO.

INITIATING CUES:

You have been directed by the Operator At Controls to align 1-RM-90-112 to

sample lower containment.

You are to notify the MCR operator when you have completed this alignment.

JPMA098/Local

Page 1 of 8

REGION I!

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

B.2.c JPMA098/Local

ALIGNMENT OF ERCW TO 1A-A CCP LUBE OIL HEAT

EXCHANGER PER AOI-15

APPLICANT

EXAMINER

JPMA098/Local

Page 2 of 8

REGION II

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

Task: ALIGNMENT OF ERCW TO 1A-A CCP LUBE OIL HEAT EXCHANGER PER AO-1i5

Alternate Path: N/A

Facility JPM #: 3-OT-JPMA098 Rev 3

K/A Rating(s): 026AA1.03 [3.6/3.6] 2.1.30 [3.9/3.4]

Task Standard: ERCW is aligned to the lA-A CCP per AOl-15, Attachment I within 12 minutes.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator In-Plant X Perform Simulate X

References: AOI-15 "Loss Of Component Cooling Water (CCS)" Rev.18

Task Number:: RO-070-AOI-15-003 APPLICABLE FOR: AUO/RO/SRO

AUO-067-AOI-15-001

1OCFR55.45: 8, 9, 10

REQUIRED COMPLETION Time: 12 min. Time Critical: YES

Applicant: Time Start:

NAME SSN Time Finish:

Performance Rating: SAT UNSAT Performance Time

Examiner: /

NAME SIGNATURE DATE

COMMENTS

JPMA098ILocal

Page 3 of 8

Tools/Equipment/Procedures Needed:

Hard Hat, Safety Glasses, Flashlight, Hearing Protection, and Plant Approved Shoes.

AO1-1 5 Attachment 1 (Latest revision)

Auxiliary Building Entry Under RWP.

Ladder Safety since some valves require access from above floor elevation, and

ALARA considerations.

NOTE: Start this JPM at the Rad Waste AUO Desk EL 692.

NOTE: Hand Attachment 1of AO1-15 to the performer with their handout

sheet

READ TO OPERATOR

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control

room steps shall be performed for this JPM, including any required

communications. I will provide initiating cues and reports on other actions when

directed by you. Ensure you indicate to me when you understand your assigned

task. To indicate that you have completed your assigned task return the handout

sheet I provided you.

INITIAL CONDITIONS:

The unit has experienced a loss of Train A Component Cooling Water.

The 1A-A CCP is in service and is the only available charging pump.

You are an AUO on shift.

INITIATING CUES:

You have been instructed by the Unit Operator to align ERCW to the 1A-A CCP

lube oil heat exchanger per Attachment 1 of AOl-15.

You are to notify the Unit Operator when the appendix is complete.

THIS IS A TIME CRITICAL JPM.

JPMA098/Local

Page 4 of 8

START TIME:

CAUTION: CCP may survive for only 10 to 12 minutes after loss of CCS

to lube oil cooler.

NOTE: All valves are located in CCP 1A-A room, except for 1-ISV-67

602A, CVCS CCP ROOM CLR 1A ERCW RET ISOL which is

outside the room [A4T/692]

-I-

STEP 1: [STEP 1] CLOSE 1-ISV-67-602A, CVCS CCP ROOM CLR

CRITICAL

1A-A ERCW RET ISOL [A4T/692].

STEP

STANDARD: 1-ISV-67-602A is closed by pulling the orange handle 90'.

SAT

(perpendicular to the pipe).

Step is critical to isolate flow path from cooler to ERCW

return header.

UNSAT

EXAMINER'S CUE: After the performer has demonstrated the method of

closing the valve, state that the valve handle is

perpendicular to the pipe.

COMMENTS:

4

STEP 2: [Step 2] CLOSE 1-ISV-70-553A, CCP1A-A OIL COOLERS CRITICAL

CCS INLET ISOLATION. STEP

STANDARD: 1-ISV-70-553A is closed by rotating the valve hand wheel

SAT

clockwise.

Step is critical to isolate flow path to CCS Supply header.

UNSAT

    • CUE: After the performer has demonstrated the method of

closing the valve, state that the valve travels several

turns in the clockwise direction and stops.

COMMENTS:

I ______________________________

"**Italicized Cues Are To Be Used Only If JPM PerformanceIs Being Simulated.

JPMA098/Local

Page 5 of 8

STEP 3: [STEP 3] CLOSE 1-THV-70-554A, CCP1A-A OIL COOLERS CRITICAL

CCS OUTLET THROTTLE. STEP

STANDARD: 1-THV-70-554A is closed by rotating the valve hand wheel

clockwise.

SAT

Step is critical to isolate flow path to CCS Return header.

    • CUE: After the performer has demonstrated the method of

closing the valve, state that the valve travels several UNSAT

turns in the clockwise direction and stops.

COMMENTS:

STEP 4: [STEP 4] CLOSE 1-DRV-67-1017B, CCP OIL CLR ERCW CRITICAL

SUP XTIE HDR DRAIN. STEP

STANDARD: 1-DRV-67-1017B is closed by rotating the valve hand wheel SAT

clockwise.

Step is critical to isolate flow path from ERCW supply

drain to enable ERCW to be aligned to supply oil cooler. UNSAT

    • CUE: After the performer has demonstrated the method of

closing the valve, state that the valve travels several

turns in the clockwise direction and stops.

COMMENTS:

"**ltalicizedCues Are To Be Used Only If JPM PerformanceIs Being Simulated.

JPMA098/Local

Page 6 of 8

Note To Evaluator: Performance Steps 5 through 7 are all part of the

same Attachment steD.

STEP 5: [STEP 5] ESTABLISH ERCW flow to lube oil cooler: CRITICAL

a. OPEN 1-ISV-67-1015B, CCP OIL CLR ERCW SUP XTIE STEP

ISOL.

SAT

STANDARD: 1-ISV-67-1015B is opened by rotating the valve hand wheel

counter-clockwise.

Step is critical to provide flow path from ERCW to CCP. UNSAT

    • CUE: After the performer has demonstrated the method of

opening the valve, state that the valve travels several

turns in the counter-clockwise direction and stops.

COMMENTS:

I

STEP 6: b. OPEN 1-ISV-67-1016B, CCP OIL CLR ERCW SUP XTIE CRITICAL

ISOL. STEP

STANDARD: 1-ISV-67-1016B is opened by rotating the valve hand wheel SAT

counter-clockwise.

Step is critical to supply ECRW flow path to CCP Lube Oil

Cooler. UNSAT

    • CUE: After the performer has demonstrated the method of

opening the valve, state that the valve travels several

turns in the counter-clockwise direction and stops.

COMMENTS:

.1______________________________________

"*ItalicizedCues Are To Be Used Only If JPM PerformanceIs Being Simulated.

JPMA098/Local

Page 7 of 8

STEP 7: c. OPEN 1-DRV-70-782A, CCP 1A-A OIL COOLERS CCS CRITICAL

OUTLET DRAIN to establish ERCW flow to oil coolers. STEP

STANDARD: 1-DRV-70-782A is opened by rotating the valve hand wheel

SAT

counter-clockwise.

Step is critical to provide flow path from CCP Lube Oil

Cooler to floor drain. UNSAT

    • CUE: After the performer has demonstrated the method of

opening the valve, state that the valve travels several

turns in the counter-clockwise direction and stops.

    • CUE: If asked, water is gushing into the floor drain from the

hose connected to the line.

NOTE TO EVALUATOR: NOTE TIME VALVE SIMULATED OPEN

COMMENTS:

STEP 8: Notify the Unit Operator that the Attachment 1 of AOl-1 5 is

complete.

STANDARD: The Unit is notified that the Attachment 1 is complete.

    • CUE: When notified, acknowledge the report using repeat SAT

back.

COMMENTS: UNSAT

END OF TASK

I_________________________

TIME STOP:

"**Italicized Cues Are To Be Used Only lf JPM PerformanceIs Being Simulated.

Page 8 of 8

CANDIDATE CUE SHEET

(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control

room steps shall be performed for this JPM, including any required

communications. I will provide initiating cues and reports on other actions when

directed by you. Ensure you indicate to me when you understand your assigned

task. To indicate that you have completed your assigned task return the handout

sheet I provided you.

INITIAL CONDITIONS:

The unit has experienced a loss of Train A Component Cooling Water.

The 1A-A CCP is in service and is the only available charging pump.

You are an AUO on shift.

INITIATING CUES:

You have been instructed by the Unit Operator to align ERCW to the 1A-A CCP

lube oil heat exchanger per Attachment I of AOl-1 5.

You are to notify the Unit Operator when the appendix is complete.

THIS IS A TIME CRITICAL JPM.

JPMRADMIN A.1.a

Page 1 of 6

REGION II

INITIAL LICENSE EXAMINATION

ADMINISTRATIVE JOB PERFORMANCE MEASURE

A.l.a JPMRADMIN

DETERMINE MAIN TURBINE ROLL AND LOADING

RATES USING SOI-47.02 GRAPHS

APPLICANT

EXAMINER

JPMRADMIN A.1.a

Page 2 of 6

REGION II

INITIAL LICENSE EXAMINATION

ADMINISTRATIVE JOB PERFORMANCE MEASURE

Task: DETERMINE MAIN TURBINE ROLL AND LOADING RATES USING SOI-47.02 GRAPHS

Alternate Path: N/A

Facility JPM #: New

K/A Rating(s): 2.1.25 [2.8/3.1]

Task Standard: Time for roll of main turbine to synch speed and loading rates are determined

based upon initial HP 1 st stage metal temperature.

References: SOI-47.02 "Turbo-Generator Startup Operation" Rev. 23

Task Number:: RO-047-SOI-47-003 APPLICABLE FOR: RO/SRO

RO-047-SOI-47-003

IOCFR55.45: 5, 6

Validation Time: min. Time Critical: No

Applicant: Time Start:

NAME SSN Time Finish:

Performance Rating: SAT UNSAT Performance Time

Examiner: I

NAME SIGNATURE DATE

COMMENTS

JPMRADMIN A.l.a

Page 3 of 6

Tools/Equipment/Procedures Needed:

Latest revision of SOI-47.02.

Ruler or straight edge.

Calculator

NOTE: START THIS JPM AT A LOCATION WHERE PERFORMER HAS ACCESS

TO PROCEDURES (Simulator, Main Control Room, TIC or provide

performer with procedure).

READ TO OPERATOR

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the administrative task to be

performed. I will provide initiating cues and reports on other actions when

directed by you. Ensure you indicate to me when you understand your assigned

task. To indicate that you have completed your assigned task return the handout

sheet I provided you.

INITIAL CONDITIONS:

The Main Turbine-generator had been shut down 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> ago to perform a repair of

an EHC oil leak that has been subsequently repaired.

Main Turbine roll and turbo-generator loading is scheduled as the next activity.

The CRO is performing SOI-47.02, TURBO-GENERATOR STARTUP OPERATION.

Turbine IMPULSE CHAMBER METAL temp [1-TR-47-2, ptl] is 150OF

You are the CRO.

INITIATING CUES:

Using Appendix C of SOI 47.02 perform the following:

"* Determine the turbine maximum acceleration rate and minimum time allowed by

procedure to bring main turbine to sync speed.

"* Determine the minimum length of time that turbine load must held at 5%.

"* Determine the minimum time allowed by procedure to increase load to 100% after

completion of the 5% hold. Assume no other restrictions on loading rate.

  • Write and circle answer at bottom of graph.

JPMRADMIN A.l.a

Page 4 of 6

START TIME:

STEP 1: Obtain a copy of the instruction.

SAT

STANDARD: A copy of SOI-47.02 has been obtained.

EXAMINER'S CUE: After the performer identified correct instruction, the

evaluator can provide a copy of the instruction. UNSAT

COMMENTS:

+

STEP 2: Determine the turbine acceleration rate and minimum time

allowed by procedure to bring main turbine to sync speed.

SAT

STANDARD: Using Appendix C of SOI-47.02 for 150 0 F, the performer

determines that minimum time to reach synch speed is 0.75 (+

0.1) hrs ( or 45 +/-6) minutes. Acceleration rate

1800rpm/44.2min = 40 (34 - 46) rpm/minute. UNSAT

COMMENTS:

"**ItalicizedCues Are To Be Used Only If JPM PerformanceIs Being Simulated.

JPMRADMIN A.1.a

Page 5 of 6

STEP 3: Determine the minimum length of time that turbine load must

held at 5%.

SAT

STANDARD: Using Appendix C of SOI-47.02 for 1500 F, the performer

determines that minimum time to hold turbine generator at

minimum load is 0.875 (+/- 0.125) hrs (or 52.5 +/- 7.5) minutes.

UNSAT

COMMENTS:

STEP 4: Determine the minimum time allowed by procedure to increase

load to 100% after completion of the 5% hold. Assume no

other restrictions on loading rate.

SAT

STANDARD: Using Appendix C of SOI-47.02 for 150 0 F, the performer UNSAT

determines that it will take 2.625 (+/- 0.2) additional hours to

reach 100% load (157.5 +/- 7.5 minutes). Assuming 5% initial

load to 100% load to take 157.5 +/- 7.5 minutes.

COMMENTS:

END OF TASK

END OF TAS

TIME STOP:

"**ItalicizedCues Are To Be Used Only If JPM PerformanceIs Being Simulated.

Page 6 of 6

APPLICANT CUE SHEET

(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the administrative task to be

performed. I will provide initiating cues and reports on other actions when

directed by you. Ensure you indicate to me when you understand your assigned

task. To indicate that you have completed your assigned task return the handout

sheet I provided you.

INITIAL CONDITIONS:

The Main Turbine-generator had been shut down 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> ago to perform a repair of

an EHC oil leak that has been subsequently repaired.

Main Turbine roll and turbo-generator loading is scheduled as the next activity.

The CRO is performing SOI-47.02, TURBO-GENERATOR STARTUP OPERATION.

Turbine IMPULSE CHAMBER METAL temp [1-TR-47-2, ptl] is 150 0 F

You are the CRO.

INITIATING CUES:

"* Determine the turbine acceleration rate and minimum time allowed by procedure

to bring main turbine to sync speed.

"* Determine the minimum length of time that turbine load must held at 5%.

"* Determine the minimum time allowed by procedure to increase load to 100% after

completion of the 5% hold. Assume no other restrictions on loading rate.

JPMRADMIN A.1.a

Page 2 of 6

REGION II

INITIAL LICENSE EXAMINATION

ADMINISTRATIVE JOB PERFORMANCE MEASURE

Task: DETERMINE MAIN TURBINE ROLL AND LOADING RATES USING SOI-47.02 GRAPHS

Alternate Path: N/A

Facility JPM #: New

K/A Rating(s): 2.1.25 [2.8/3.1]

Task Standard: Time for roll of main turbine to synch speed and loading rates are determined

based upon initial HP 1 st stage metal temperature.

References: SOI-47.02 "Turbo-Generator Startup Operation" Rev. 25

Task Number:: RO-047-SOI-47-003 APPLICABLE FOR: RO/SRO

RO-047-SOI-47-003

1OCFR55.45: 5, 6

Validation Time: min. Time Critical: No

Applicant: Time Start:

NAME SSN Time Finish:

Performance Rating: SAT UNSAT _ Performance Time _

Examiner:

NAME SIGNATURE DATE

COMMENTS

WBN TURBO-GENERATOR STARTUP OPERATION SOI-47.02

I Revision 25

Page 57 of 73

APPENDIX C

Page 1 of 1

TURBINE STARTUP CURVE

4APPLY INMAL LOAO =S% 10[*I-410% 1,4- 2w/.

0)

r:

w

LuJ

0

°F INITIAL HP 1ST-STAGE METAL TEMP

WBN TURBO-GENERATOR STARTUP OPERATION SOI-47.02

I Revision 25

Page 57 of 73

APPENDIX C

Page 1 of 1

TURBINE STARTUP CURVE

H-APPLY INMAL LOAD 5% .~~410% b }4- 20%-).

I

4.C

H

0)

c:

3.5 6

0

. INCREASE -

uJ LOAD

w 64 pzý

2.

F:

1.0 ,,, -*X \

"0~

0. ACCELERATE TO

SYNC SPEED

50 100 1,=0 200 250 300 350 400 450 500T

Q Ao0 -t 4L'- U

0

o L~$

JPMRADMIN A.l.b

Page 1 of 8

REGION II

INITIAL LICENSE EXAMINATION

ADMINISTRATIVE JOB PERFORMANCE MEASURE

A.l.b JPMRADMIN

OBTAIN AND VERIFY CONTROLLED PROCEDURE

COPY USING CURATOR

APPLICANT

EXAMINER

JPMRADMIN A.1.b

Page 2 of 8

REGION II

INITIAL LICENSE EXAMINATION

ADMINISTRATIVE JOB PERFORMANCE MEASURE

Task: OBTAIN AND VERIFY CONTROLLED PROCEDURE COPY USING CURATOR

Alternate Path: N/A

Facility JPM #: New

K/A Rating(s): 2.1.21 [3.1/3.2]

Task Standard: Verify for use a controlled procedure copy using CURATOR.

References: SPP-2.3 "Document Control" Rev. 4 Section 3.11 and 3.12.

Task Number:: AUO-1 19-SSP-2.55-004 APPLICABLE FOR: AUO/RO/SRO

10CFR55.45:

Validation Time: min. Time Critical: No

Applicant: Time Start:

NAME SSN Time Finish:

Performance Rating: SAT UNSAT Performance Time

Examiner: /

NAME SIGNATURE DATE

COMMENTS

JPMRADMIN A. 1.b

Page 3 of 8

ToolslEquipment/Procedures Needed:

Access to computer that has Curator (FYI) that can produce hard copies of documents.

NOTE: START THIS JPM AT A LOCATION WHERE PERFORMER HAS ACCESS

TO COMPUTER THAT HAS CURATOR ACCESS TO WBN. (Main Control

Room, TIC or Shift Clerk's Office, Tagging Office, Classroom.).

NOTE TO EVALUATOR: If curator (FYI) program is presently open or minimized, have

the performer exit the program before assigning the task. At the completion of the task,

have the performer exit curator (FYI) program.

NOTE TO EVALUATOR: This JPM should be given in conjunction with Sim 3 JPMR168.

READ TO OPERATOR

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the administrative task to be

performed. I will provide initiating cues and reports on other actions when

directed by you. Ensure you indicate to me when you understand your assigned

task. To indicate that you have completed your assigned task return the handout

sheet I provided you.

INITIAL CONDITIONS:

The Unit is at 100% rated thermal power.

S01-65.02 "Emergency Gas Treatment System" is scheduled to be performed later in

the current shift.

You are the CRO.

INITIATING CUES:

  • The Unit Supervisor has directed you to obtain a copy of SOI-65.02 from

CURATOR.

0 Inform the Unit Supervisor when you have obtained this copy.

JPMRADMIN A.1.b

Page 4 of 8

START TIME:

STEP 1: Locate a computer that has access to CURATOR.

SAT

STANDARD: Performer locates computer that has access to CURATOR.

COMMENTS: UNSAT

STEP 2: Open CURATOR software program and access WBN's Curator

files.

SAT

STANDARD: Performer selects the "FYI" icon and opens program, selects

WBNFYI Prod and enters OK Performer enters Login ID and

password.

UNSAT

NOTE TO EVALUATOR: Login ID can also be LOOKUP or GUEST,

Password can also be LOOKUP or GUEST.

COMMENTS:

"**ltalicizedCues Are To Be Used Only If JPM PerformanceIs Being Simulated.

JPMRADMIN A.l.b

Page 5 of 8

STEP 3: Select procedure general from Search Class List to obtain

Search Screen.

SAT

STANDARD: Performer Selects PROCEDURE GENERAL from the search

class list by selecting it (i.e., highlighting it) with mouse, then

either double click mouse or use forward arrow at top of file.

UNSAT

COMMENTS:

STEP 4: Enter procedure number into search screen in the Procedure

Number field.

SAT

STANDARD: Performer enters SOI-65.02 into procedure number field of the

search screen and then depresses enter key or clicks on

forward arrow. Performer may enter SOl into the procedure

type field and select advance, then scroll until procedure found. UNSAT

Performer may enter a combination of letters into the

procedure title field (i.e., CONTAIN "EMERGENCY" or "GAS"

etc.).

COMMENTS:

    • ItalicizedCues Are To Be Used Only If JPM PerformanceIs Being Simulated.

JPMRADMIN A.1.b

Page 6 of 8

STEP 5: Selects procedure SOI-65.02 from the document list and opens

document.

STANDARD: SAT

Performer advances to next step Folder Screen and selects

SOI-65.02 and advances to document screen and then

advances to open document.

UNSAT

NOTE TO EVALUATOR: Document will open in the appropriate format

for viewing. (WORD or IMAGENATION).

COMMENTS:

4-

STEP 6: Print a copy of SOI-65.02, retrieve copy from printer.

STANDARD: Performer simulates printing a copy of SOI-65.02. SAT

EVALUATOR CUE: Simulate what you would do to print the document.

NOTE TO EVALUATOR: Do not allow print of document. -UNSAT

COMMENTS:

.1. ___________________________

"**Italicized Cues Are To Be Used Only If JPM PerformanceIs Being Simulated.

JPMRADMIN A.1 .b

Page 7 of 8

STEP 7: Inform Unit Supervisor that a copy of SOI-65.02 has been

obtained from CURATOR.

SAT

STANDARD: Performer Informs Unit Supervisor that a copy of SOI-65.02

has been obtained from CURATOR. UNSAT

    • CUE: Acknowledge report as Unit Supervisor using repeat

back.

    • CUE: Have applicant close all windows opened and exit from

curator.

COMMENTS:

END OF TASK

TIME STOP:

"**ItalicizedCues Are To Be Used Only If JPM PerformanceIs Being Simulated.

Page 8 of 8

APPLICANT CUE SHEET

(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the administrative task to be

performed. I will provide initiating cues and reports on other actions when

directed by you. Ensure you indicate to me when you understand your assigned

task. To indicate that you have completed your assigned task return the handout

sheet I provided you.

INITIAL CONDITIONS:

The Unit is at 100% rated thermal power.

SOI-65.02 "Emergency Gas Treatment System" is scheduled to be performed later in

the current shift.

You are the CRO.

INITIATING CUES:

  • The Unit Supervisor has directed you to obtain a copy of SOI-65.02 from

CURATOR.

0 Inform the Unit Supervisor when you have obtained this copy.

JPMRADMIN A.2

Page 1 of 12

REGION II

INITIAL LICENSE EXAMINATION

ADMINISTRATIVE JOB PERFORMANCE MEASURE

A.2 JPMRADMIN

CALCULATE QPTR USING 1-SI-0-21

APPLICANT

EXAMINER

JPMRADMIN A.2

Page 2 of 12

REGION II

INITIAL LICENSE EXAMINATION

ADMINISTRATIVE JOB PERFORMANCE MEASURE

Task: CALCULATE QPTR USING 1-SI-0-21

Alternate Path: N/A

Facility JPM #: New

K/A Rating(s): 2.1.12 [2.9/4.0]

Task Standard: Quadrant Power Tilt Ratio has been determined per 1-SI-0-21 Section 6.1 and

Attachment 1. Acceptance criteria are determined to be not met due for N-42

Lower Detector and N-44 Upper Detector.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator X In-Plant Perform X Simulate

References: 1-SI-0-21 "Excore QPTR & Axial Flux Difference" Rev. 11; Nuclear Operating

Book (NOB) A-2 Sheet 1-3 Rev 38, A-2 Sheet 4 Rev 36.

Task Number:: RO-092-Sl-2-001 APLICABLE FOR: RO/SRO

I OCFR55.45:

Validation Time: 13 min. Time Critical: No

Applicant: Time Start:

NAME SSN Time Finish:

Performance Rating: SAT UNSAT Performance Time

Examiner: /

NAME SIGNATURE DATE

COMMENTS

JPMRADMIN A.2

Page 3 of 12

Tools/EquipmentiProcedures Needed:

Applicant Data Sheet

Latest revision of 1-SI-0-21

Latest revision of NOB Sheets A-2 (all four PR detector channels)

Calculator

NOTE: START THIS JPM AT A LOCATION WHERE PERFORMER HAS ACCESS

TO PROCEDURES (Simulator, Main Control Room, TIC, etc.).

NOTE TO EVALUATOR: Hand out the Applicant Data Sheet along with the Applicant's

Cue Sheet.

READ TO OPERATOR

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the administrative task to be

performed. I will provide initiating cues and reports on other actions when

directed by you. Ensure you indicate to me when you understand your assigned

task. To indicate that you have completed your assigned task return the handout

sheet I provided you.

INITIAL CONDITIONS:

The unit is operating at 100% rated thermal power

AFD Monitor Alarm and QPTR alarms are out of service due to card problem in the

annunciator system.

1-SI-0-21 "Excore QPTR & Axial Flux Difference SI is required to be performed every

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> since both QPTR alarms are inoperable.

Plant computer is not available for performing this SI.

You are a support CRO.

INITIATING CUES:

" Given the data that was just obtained from each power range channel upper and

lower detector currents, the Unit Supervisor directs you to perform Section 6.1

"Excore QPTR Determination" of 1-SI-0-21. M&TE will not be utilized for data

measurements.

"* Report the results to the Unit Supervisor when Attachment I and Section 6.1 have

been completed.

JPMRADMIN A.2

Page 4 of 12

START TIME:

STEP 1: Obtain a copy of the instruction.

SAT

STANDARD: A copy of 1-SI-0-21 has been obtained.

EXAMINER'S CUE: After the performer identified correct instruction, the

evaluator can provide a copy of the instruction. UNSAT

COMMENTS:

NOTE TO EVALUATOR: The following steps are from Section 6.1 of 1-SI

0-21

NOTE I Obtaining QPTR calculated values from the Process Computer

is the preferred method to check that the QPTR is within

Technical Specification limits. QPTR values are obtained from

Process Computer calculated computer points for upper and

lower radial flux tilt. These points are available on the "Tilting

Factors" display. The report may be printed with turn on code

TFREP.

NOTE 2 Up to one inoperable excore channel can be marked NIA if

THERMAL POWER is < 75% RTP.

STEP 2: [Step 1] IF the process Computer is available, THEN PRINT the

Tilting Factors Report AND/OR PERFORM the QPTR

calculations using Attachment 1.

SAT

STANDARD: Performer goes to attachment 1 and commences performance

of attachment 1.

UNSAT

COMMENTS:

"**ItalicizedCues Are To Be Used Only If JPM PerformanceIs Being Simulated.

JPMRADMIN A.2

Page 5 of 12

NOTE TO EVALUATOR: The following steps are from Attachment I of 1

SI-0-21

NOTE I Determining detector currents by measuring the voltage i

across the detector's meter test points, using DVM, is the

most accurate method for measuring QPTR and for

determining the validity of a QPTR alarm.

NOTE 2 Using detector current meter readings is another method to

quickly check that QPTR is within limits. These meters are not

as accurate as the DVM readings and may produce

unacceptable results because: 1) the meters on the 'B' drawer

may be scaled too high or (2) the meter may be unstable due

to drift or noise. When unacceptable results are obtained DVM

readings should be obtained, otherwise, Step [1] and [2] may

be marked NIA if DVM not used.

NOTE 3 Up to one inoperable excore channel can be marked NIA if

THERMAL POWER is < 75% RTP.

STEP 3: [Step 1] RECORD DVM information:

A. TVA M&TE ID:

B. Cal Due Date:

SAT

STANDARD: Performer determine step in N/A based on initial conditions for

task performance and proceeds to the next step.

UNSAT

COMMENTS:

I

STEP 4: [Step 2] ENSURE require M&TE is within its current calibration.

SAT

STANDARD: Performer determines step is N/A based on initial conditions for

task performance and proceeds to the next step.

UNSAT

COMMENTS:

I. _________________________

    • ItalicizedCues Are To Be Used Only If JPM PerformanceIs Being Simulated.

JPMRADMIN A.2

Page 6 of 12

NOTE The following determination may be made by measuring the

voltage across the 1000 ohm precision resistor in NIS power

range drawer B. When using this method the Ohm's Law

conversion from a millivolt measurement to a microamp

measurement only requires changing the unit designator (e.g.,

280 millivolts converts to 280 microamps.

CAUTION An inadvetent reactor trip may be prevented by ensuring

that no power range neutron high flux rate or power range

high flux channels are in the tripped condition prior to

taking EACH measurement in the NIS Power Range Drawer

B.

STEP 4: [Step 3] DETERMINE the microamps for each upper and lower

excore detector on each NIS power range drawer B, AND

RECORD below:

UPPER DETECTOR LOWER DETECTOR

NIS Channel It Detector Current lb Detector Current

(microamps) (microamps)

N-41A (369) (384)

N-42A (368) (386)

N-43A (369) (385)

N-44A (371) (386)

STANDARD: Performer obtains the detector current microamp readings from SAT

the handout given during task assignment and enters the

appropriate data into Attachment 1 step 3.

NOTE TO EVALUATOR: Values above in ( ) are detector currents from UNSAT

handout.

COMMENTS:

"**ItalicizedCues Are To Be Used Only If JPM PerformanceIs Being Simulated.

JPMRADMIN A.2

Page 7 of 12

NOTE: Rt and Rb (detector calibration data) changes periodically

throughout the cycle. Current values are on NOB Sheet A-2, NIS

Calibration Data.

STEP 5: [Step 4] OBTAIN and RECORD current values of Rt and Rb

(volts/microamps).

UPPER DETECTOR LOWER DETECTOR

NIS Channel Rt (volts/microamps) Rb (volts/microamps)

N-41A (0.0360) (0.0347)

N-42A (0.0374) (0.0370)

N-43A (0.0360) (0.0342)

N-44A (0.0402) (0.0356)

STANDARD: Performer obtains the detector current values from NOB SAT

Sheets A-2 for the respective NIS Power Range Detectors and

records them in appropriate blocks on Attachment 1 Step 4.

NOTE TO EVALUATOR: Values above in ( ) are detector currents from UNSAT

respective NOB Sheets A-2.

COMMENTS:

"**Italicized Cues Are To Be Used Only If JPM PerformanceIs Being Simulated.

JPMRADMIN A.2

Page 8 of 12

STEP 6: [Step 5] CALCULATE calibrated output voltages by multiplying the

uncalibrated detector output currents by Rt or Rb (as

applicable).

A. Vt=ItxRt

B. Vb= lbx Rb

UPPER DETECTOR LOWER DETECTOR

NIS Channel Vt Calib. Output Vb Calib. Output

Voltage Voltage

N-41A (369) (0.0360)=13.284 (384) (0.0347)=13.325

N-42A (368) (0.0374)=13.763 (386) (0.0370)=14.282

N-43A (369) (0.0360)=13.284 (385) (0.0342)=13.167

N-44A (371) (0.0402)=14.914 (386) (0.0356)=13.742

STANDARD: Performer calculates the calibrated output voltages [Step 3] by SAT

multiplying the respective detector's current reading times

resistance values [step 4] and records the results in

appropriate blocks on Attachment 1 Step 5.

UNSAT

COMMENTS:

4

STEP 7: [Step 6] CALCULATE average calibrated output voltage for the

upper and lower detectors.

UPPER Vt LOWER Vb

AVERAGE (13.284+13.763+13.284+1 (13.325+14.282+13.167+1

4.914)/4 = 13.811 3.742)/4 = 13.629

STANDARD: Performer calculates the average output voltages for the upper SAT

detector by adding the respective upper detector's calibrated

output voltage readings [from Step 5] and dividing the result

by the number of channels in service. This process is repeated

for the lower detector using the lower detector calibrated UNSAT

voltages. The results recorded in appropriate blocks on

Attachment 1 Step 6.

COMMENTS:

"**ItalicizedCues Are To Be Used Only If JPM PerformanceIs Being Simulated.

JPMRADMIN A.2

Page 9 of 12

STEP 8: [Step 7] CALCULATE QPTR values by dividing each detector's

(upper or lower) Calibration Output Voltage by the average

(upper or lower) Calibrated Output Voltage.

A. QPTRt Vt÷ Avg Vt

B. QPTRb =Vb x Avg Vb

UPPER LOWER

DETECTOR DETECTOR

NIS Channel QPTRt Value QPTRb Value

N-41A (13.284/13.81 1)= 0.962 (13.325/13.629)= 0.978

N-42A (13.763/13.81 1)= 0.997 (14.282/13.629)= 1.048

N-43A (13.284/13.811)= 0.962 (13.167/13.629)= 0.966

N-44A (14.914/13.811)= 1.080 (13.742/13.629)= 1.008

STANDARD: Performer calculates QPTR values by dividing the respective SAT

Calibrated Output Voltage [ from step 5] by the Average

Calibrated Output Voltage for each NIS channel detector

[from step 6]. The results recorded in appropriate blocks on

Attachment 1. Performer returns to Section 6.1 Step 7. UNSAT

COMMENTS:

NOTE TO EVALUATOR The following steps are from Section 6.1 of 1

Sl-0-21. I

STEP 9: [Step 2] REVIEW the Upper and Lower QPTR values.

STANDARD: Performer reviews QPTR values from Attachment 1 Step 7. SAT

COMMENTS:

UNSAT

I_____________________________

"**Italicized Cues Are To Be Used Only If JPM PerformanceIs Being Simulated.

JPMRADMIN A.2

c ukjuV~

STEP 10: [Step 3] CHECK (') Acceptance Criteria.

ACCEPTANCE CRITERIA: All operable excore channels

(upper and lower) indicate a QPTR < 1.02. SAT

YES NO

STANDARD: Performer determines that N-42 Lower Detector and N-44A UNSAT

Upper Detector exceed 1.02 QPTR. Performer then checks

NO statement.

COMMENTS:

STEP 11: Inform the Unit Supervisor that Attachment 1 and Section 6.1

of 1-SI-0-21 has been completed and the results of the QPTR.

SAT

STANDARD: Performer inform the Unit Supervisor of the completion of

Attachment 1 and Section 6.1 of 1-SI-0-21 and reports that

acceptance criteria have not been satisfied. QPTR for N-42

Lower Detector is 1.047 and for N-44 Upper detector is 1.079 UNSAT

which exceed QPTR limit of 1.02.

EXAMINER'S CUE: Acknowledge report as Unit Supervisor, then state

We will stop here.

COMMENTS:

END OF TASK

TIME STOP:

"**ltalicized Cues Are To Be Used Only If JPM PerformanceIs Being Simulated.

Page 11 of 12

APPLICANT CUE SHEET

(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the administrative task to be

performed. I will provide initiating cues and reports on other actions when

directed by you. Ensure you indicate to me when you understand your assigned

task. To indicate that you have completed your assigned task return the handout

sheet I provided you.

INITIAL CONDITIONS:

The unit is operating at 100% rated thermal power

AFD Monitor Alarm and QPTR alarms are out of service due to card problem in the

annunciator system.

1-SI-0-21 "Excore QPTR & Axial Flux Difference SI is required to be performed every

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> since both QPTR alarms are inoperable.

Plant computer is not available for performing this SI.

You are a support CRO.

INITIATING CUES:

" Given the data that was just obtained from each power range channel upper and

lower detector currents, the Unit Supervisor directs you to perform Section 6.1

"Excore QPTR Determination" of 1-SI-0-21. M&TE will not be utilized for data

measurements.

"* Report the results to the Unit Supervisor when Attachment 1 and Section 6.1 have

been completed.

Page 12 of 12

APPLICANT DATA SHEET

(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

The following microampere readings were taken from the Power Range

NIS detectors:

UPPER DETECTOR LOWER DETECTOR

NIS Channel It Detector Current IbDetector Current

(microamps) (microamps)

N-41A 369 384

N-42A 368 386

N-43A 369 385

N-44A 371 386

JPMRADMIN A.3

Page 1 of 8

REGION !1

INITIAL LICENSE EXAMINATION

ADMINISTRATIVE JOB PERFORMANCE MEASURE

A.3 JPMRADMIN

DETERMINE IF PERSONNEL WILL EXCEED

ADMINISTRATIVE DOSE LIMITS WHILE

PERFORMING TASK

APPLICANT

EXAMINER

JPMRADMIN A.3

Page 2 of 8

REGION I!

INITIAL LICENSE EXAMINATION

ADMINISTRATIVE JOB PERFORMANCE MEASURE

Task: DETERMINE IF PERSONNEL WILL EXCEED ADMINISTRATIVE DOSE LIMITS WHILE

PERFORMING TASK

Alternate Path: N/A

Facility JPM #: New

K/A Rating(s): 2.3.10 [2.9/3.3]

Task Standard: Performer determines that path from additional equipment building results in the

lowest dose, and that the remaining allowable dose is not exceeded.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator In-Plant Perform X Simulate

References:

Task Number:: AUO-119-SSP-5.01-001 APLICABLE FOR: AUO/RO/SRO

10CFR55.45: 10

Validation Time: 10 min. Time Critical: No

Applicant: Time Start:

NAME SSN Time Finish:

Performance Rating: SAT _ UNSAT Performance Time

Examiner: /

NAME SIGNATURE DATE

COMMENTS

JPMRADMIN A.3

Page 3 of 8

Tools/Equipment/Procedures Needed:

Calculator

NOTE TO EVALUATOR: Hand out the Applicant Data Sheet along with the Applicant's

Cue Sheet.

READ TO OPERATOR

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the administrative task to be

performed. I will provide initiating cues and reports on other actions when

directed by you. Ensure you indicate to me when you understand your assigned

task. To indicate that you have completed your assigned task return the handout

sheet I provided you.

INITIAL CONDITIONS:

The unit had experienced a valid safety injection signal.

The unit had also experienced a loss of both Unit 1 shutdown boards and RCP Seal

Injection and thermal barrier cooling have been isolated per ECA-0.0 Appendix "A".

The unit has also experienced fuel damage.

Shutdown Board 1A has been re-energized and control room dispatches you to locally

start 1A TBBP and throttle open the discharge valve.

A survey map is available for elevation 737 of the auxiliary building, showing dose

rates and travel times to reach the TBBP Discharge valve that you will throttle open.

Three AUO's are available for assignment to perform this task.

RADCON personnel are currently unavailable to provide assistance.

INITIATING CUES:

You have been directed to determine the AUO (s) that could perform task without

exceeding administrative limits:

"* AUO #1 has TEDE of 625 mRem

"* AUO #2 has TEDE of 675 mRem

"* AUO #3 has TEDE of 725 mRem

JPMRADMIN A.3

Page 4 of 8

START TIME:

NOTE TO EVALUATOR: The following steps may be performed out of

order.

I

STEP 1: Calculate Exposure during pump start and throttle valve

operation. SAT

STANDARD: (2 R/hr)(1000MR/R)(1HRI60Min)(5 Min) = 166.67 MR

EXAMINER'S CUE: After the performer identified correct instruction, the UNSAT

evaluator can provide a copy of the instruction.

COMMENTS:

i

STEP 2: Calculate the exposure getting to task area and return.

STANDARD: Dose received for 2 way travel for survey area "B" are added to SAT

dose received in Survey Area "A":

1) (3 R/hr)(1000MR/R)(1HR/60Min)(4 Min) = 200 MR

COMMENTS: UNSAT

1-

STEP 3: Calculate total dose for job.

STANDARD: Dose received for 2 way travel for survey area "B" are added to SAT

dose received in Survey Area "A":

1) Two way Survey Area B = 200 MR

2) Dose in Survey Area A = 166.67 MR

3) Total Dose = 200 MR + 166.67 MR = 366.67 MR UNSAT

COMMENTS:

    • ltalicized Cues Are To Be Used Only If JPM PerformanceIs Being Simulated.

JPMRADMIN A.3

IJnc ~£-%j~I1

  • C ,u Q

STEP 5: Determine total dose that would be received for all AUO.s

involved.

SAT

STANDARD: Performer Determines dose that would be received by AUO's.

1) AUO #1: 625 mrem + 366.67 mrem = 991.67 mrem

2) AUO #2: 675 mrem + 366.67 mrem = 1041.67 mrem

3) AUO #3: 725 mrem + 366.67 mrem = 1091.67 mrem UNSAT

COMMENTS:

I

STEP 5: Determines which AUO can perform tasks without exceeding

Administrative limits.

SAT

STANDARD: Performer determines AUO #1 is the only AUO that could

perform task.

COMMENTS: UNSAT

END OF TASK I _________________________________________________

TIME STOP:

    • ltalicized Cues Are To Be Used Only If JPM PerformanceIs Being Simulated.

Page 6 of 8

APPLICANT CUE SHEET

(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the administrative task to be

performed. I will provide initiating cues and reports on other actions when

directed by you. Ensure you indicate to me when you understand your assigned

task. To indicate that you have completed your assigned task return the handout

sheet I provided you.

INITIAL CONDITIONS:

The unit had experienced a valid safety injection signal.

The unit had also experienced a loss of both Unit 1 shutdown boards and RCP Seal

Injection and thermal barrier cooling have been isolated per ECA-0.0 Appendix "A".

The unit has also experienced fuel damage.

Shutdown Board 1A has been re-energized and control room dispatches you to locally

start 1A TBBP and throttle open the discharge valve.

A survey map is available for elevation 737 of the auxiliary building, showing dose

rates and travel times to reach the TBBP Discharge valve that you will throttle open.

Three AUO's are available for assignment to perform this task.

RADCON personnel are currently unavailable to provide assistance.

INITIATING CUES:

You have been directed to determine the AUO (s) that could perform task without

exceeding administrative limits:

"* AUO #1 has TEDE of 625 mRem

"* AUO #2 has TEDE of 675 mRem

"* AUO #3 has TEDE of 725 mRem

Page 7 of 8

APPLICANT DATA SHEET

(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

SURVEY DATA:

"* TBBP control switches and pump discharge FCV are located in Survey area "A".

"* Estimated time at control switch and discharge valve is 5 minutes.

"* Travel time to Valve & control switches is 2 minutes.

"* General Area Dose rate for Survey Area "A" is 2 R/hr.

"* General Area Dose rate for Survey Area "B"is 3 R/hr.

0 AUO #1 has TEDE of 625 mRem

0 AUO #2 has TEDE of 675 mRem

0 AUO #3 has TEDE of 725 mRem

RESULTS:

Indicate below by checking yes or no if the respective AUO can be

allowed to perform task without exceeding administrative dose limits.

YES NO

AUO #1 11

D1

AUO #2 El 11

AUO #3 El El

Page 8 of 8

APPLICANT DATA SHEET

(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

AUXILIARY BLDG ELEV. 737 G/A

I1

0

I

1. U/2 Heating & Ventilation Room

2. U/2 Vent & Purge Air Room

3. U/2 Gross Failed Fuel Detector Room

4. Spent Fuel Pool Equipment Area

5. U/1 Letdown Heat Exchanger Room

6. U/2 Letdown Heat Exchanger Room

7. U/i1 Gross Failed Fuel Detector Room

8. U/1 Vent & Purge Air Room

9. U/1 Heating & Ventilation Room

10. Hot Instrument Shop

11. Component Cooling Heat Exchangers

JPMRADMIN A.4 RO

Page 1 of 8

REGION II

INITIAL LICENSE EXAMINATION

ADMINISTRATIVE JOB PERFORMANCE MEASURE

A.4.RO JPMRADMIN

RESPOND TO A MEDICAL EMERGENCY IN

ACCORDANCE WITH EPIP-10

APPLICANT

EXAMINER

JPMRADMIN A.4 RO

Page 2 of 8

REGION 11

INITIAL LICENSE EXAMINATION

ADMINISTRATIVE JOB PERFORMANCE MEASURE

Task: DETERMINE CRITICAL SAFETY FUNCTION STATUS TREES WITH SPDS UNAVAILABLE.

Alternate Path: N/A

Facility JPM #: New

K/A Rating(s): 2.4.39 [3.3/3.1]

Task Standard: Performer performs actions of Appendix A of EPIP-10, "Medical Emergency

Response".

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator X In-Plant Perform X Simulate

References: EPIP-10, "Medical Emergency Response", Rev. 12.

Task Number: RO-100-SOI-100-011 APPLICABLE FOR: RO/SRO

10CFR55.45: 11

Validation Time: min. Time Critical: No

Applicant: Time Start:

NAME SSN Time Finish:

Performance Rating: SAT UNSAT Performance Time

Examiner: /

NAME SIGNATURE DATE

COMMENTS

JPMRADMIN A.4 RO

Page 3 of 8

SIMULATOR OPERATOR INSTRUCTIONS:

This JPM may be performed either on the simulator or in another location. If performed

on the simulator refer to the following.

1. Initialize to any IC.

2. Acknowledge all alarms.

3. Freeze simulator for duration of task performance.

5. NOTE: This JPM may be performed using a console booth instructor who acts as

personnel outside the main control room. Cues may be made by him as indicated by

the JPM.

SIMULATOR OPERATOR INSTRUCTIONS:

When directed by the evaluator, place phone call to the "Horsehoe" to initiate the medical

emergency:

Call the "Horseshoe" and state the following:

"I want to report a medical emergency."

JPMRADMIN A.4 RO

Page 4 of 8

ToolslEquipment/Procedures Needed:

Latest revision of EPIP-10

NOTE: START THIS JPM AT A LOCATION WHERE PERFORMER HAS ACCESS

TO PROCEDURES (Simulator, Main Control Room, TIC or provide

performer with procedure).

READ TO OPERATOR

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the administrative task to be

performed. I will provide initiating cues and reports on other actions when

directed by you. Ensure you indicate to me when you understand your assigned

task. To indicate that you have completed your assigned task return the handout

sheet I provided you.

INITIAL CONDITIONS:

You are the Control Room Operator (CRO) on shift.

You have received a telephone call reporting an onsite medical emergency.

INITIATING CUES:

0 Respond to the medical emergency in accordance with EPIP-IO.

JPMRADMIN A.4 RO

Page 5 of 8

START TIME:

STEP 1: Obtain a copy of the instruction.

SAT

STANDARD: A copy of EPIP-10 has been obtained.

EXAMINER'S CUE: After the performer locates and obtains correct

instruction, the evaluator can provide a copy of the UNSAT

instruction.

COMMENTS:

NOTE TO EVALUATOR: The following steps are from EPIP-10,

Appendix A

I

STEP 2: [Step A] Obtain NAME of caller.

STANDARD: CRO requests name of caller and records on Appendix A. SAT

CUE: State to the performer that your name is John Doe.

UNSAT

COMMENTS:

JPMRADMIN AA RO

Page 6 of 8

STEP 3: [Step B] LOCATION of caller.

STANDARD: Performer requests the location of the caller and records on SAT

Appendix A.

CUE: State to the performer that you are just south of the station

air compressors on elevation 685' in the Turbine Building. UNSAT

COMMENTS:

STEP 4: [Step C] Type of Medical Emergency.

STANDARD: Performer requests the type of Medical Emergency and SAT

records on Appendix A.

CUE: State to the performer that you found a male victim lying

on the floor unconscious but has heartbeat and is. UNSAT

breathing.

COMMENTS:

4-

STEP 5: [Step D] Number of personnel Involved.

STANDARD: Performer requests how many people involved and records on SAT

Appendix A.

CUE: State to the performer: "no other individuals are involved".

UNSAT

COMMENTS:

JPMRADMIN A.4 RO

Page 7 of 8

STEP 6: [Step E] Immediate Area Hazards (Radiological, Safety).

STANDARD: Requests if immediate hazards exist and records on SAT

Appendix A.

CUE: State to the performer: "no hazards exist in the area".

UNSAT

COMMENTS:

-I-

STEP 7: [Step F] Telephone number of the caller.

STANDARD: Request the telephone number of the caller and records on SAT

Appendix A.

CUE: State to the performer that the phone number of the phone

you are calling from is 5555. UNSAT

COMMENTS:

1-

STEP 8: [Step G] ALERT and DISPATCH MERT PERSONNEL

STANDARD: Performer alerts and dispatches MERT personnel. SAT

CUE: As MERT personnel, acknowledge performer's

communication.

UNSAT

COMMENTS:

JPMRADMIN A.4 RO

P$n Rnf $R

Piap A nf

STEP 9: [Step H] Make the following plant announcement with public

address:

"ATTENTION ALL SITE PERSONNEL."

"ATTENTION ALL SITE PERSONNEL."

"A MEDICAL emergency has been reported. The MERT is

to ACTIVATE and RESPOND to the following LOCATION:

STANDARD: Performer makes public address announcement and has

MERT respond to Turbine Building elevation 685', just south of

the station air compressors.

EXAMINER'S CUE: If NOT being performed on the simulator, do NOT

allow performer to actually perform this announcement.

Ensure it is simulated.

COMMENTS:

-4

STEP 10: [Step I] CONFIRM that the Shift Manager (SM) has been notified.

STANDARD: Performer ensures the SM has been notified. (may make

phone call or announce to the control crew that a medical

emergency is in progress)

    • CUE: Acknowledge report as Shift Manager.

COMMENTS:

JPMRADMIN A.4 RO

P~qn-icP n-f A~

STEP 11: [Step J] CONFIRM that the Fire Protection Section Duty Shift

Supervisor (Fire Brigade Leader) was notified by:

Radio or

Telephone (extension 3311 or 3355) or __SAT

Pocket Pager 40566

UNSAT

STANDARD: Performer ensures the Fire Protection Section Duty Shift

Supervisor was notified by either radio, telephone, or pocket

pager.

EXAMINER'S CUE: Do NOT allow performer to actually perform this

notification. Ensure it is simulated.

CUE: Acknowledge report as Fire Protection Section Duty Shift

Supervisor.

COMMENTS:

I.-

STEP 12: [Step K] CONFIRM/COORDINATE MERT response (via radio or

phone) until Incident Commander assumes control.

STANDARD: Performer confirms/coordinate the MERT response until the

Incident Commander assumes control.

CUE: As Incident Commander, notify the performer that you

have assumed control of the emergency. We will stop

here.

COMMENTS:

END OF TASK I_________________________

TIME STOP:

Page 10 of 8

APPLICANT CUE SHEET

(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the administrative task to be

performed. I will provide initiating cues and reports on other actions when

directed by you. Ensure you indicate to me when you understand your assigned

task. To indicate that you have completed your assigned task return the handout

sheet I provided you.

INITIAL CONDITIONS:

You are the Control Room Operator (CRO) on shift.

You have received a telephone call reporting an onsite medical emergency.

INITIATING CUES:

0 Respond to the medical emergency in accordance with EPIP-10.

Admin A.4/Scenario 2

Page 1 of 20

REGION II

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

Admin A.4/Scenario 2

Classify The Event Per The REP (Cold Leg LOCA)

APPLICANT

EXAMINER

Admin A.4/Scenario 2

Page 2 of 20

REGION II

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

Task: Classify The Event Per The REP (Cold Leg LOCA)

Alternate Path: N/A

Facility JPM #: New

K/A Rating(s): 2.4.38 [2.2/4.0]

Task Standard: The event is classified as an ALERT based on EAL 1.2.2, "RCS Leakage/LOCA"

Notifications are made per EPIP-3.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator X In-Plant Perform X Simulate

References: EPIP-1 "Emergency Plan Classification Flowpath", Rev. 15; EPIP-3 "ALERT", Rev. 16

Task Number: SRO-113-EPIP-001 APPLICABLE FOR: SRO

IOCFR55.45: 11

Validation Time: 20 min. Time Critical: No

Applicant: Time Start:

NAME SSN Time Finish:

Performance Rating: SAT UNSAT Performance Time

Examiner: /

NAME SIGNATURE DATE

COMMENTS

Admin A.4fScenario 2

Page 3 of 20

SIMULATOR OPERATOR INSTRUCTIONS:

1. This JPM will commence from the point where simulator is frozen at the end of

simulator exam scenario 2.

SIMULATOR OPERATOR INSTRUCTIONS:

1. Obtain copy of EPIP-3 to facilitate role plays for contacts made by the performer.

2. Performer must use NRC ring down phone.

Admin A.4lScenado 2

Page 4 of 20

ToolslEquipment/Procedures Needed:

Ensure clean copy of EPIP-3 in all copies of Emergency Instructions on the Simulator

Floor and in the file drawer of Unit Supervisor's desk..

READ TO OPERATOR

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control

room steps shall be performed for this JPM, including any required

communications. I will provide initiating cues and reports on other actions when

directed by you. Ensure you indicate to me when you understand your assigned

task. To indicate that you have completed your assigned task return the handout

sheet I provided you.

INITIAL CONDITIONS:

Simulator represents the current plant conditions.

Simulator operation is frozen.

INITIATING CUES:

Using the current conditions, make the initial classification of the event per the

REP and make the required notifications.

Z Iiuvi // I

Admin A.4/Scenario 2

Page 5 of 20

EXAMINER NOTE: This handout sheet and accompanying equation sheet is to be used

after JPM Step 18. Provide applicant with both sheets.

READ TO OPERATOR

NEW CONDITIONS:

"* A breech of containment has occurred resulting in a rapid reduction of

containment pressure to approximately atmospheric pressure.

"* Incore thermocouples indicate 850'F Hi quadrant average

"* RVLIS Level is 60%

"* A radiological field team reported that measured external dose at 7 miles

from the plant is 200 mr/hr.

A General Emergency has been declared.

INITIATING CUES:

Make the Protective Action Recommendations for this declaration. When

determining 2 and 5 mile dose rates, assume that these readings are measured

from a point source at the plant. (Ignore all atmospheric conditions that would

affect measurements)

Admin A.4/Scenario 2

Page 6 of 20

START TIME:

STEP 1: Refers to EPIP-1 to determine level of event. CRITICAL

STEP

STANDARD: Performer refers to EPIP-1 and declares an ALERT based

on EAL 1.2.2, "RCS Leakage/LOCA". This must be

completed within 15 minutes of task assignment. SAT

This step is critical to ensure proper activation of TVA

resources for event in progress.

UNSAT

3OMMENTS: RECORD time that declaration was made:

STEP 2: Implements EPIP-3, ALERT

SAT

STANDARD: EPIP-3, ALERT, is implemented.

COMMENTS: UNSAT

"**Italicized Cues Are To Be Used Only If JPM PerformanceIs Being Simulated.

Admin A.4lScenario 2

Panae 7 of 2n1

Prw 7 nf 2fl

STEP 3: [STEP 1] DIRECT Shift Personnel to activate the CRITICAL

Emergency Paging System (EPS) to staff the TSC and STEP

Operations Support Center (OSC). Shift Personnel should

confirm activation and provide the 20 minute printed report __SAT

to the SM for review.

STANDARD: Shift personnel is notified to activate the emergency paging UNSAT

system (EPS) to staff the TSC and Operations Support

Center (OSC) or EPS is activated in the control room.

This step is critical to ensure proper activation of TVA

resources for event in progress.

    • CUE: After the shift personnel is notified, acknowledge the

request to activate the Emergency Paging System.

COMMENTS:

NOTE I IF the EPS system fails, call the ODS (5-751-1700) and have

him activate the EPS.

NOTE 2 IF the above methods of activating the EPS fail, the Shift

Personnel must use the Radiological Emergency Response

Call Lists to staff the TSC and OSC. This list is located in

the EPS Manual near the terminal.

STEP 4: [STEP 2] COMPLETE Appendix A, Notification

Information.

SAT

STANDARD: Appendix A is accurately completed.

COMMENTS: UNSAT

"*ItalicizedCues Are To Be Used Only if JPM PerformanceIs Being Simulated.

Admin A.4/Scenario 2

Page 8 of 20

STEP 5: [STEP 3] ANNOUNCE to the crew: "An Alert is being CRITICAL

STEP

declared based on EAL 1.2.2, "RCS Leakage/LOCA." I will

be the Site Emergency Director."

SAT

STANDARD: The above announcement is made to the crew. Wording

describing the event may vary. This must be completed

within 15 minutes of task assignment. UNSAT

Step is critical to alert crew to the declaration of the

ALERT.

    • CUE: After the crew is notified, acknowledge the report.

COMMENTS: RECORD time that declaration was made:

t

STEP 6: [STEP 4] NOTIFY the ODS direct by ODS Ringdown or CRITICAL

STEP

No. 5-751-1700 or 5-751-2495 and PROVIDE the

information from Appendix A. If the ODS cannot be SAT

contacted within 10 minutes, the Tennessee Emergency

Management Agency is to be notified of the Radiological

Emergency Plan activation by calling 9-1-800-262-3300 or

9-1-615-741-0001 or 9-1-800-262-3400. UNSAT

STANDARD: The ODS is notified and provided the information on

Appendix A. This notification must be made within 5

minutes of event declaration.

Step is critical to ensure timely staffing of CECC.

EVALUATOR NOTE: DO NOT allow actual call to ODS. Ensure call is

to simulator instructor.

    • CUE: (Booth Operator) Role play the ODS and repeat back

the report.

COMMENTS: RECORD time that ODS was notified:

"**ItalicizedCues Are To Be Used Only If JPM PerformanceIs Being Simulated.

Admin A.4/Scenario 2

Page 9 of 20

STEP 7: [STEP 5] FAX Appendix A to the ODS.(No. pre

programmed or 5-751-8620.)

SAT

STANDARD: Appendix A is placed in the fax machine and transmission

simulated.

UNSAT

    • CUE: Do NOT allow fax to be transmitted.

COMMENTS:

i

STEP 8: [STEP 6] ANNOUNCE to the plant: "ATTENTION ALL CRITICAL

STEP

SITE PERSONNEL. ATTENTION ALL SITE PERSONNEL.

AN ALERT emergency has been declared based on EAL

Staff the TSC and OSC. SAT

1.2.2, "RCS Leakage/LOCA."

(Repeat)

STANDARD: A public address announcement for Plant Emergency

UNSAT

Response Personnel to staff the TSC and OSC is made

over the plant paging system. Wording describing the event

may vary.

Step is critical to alert all plant personnel of the REP

declaration and instructions staffing TSC and OSC.

COMMENTS:

    • Italicized Cues Are To Be Used Only If JPM PerformanceIs Being Simulated.

Admin A.4/Scenario 2

Page 10 of 20

STEP 9: [STEP 7] EVALUATE plant conditions, and IF conditions

warrant, INITIATE assembly and accountability by

completing steps 8 and 9. (For additional details, go to

WBN EPIP-8, "Personnel Accountability and Evacuation"). SAT

IF you are not going to initiate assembly and accountability,

GO TO step 10.

STANDARD: Performer decides whether conditions warrant initiating UNSAT

assembly and accountability or whether the conditions do

NOT warrant assembly and accountability. If the decision

is that conditions do then the performer proceeds to

step 8 (JPM STEP 10). If the decision is that conditions

do NOT then the performer goes to the step 10 (JPM

STEP 14). Either is acceptable.

NOTE: Limited Area Evacuation per EPIP-8 App B may be

implemented and if so skip to procedure step 10 (JPM step

14).

COMMENTS:

EVALUATOR NOTE Steps 10, 11, and 12 are all part of the same

procedure step.

STEP 10: [STEP 8] NOTIFY Security (CAS) that assembly and CRITICAL

accountability is to be conducted. STEP

STANDARD: The performer notifies Security that assembly and

accountability is to be conducted. SAT

This step is critical to enable assembly card readers.

    • CUE: (Booth Operator) If RADCON is notified to implement UNSAT

EPIP-16, acknowledge the report.

COMMENTS:

"**ItalicizedCues Are To Be Used Only if JPM PerformanceIs Being Simulated.

Admin A.4/Scenario 2

Page 11 of 20

CAUTION If there is any possibility of a radiological release, do

not send personnel into areas of unknown radiological

conditions without first contacting Radiological Control

(RADCON).

EVALUATOR NOTE: Performance Steps 11, 12, and 13 will only be

critical if the decision was made to initiate

assembly & accountability.

EVALUATOR NOTE: Performance Steps 11, 12, and 13 are all part of

the same Procedure step.

STEP 11: [STEP 9] ANNOUNCE to the plant: "ATTENTION ALL CRITICAL

SITE PERSONNEL. ATTENTION ALL SITE PERSONNEL. STEP

Report to your assembly areas for accountability."

(Repeat) AND SAT

STANDARD: The above announcement is made for all site personnel to

report to their assembly areas for accountability.

UNSAT

Step is critical to alert all plant personnel of the

assembly & accountability instructions.

COMMENTS:

STEP 12: [STEP 9] ACTIVATE assembly alarm for personnel CRITICAL

assembly and accountability. STEP

STANDARD: The performer pushes assembly alarm "EVAC AUTO" or

"EVAC MANUAL" push button. __ SAT

This step is critical to activate assembly &

accountability alarm.

UNSAT

COMMENTS:

    • ItalicizedCues Are To Be Used Only If JPM PerformanceIs Being Simulated.

Admin A.4lScenario 2

Page 12 of 20

I

STEP 13: [STEP 9] INITIATE WBN EPIP-8, "Personnel CRITICAL

Accountability and Evacuation". STEP

STANDARD: The performer refers to EPIP-8, Appendix C, to determine

actions necessary for personnel accountability and SAT

evacuation.

This step is critical in that specific guidance is given

with regard to assembly & accountability.. UNSAT

    • CUE: After the performer has determined which sections of

EPIP-8 apply, direct him/her to return to EPIP-3 and

continue actions.

COMMENTS:

i

STEP 14: [STEP 10] CALL RADCON Lab and SAY: "We are in an CRITICAL

Alert, implement WBN EPIP-14, and CECC EPIP-9." STEP

STANDARD: The RADCON Lab is notified to implement WBN EPIP-14

and CECC EPIP-9. SAT

This step is critical to notify RADCON so proper

survey's, etc are implemented.

UNSAT

    • CUE: (Booth Operator) Acknowledge the request to

implement WBN EPIP-14 and CECC EPIP-9.

COMMENTS:

"**ItalicizedCues Are To Be Used Only If JPM PerformanceIs Being Simulated.

Admin A.4/Scenario 2

Page 13 of 20

STEP 15: [STEP 11] IF there are personnel injuries, IMPLEMENT

WBN EPIP-10, "Medical Emergency Response."

SAT

STANDARD: Performer determines that it is NOT necessary to

implement EPIP-10.

    • CUE: Inform the performer that there are NO personnel UNSAT

injuries.

COMMENTS:

I

STEP 16: [STEP 12] IF there is a security threat, IMPLEMENT WBN

EPIP-1 1, "Security and Access Control."

SAT

STANDARD: Performer determines that it is NOT necessary to

implement EPIP-1 1.

    • CUE: Inform the performer that there has been NO reports UNSAT

of a security threat

COMMENTS:

I____________________________

STEP 17: [STEP 13] NOTIFY Duty Plant Manager, and PROVIDE CRITICAL

Appendix A information (SEE duty list for telephone STEP

numbers). The Duty Plant Manager will call the Plant

Manager or his alternate.

SAT

STANDARD: Duty Plant Manager is provided the Appendix A information.

This step is critical as it alerts plant management to

REP activation. UNSAT

    • CUE: (Booth Operator) Role play as the Duty Plant Manager

and acknowledge the report.

COMMENTS:

-j.

"**Italicized Cues Are To Be Used Only If JPM PerformanceIs Being Simulated.

Admin A.4/Scenario 2

Page 14 of 20

I -

STEP 18: [STEP 14] EVALUATE the need to implement EPIP-16,

"Initial Dose Assessment for Radiological Emergencies," for

a dose projection if radioactivity is being released through

normal plant release paths. SAT

STANDARD: The performer determines whether or not EPIP-16 is to be

implemented. Either decision is acceptable.

UNSAT

    • CUE: (Booth Operator) If RADCON is notified to implement

EPIP-16, acknowledge the report.

COMMENTS:

NOTE NRC notification should be made as soon as I

practicable but within one hour of "Alert" declaration.

Whenever NRC requests, a qualified person must

provide a continuous update to NRC Operations

Center. The following commercial numbers are for the

NRC Operations Center.

9-1-301-816-5100 (MAIN)

9-1-301-951-0550 (BACKUP)

9-1-301-816-5151 (FAX)

EVALUATOR NOTE: DO NOT allow actual call to NRC.

Ensure call is to simulator instructor.

i

STEP 19: [STEP 15] NOTIFY the NRC, using designated NRC CRITICAL

phone (ENS), of plan activation. STEP

STANDARD: The NRC is notified of plan activation using designated

line. SAT

This step is critical as it alerts NRC to REP activation.

EVALUATOR NOTE: DO NOT allow actual call to NRC. Ensure call is UNSAT

to simulator instructor.

    • CUE: (Booth Operator) Role play the NRC and acknowledge

the report.

COMMENTS:

    • ltalicizedCues Are To Be Used Only If JPM PerformanceIs Being Simulated.

Admin A.4/Scenario 2

Page 15 of 20

STEP 20: [STEP 16] NOTIFY the NRC Resident Inspector by calling CRITICAL

1776 and PROVIDING the information on Appendix A. STEP

STANDARD: The NRC Resident Inspector is provided Appendix A SAT

information.

This step is critical as it alerts NRC to REP activation.

UNSAT

EVALUATOR NOTE: DO NOT allow actual call to NRC Resident.

Ensure call is to simulator instructor.

    • CUE: (Booth Operator) Role play the NRC Resident and

acknowledge the report.

COMMENTS:

EVALUATOR CUE: State to applicant that conditions have now

changed. A General Emergency has been

declared.

EVALUATOR CUE: Read and provide Applicant handout sheet

and equation sheet for PAR

recommendations.

STEP 21: Refers to EPIP-5 to Appendix B "Protective Action SAT

Recommendation Guidance.

STANDARD: Applicant obtains copy of EPIP-5 Appendix B. UNSAT

COMMENTS:

"**ltalicizedCues Are To Be Used Only If JPM PerformanceIs Being Simulated.

Admin A.4/Scenario 2

Page 16 of 20

STEP 22: General Emergency Declared. SAT

STANDARD: Applicant enters logic tree at top of page since general

emergency has been declared. (given in applicant's UNSAT

handout sheet.)

COMMENTS:

-I-

STEP 23: Is Projected or Measured Dose Greater Than or Equal to SAT

Table 1 Limits at or beyond 5 miles.

STANDARD: Applicant determines that measured external dose does UNSAT

NOT exceed table 1 limits, therefore applicant answers NO

to logic question and continues to the next decision block

on the PAR flowchart.

Applicant calculates dose at 5 miles using point source

equation:

11 (d)2 = 12 (d 2) 2

2

200mr./hr(7mi) = 12 (5mi)2

12 = 9800/25 = 392 mr/hr = 0.392 R/hr

(external dose rate at 5 miles)

COMMENTS:

"**Italicized Cues Are To Be Used Only If JPM PerformanceIs Being Simulated.

Admin A.4/Scenario 2

Page 17 of 20

STEP 24: Indications of Severe Core Damage Greater Than or Equal

to the Values in Table 2.

SAT

STANDARD: Applicant determines that a table 2 limit has been NOT

been exceeded, therefore applicant answers NO to logic

question and continues to the next decision block on the

PAR flowchart. UNSAT

COMMENTS:

I____________________________

STEP 25: Is there loss of Physical Control of the Facility.

STANDARD: Applicant determines that physical control of the facility has SAT

NOT been lost (security status from earlier has not

changed), therefore applicant answers NO to logic question

and continues to the next decision block on the PAR

flowchart. UNSAT

    • CUE: Inform the performer that there has been NO reports

of a security threat

COMMENTS:

I____________________________

"**ItalicizedCues Are To Be Used Only If JPM PerformanceIs Being Simulated.

Admin A.4/Scenario 2

Page 18 of 20

STEP 26: Is Projected or Measured Dose Greater Than or Equal to

Table 1 Limits at or beyond 2 miles. CRITICAL

STEP

STANDARD: Applicant determines that dose exceeds table 1 limits (1

REM/hr external dose) at 2 miles or beyond, therefore

applicant answers YES to logic question. Applicant then

determines that the logic indicates Recommendation 2 as

the Protective Action Recommendation.

Applicant calculates dose at,5'miles using point source

equation:

11(d1)2= 12 (d2 )2

200mr./hr(7mi)f = 12 (2mi)f

12 = 9800/4 = 2450 mr/hr = 2.45 R/hr

(external dose rate at 2 miles)

This step is critical for making the appropriate PAR to

the CECC.

    • CUE: Acknowledge report by the applicant

COMMENTS:

END OF TASK I

TIME STOP:

"**Italicized Cues Are To Be Used Only If JPM PerformanceIs Being Simulated.

Page 19 of 20

APPLICANT CUE SHEET

(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control

room steps shall be performed for this JPM, including any required

communications. I will provide initiating cues and reports on other actions when

directed by you. Ensure you indicate to me when you understand your assigned

task. To indicate that you have completed your assigned task return the handout

sheet I provided you.

INITIAL CONDITIONS:

Simulator represents the current plant conditions.

Simulator operation is frozen.

INITIATING CUES:

Using the current conditions, make the initial classification of the event per the

REP and make the required notifications.

Page 20 of 20

APPLICANT HANDOUT SHEET

(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

NEW CONDITIONS:

"* A breech of containment has occurred resulting in a rapid reduction of

containment pressure to approximately atmospheric pressure.

"* Incore thermocouples indicate 850°F Hi quadrant average

"* RVLIS Level is 60%

"* A radiological field team reported that measured external dose at 7 miles

from the plant is 200 mr/hr.

A General Emergency has been declared.

INITIATING CUES:

Make the Protective Action Recommendations for this declaration. When

determining 2 and 5 mile dose rates, assume that these readings are measured

from a point source at the plant. (Ignore all atmospheric conditions that would

affect measurements)

V VLCc p

EQUATIONS

  • = IiicpAT

Q =rhicpAh p = PoeU/

S

0=UAAT SCR= (1 - Keff)

6 P) CR 2

S 2 6 .0 (Xeff CR1 = (1- Keffl) = CR1

(B-p)

SUR M= (1- Kefn)

tu (1-

Keff2)

p p=(Kff

Keff - 1) Keff

SDM =

AK.ff

11(dl)= 12(d2)

P= -Keff

e* + (f-P) 11(dl) 2 12(d2) 2

1 X 10-4 seconds Wpump ffiAPv

Net Work (in)

(out)

keff =.01 seconds-1 Cycle Efficiency = Energy

CONVERSIONS

1 Curie = 3.7 x 1010 dps 1 kg = 2.21 Ibm

1 hp = 2.54 x 103 Btu/hr 1 MW = 3.41 x 106 Btu/hr

OF = 9/5 OC + 32

1 Btu = 778 ft-lbf

OC = 5/9 (OF - 32)

Admin A.4/Scenario 3

Page 1 of 16

REGION II

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

Admin A.4lScenario 3

Classify The Event Per The REP (Steam Line Break Inside

Containment)

APPLICANT

EXAMINER

Admin A.4fScenario 3

Page 2 of 16

REGION Ii

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

Task: Classify The Event Per The REP (Steam Line Break Inside Containment)

Alternate Path: N/A

Facility JPM #: New

K/A Rating(s): 2.4.38 [2.2/4.0]

Task Standard: The event is classified as an Unusual Event based on EAL 2.7 "Uncontrolled Cooldown."

Notifications are made per EPIP-2.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator X In-Plant Perform X Simulate

References: EPIP-1 "Emergency Plan Classification Flowpath", Rev. 15; EPIP-2 "Notification Of

Unusual Event", Rev. 13

Task Number: SRO-113-EPIP-001 APPLICABLE FOR: SRO

10CFR55.45: 11

Validation Time: 20 min. Time Critical: YES

Applicant: Time Start:

NAME SSN Time Finish:

Performance Rating: SAT. UNSAT Performance Time

Examiner: I

NAME SIGNATURE DATE

COMMENTS

Admin A.4/Scenario 3

Page 3 of 16

SIMULATOR OPERATOR INSTRUCTIONS:

1. This JPM will commence from the point where simulator is frozen at the end of

simulator exam scenario 3.

SIMULATOR OPERATOR INSTRUCTIONS:

1. Obtain copy of EPIP-2 to facilitate role plays for contacts made by the performer.

2. Performer must use NRC ring down phone.

Admin A.4/Scenario 3

Page 4 of 16

Needed:

ToolslEquipment/Procedures

Ensure clean copy of EPIP-2 in all copies of Emergency Instructions on the Simulator

Floor and in the file drawer of Unit Supervisor's desk.

READ TO OPERATOR

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control

room steps shall be performed for this JPM, including any required

communications. I will provide initiating cues and reports on other actions when

directed by you. Ensure you indicate to me when you understand your assigned

task. To indicate that you have completed your assigned task return the handout

sheet I provided you.

INITIAL CONDITIONS:

Simulator represents the current plant conditions.

Simulator operation is frozen.

INITIATING CUES:

Using the current conditions, make the initial classification of the event per the

REP and make the required notifications.

THIS IS A TIME CRITICAL TASK

Admin A.4/Scenario 3

Page 5 of 16

EXAMINER NOTE: This handout sheet and accompanying equation sheet is to be used

after JPM Step 18. Provide applicant with both sheets.

READ TO OPERATOR

NEW CONDITIONS:

A LOCA occurs from present conditions resulting in the following:

"* CNTMT pressure 7.0 psig with NO CNTMT Spray Pumps running.

"* RVLIS Level 17% and stable.

"* Core Cooling RED path.

"* A radiological field team reported that measured external dose at 7 miles

from the plant is 10 mr/hr.

A General Emergency has been declared.

INITIATING CUES:

Make the Protective Action Recommendations for this declaration. When

determining 2 and 5 mile dose rates, assume that these readings are measured

from a point source at the plant. (Ignore all atmospheric conditions that would

affect measurements)

Admin A.4/Scenario 3

Page 6 of 16

START TIME:

STEP 1: Refers to EPIP-1 to determine level of event. CRITICAL

STEP

STANDARD: Performer refers to EPIP-1 and declares an Notification Of

Unusual Event based on EAL 2.7 "Uncontrolled Cooldown."

This must be completed within 15 minutes of task SAT

assignment.

This step is critical to ensure proper activation of TVA

resources for event in progress. UNSAT

3OMMENTS: RECORD time that declaration was made:

I

STEP 2: Implements EPIP-2, Notification Of Unusual Event

SAT

STANDARD: EPIP-2, Notification Of Unusual Event, is implemented.

COMMENTS: UNSAT

STEP 15: [STEP 1] IF there are personnel injuries, IMPLEMENT

WBN EPIP-10, "Medical Emergency Response."

SAT

STANDARD: Performer determines that it is NOT necessary to

implement EPIP-10.

    • CUE: Inform the performer that there are NO personnel UNSAT

injuries.

COMMENTS:

"**ItalicizedCues Are To Be Used Only If JPM PerformanceIs Being Simulated.

Admin A.4/Scenario 3

Page 7 of 16

STEP 4: [STEP 2] COMPLETE Appendix A, Notification

Information.

SAT

STANDARD: Appendix A is accurately completed.

COMMENTS: UNSAT

a-

STEP 5: [STEP 3] ANNOUNCE to the crew: "An Notification of CRITICAL

Unusual Event is being declared based on EAL 2.7 STEP

"Uncontrolled Cooldown." I will be the Site Emergency

Director." SAT

STANDARD: The above announcement is made to the crew. Wording

describing the event may vary. This must be completed

within 15 minutes of task assignment. UNSAT

Step is critical to alert crew to the declaration of the

Notification of Unusual Event.

    • CUE: After the crew is notified, acknowledge the report.

COMMENTS: RECORD time that declaration was made:

I_____________

"**ItalicizedCues Are To Be Used Only If JPM PerformanceIs Being Simulated.

Admin A.4/Scenario 3

Page 8 of 16

STEP 6: [STEP 4] NOTIFY the ODS direct by ODS Ringdown or CRITICAL

No. 5-751-1700 or 5-751-2495 and PROVIDE the STEP

information from Appendix A. If the ODS cannot be

contacted within 10 minutes, the Tennessee Emergency SAT

Management Agency is to be notified of the Radiological

Emergency Plan activation by calling 9-1-800-262-3300 or

9-1-615-741-0001 or 9-1-800-262-3400.

UNSAT

STANDARD: The ODS is notified and provided the information on

Appendix A. This notification must be made within 5

minutes of event declaration.

Step is critical to ensure timely staffing of CECC.

EVALUATOR NOTE: DO NOT allow actual call to ODS. Ensure call is

to simulator instructor

    • CUE: (Booth Operator) Role play the ODS and repeat back

the report.

COMMENTS: RECORD time that ODS was notified:

STEP 7: [STEP 5] FAX Appendix A to the ODS.(No. pre

programmed or 5-751-8620.)

SAT

STANDARD: Appendix A is placed in the fax machine and transmission

simulated.

    • CUE: Do NOT allow fax to be transmitted. UNSAT

COMMENTS:

"**Italicized Cues Are To Be Used Only If JPM PerformanceIs Being Simulated.

Admin A.4/Scenario 3

Page 9 of 16

STEP 8: [STEP 6] ANNOUNCE to the plant: "ATTENTION ALL CRITICAL

SITE PERSONNEL. ATTENTION ALL SITE PERSONNEL. STEP

A Notification of Unusual Event is being declared based on

EAL 2.7 "Uncontrolled Cooldown." (Repeat) SAT

STANDARD: A public address announcement for Notification of Unusual

Event. Wording describing the event may vary.

UNSAT

Step is critical to alert all plant personnel of the REP

declaration.

COMMENTS:

STEP 9: [STEP 7] NOTIFY Duty Plant Manager, and PROVIDE CRITICAL

Appendix A information (SEE duty list for telephone STEP

numbers). The Duty Plant Manager will call the Plant

Manager or his alternate.

SAT

STANDARD: Duty Plant Manager is provided the Appendix A information.

This step is critical as it alerts plant management to

REP activation. UNSAT

    • CUE: (Booth Operator) Role play as the Duty Plant Manager

and acknowledge the report.

COMMENTS:

"**ItalicizedCues Are To Be Used Only If JPM PerformanceIs Being Simulated.

Admin A.4/Scenario 3

Page 10 of 16

NOTE If the EPS system fails, call the ODS ringdown or (5

751-1700) and have him activate the EPS.

STEP 10: [STEP 8] IF TSC and OSC support is needed, ACTIVATE CRITICAL

the emergency system paging (EPS). STEP

STANDARD: Performer contacts shift personnel to activate EPS or EPS

is activated in the control room, or performer decides NOT SAT

to staff the TSC/OSC at this time.

This step is critical to ensure proper activation of TVA

resources for event in progress. UNSAT

    • CUE: After the shift personnel is notified, acknowledge the

request to activate the Emergency Paging System.

COMMENTS:

"**ltalicized Cues Are To Be Used Only If JPM PerformanceIs Being Simulated.

Admin A.4/Scenario 3

Page I1I of 16

of 16 3

NOTE NOTENRC notification should be made as soon as practicable but Page 11A.41Scenario

Admin

within one hour of "NOTIFICATION OF UNUSUAL EVENT"

declaration. Whenever NRC requests, a qualified person

must provide a continuous update to NRC Operations Center.

The following commercial numbers are for the NRC

Operations Center

9-1-301-816-5100 (MAIN)

9-1-301-951-0550 (BACKUP)

9-1-301-816-5151 (FAX)

EVALUATOR NOTE: DO NOT allow actual call to NRC.

Ensure call is to simulator instructor.

STEP 11: [STEP 9] NOTIFY the NRC, using designated NRC phone CRITICAL

(ENS), of plan activation. STEP

STANDARD: The NRC is notified of plan activation using designated

line. SAT

This step is critical as it alerts NRC to REP activation.

EVALUATOR NOTE: DO NOT allow actual call to NRC. Ensure call is UNSAT

to simulator instructor.

    • CUE: (Booth Operator) Role play the NRC and acknowledge

the report.

COMMENTS:

I

STEP 12: [STEP 10] EVALUATE the need to implement EPIP-16,

"Initial Dose Assessment for Radiological Emergencies," for

a dose projection if radioactivity is being released through

normal plant release paths. SAT

STANDARD: The performer determines whether or not EPIP-16 is to be

implemented. Either decision is acceptable.

UNSAT

    • CUE: (Booth Operator) If RADCON is notified to implement

EPIP-16, acknowledge the report.

COMMENTS:

"*ItalicizedCues Are To Be Used Only If JPM PerformanceIs Being Simulated.

Admin A.4/Scenario 3

Page 12 of 16

STEP 13: [STEP 11] NOTIFY WBN Emergency Preparedness. SAT

NOTE Notification to Emergency Preparedness should be made

as soon as practicable, but only when notification does not

interfere with emergency actions or notifications in UNSAT

progress.

Work - 3232 or Work - 8004

Home - 9-1-423-337-2911 Home -9-1-423-842-3020

Pager - 30374 Pager - 30388

STANDARD: WBN Emergency Preparedness is notified of plan

activation.

EVALUATOR NOTE: DO NOT allow actual call to WBN Emergency

Preparedness. Ensure call is to simulator

instructor.

    • CUE: (Booth Operator) Role play as WBN Emergency

Preparedness and acknowledge the report.

COMMENTS:

EVALUATOR CUE: State to applicant that conditions have now

changed. A General Emergency has been

declared.

EVALUATOR CUE: Read and provide Applicant handout sheet

and equation sheet for PAR

recommendations.

STEP 14: Refers to EPIP-5 to Appendix B "Protective Action SAT

Recommendation Guidance.

STANDARD: Applicant obtains copy of EPIP-5 Appendix B. UNSAT

COMMENTS:

    • ItalicizedCues Are To Be Used Only If JPM PerformanceIs Being Simulated.

Admin A.4/Scenario 3

Page 13 of 16

STEP 15: General Emergency Declared. SAT

STANDARD: Applicant enters logic tree at top of page since general

emergency has been declared. (given in applicant's UNSAT

handout sheet.

COMMENTS:

STEP 16: Is Projected or Measured Dose Greater Than or Equal to SAT

Table 1 Limits at or beyond 5 miles.

STANDARD: Applicant determines that measured external dose does UNSAT

NOT exceed table 1 limits, therefore applicant answers NO

to logic question and continues to the next decision block

on the PAR flowchart.

Applicant calculates dose at 5 miles using point source.

equation:

11(d1)2 = 12 (d2 )2

10mr./hr(7mi)2 = 12 (5mi)2

12 = 490/25 = 19.6 mr/hr = 0.0196 R/hr

(external dose rate at 5 miles)

COMMENTS:

    • Italicized Cues Are To Be Used Only If JPM PerformanceIs Being Simulated.

Admin A.4/Scenario 3

Page 14 of 16

STEP 17: Indications of Severe Core Damage Greater Than or Equal

to the Values in Table 2. CRITICAL

STEP

STANDARD: Applicant determines that a table 2 limit has been exceeded

(Inadequate Core Cooling as indicated by "red" path from

core cooling status trees), answer is YES to the logic SAT

question. Applicant then determines that the logic indicates

Recommendation 2 as the Protective Action

Recommendation.

UNSAT

This step is critical for making the appropriate PAR to

the CECC.

    • CUE: Acknowledge report by the applicant

COMMENTS:

END OF TASK I____________________________

TIME STOP:

"**Italicized Cues Are To Be Used Only If JPM PerformanceIs Being Simulated.

Page 15 of 16

APPLICANT CUE SHEET

(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control

room steps shall be performed for this JPM, including any required

communications. I will provide initiating cues and reports on other actions when

directed by you. Ensure you indicate to me when you understand your assigned

task. To indicate that you have completed your assigned task return the handout

sheet I provided you.

INITIAL CONDITIONS:

Simulator represents the current plant conditions.

Simulator operation is frozen.

INITIATING CUES:

Using the current conditions, make the initial classification of the event per the

REP and make the required notifications.

THIS IS A TIME CRITICAL TASK

Page 16 of 16

APPLICANT HANDOUT SHEET

(TO BE RETURNED TO EXAMINER UPON COMPLETION

OF TASK)

NEW CONDITIONS:

A LOCA occurs from present conditions resulting in the

following:

"* CNTMT pressure 7.0 psig with NO CNTMT Spray Pumps

running.

"* RVLIS Level 17% and stable.

"* Core Cooling RED path.

"* A radiological field team reported that measured external

dose at 7 miles

from the plant is 10 mr/hr.

A General Emergency has been declared.

INITIATING CUES:

Make the Protective Action Recommendations for this declaration.

When

determining 2 and 5 mile dose rates, assume that these

readings are measured

from a point source at the plant. (Ignore all atmospheric

conditions that would

affect measurements)

EQUATIONS

(*= iCpAT P =PO 10 SUR(t)

0Q= licpAh p = poe0

S

  • =UAAT SCR= ((I - KMf

p) CRI = (I1-Kerni) = CR2

SUR =26.06(Xeff CR1

(U-p)

26.06 M= (1- KM)

SU= R

(1- Keff)

Keff

Keff

AKff

P - Keff 11(dl)= 12(d 2)

2

( P)] Ii(dl)

2 =I 2 (d 2 )

p" - XeffP

1 x 10-4 seconds *pump= riAPv

Net Work (out)

ý,eff =.01 seconds-1 Cycle Efficiency =

Energy (in)

CONVERSIONS

1 Curie = 3.7 x 1010 dps 1 kg = 2.21 Ibm

1 hp = 2.54 x 103 Btu/hr 1 MW = 3.41 xl06Btu/hr

OF = 9/5 °C + 32

1 Btu = 778 ft-lbf

°C = 5/9 (OF - 32)

Admin A.4/Scenario 1

Page 1 of 18

REGION II

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

Admin A.4 /Scenario 1

Classify The Event Per The REP (SGTR With Ruptured SG

Faulted Outside Containment)

APPLICANT

EXAMINER

Admin A.4lScenario 1

Page 2 of 18

REGION II

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

Task: Classify The Event Per The REP (SGTR With Ruptured SG Faulted Outside Containment)

Alternate Path: N/A

Facility JPM #: New

K/A Rating(s): 2.4.38 [2.2/4.0] 2.4.30 [2.2/3.6]

Task Standard: The event is classified as an SITE AREA EMERGENCY based on EAL 1.2.3 "Steam Generator

Tube Rupture" and EAL 1.3.4 "Containment Bypass." Notifications are made per EPIP-4.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator X In-Plant Perform X Simulate

References: EPIP-1 "Emergency Plan Classification Flowpath", Rev. 15; EPIP-4 "SITE AREA

EMERGENCY", Rev. 17

Task Number: SRO-113-EPIP-001 APPLICABLE FOR: SRO

10CFR55.45: 11

Validation Time: 22 min. Time Critical: Yes

Applicant: Time Start:

NAME SSN Time Finish:

Performance Rating: SAT_ UNSAT Performance Time

Examiner: /

NAME SIGNATURE DATE

COMMENTS

Admin A.4/Scenario 1

Page 3 of 18

SIMULATOR OPERATOR INSTRUCTIONS:

1. This JPM will commence from the point where simulator is frozen at the end of

simulator exam scenario 1

SIMULATOR OPERATOR INSTRUCTIONS:

1. Obtain copy of EPIP-4 to facilitate role plays for contacts made by the performer.

2. Performer must use NRC ring down phone.

Admin A.4/Scenario 1

Page 4 of 18

ToolslEquipmentlProcedures Needed:

Ensure clean copy of EPIP-4 in all copies of Emergency Instructions on the Simulator

Floor and in the file drawer of Unit Supervisor's desk..

READ TO OPERATOR

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control

room steps shall be performed for this JPM, including any required

communications. I will provide initiating cues and reports on other actions when

directed by you. Ensure you indicate to me when you understand your assigned

task. To indicate that you have completed your assigned task return the handout

sheet I provided you.

INITIAL CONDITIONS:

Simulator represents the current plant conditions.

Simulator operation is frozen.

INITIATING CUES:

Using the current conditions, make the initial classification of the event per the

REP and make the required notifications.

THIS IS A TIME CRITICAL TASK

Admin A.4/Scenario 1

Page 5 of 18

EXAMINER NOTE: This handout sheet and accompanying equation sheet is to be used

after JPM Step 18. Provide applicant with both sheets.

READ TO OPERATOR

NEW CONDITIONS:

"* Chemistry reported RCS activity is now 350 pcilgm dose equivalent Iodine

131

"* A radiological field team reported that measured external dose at 7 miles

from the plant is 800 mr/hr.

A General Emergency has been declared.

INITIATING CUES:

Make the Protective Action Recommendations for this declaration. When

determining 2 and 5 mile dose rates, assume that these readings are measured

from a point source at the plant. (Ignore all atmospheric conditions that would

affect measurements)

"**ItalicizedCues Are To Be Used Only If JPM PerformanceIs Being Simulated.

Admin A.4/Scenario 1

Page 6 of 18

START TIME:

I

STEP 1: Refers to EPIP-1 to determine level of event. CRITICAL

STEP

STANDARD: Performer refers to EPIP-1 and declares an SITE AREA

EMERGENCY based on EAL 1.2.3 "Steam Generator Tube SAT

Rupture" and EAL 1.3.4 "Containment Bypass." This must

be completed within 15 minutes of task assignment.

This step is critical to ensure proper activation of TVA

UNSAT

resources for event in progress.

COMMENTS: RECORD time that declaration was made:

STEP 2: Implements EPIP-4, SITE AREA EMERGENCY

SAT

STANDARD: EPIP-4, SITE AREA EMERGENCY, is implemented.

UNSAT

COMMENTS:

I

"**ItalicizedCues Are To Be Used Only if JPM PerformanceIs Being Simulated.

Admin A.4/Scenario 1

Page 7 of 18

CRITICAL

STEP 3: [STEP 1] DIRECT Shift Personnel to activate the CRITICAL

Emergency Paging System (EPS) to staff the TSC and STEP

Operations Support Center (OSC). Shift Personnel should

confirm activation and provide the 20 minute printed report SAT

to the SM for review.

STANDARD: Shift personnel is notified to activate the emergency paging

system (EPS) to staff the TSC and Operations Support UNSAT

Center (OSC) or EPS is activated in the control room.

This step is critical to ensure proper activation of TVA

resources for event in progress.

    • CUE: After the shift personnel is notified, acknowledge the

request to activate the Emergency Paging System.

COMMENTS:

NOTE 1 IF the EPS system fails, call the ODS (5-751-1700) and have

him activate the EPS.

NOTE 2 IF the above methods of activating the EPS fail, the Shift

Personnel must use the Radiological Emergency Response

Call Lists to staff the TSC and OSC. This list is located in

the EPS Manual near the terminal.

STEP 4: [STEP 2] COMPLETE Appendix A, Notification

Information.

SAT

STANDARD: Appendix A is accurately completed.

COMMENTS: UNSAT

    • Italicized Cues Are To Be Used Only If JPM PerformanceIs Being Simulated.

Admin A.4/Scenario 1

Page 8 of 18

STEP 5: [STEP 3] ANNOUNCE to the crew: "A SITE AREA CRITICAL

EMERGENCY is being declared based on EAL 1.2.3 STEP

"Steam Generator Tube Rupture" and EAL 1.3.4

"Containment Bypass.". I will be the Site Emergency SAT

Director, all support and job assignments must be

authorized through me."

STANDARD: The above announcement is made to the crew. Wording UNSAT

describing the event may vary. This must be completed

within 15 minutes of task assignment.

Step is critical to alert crew to the declaration of the

SITE AREA EMERGENCY and provide for tracking

personnel.

    • CUE: After the crew is notified, acknowledge the report.

COMMENTS: RECORD time that declaration was made:

"**ItalicizedCues Are To Be Used Only If JPM PerformanceIs Being Simulated.

Admin A.4/Scenario 1

Page 9 of 18

[STEP 4] NOTIFY the ODS direct by ODS Ringdown or CRITICAL

STEP 6: STEP

No. 5-751-1700 or 5-751-2495 and PROVIDE the

information from Appendix A. SAT

IF the ODS cannot be contacted within 10 minutes, then

directly notify Rhea County, Meigs County, McMinn

County, and the Tennessee Emergency Management UNSAT

Agency (TEMA) of the classification.

Rhea County EMA 9-775-2505 -. (TIME)

9-775-7828 __(TIME)

(Alternate)

9-1-423-334-3049 -(TIME)

Meigs County EMA

9-1-423-334-5268 -(TIME)

(Alternate)

9-1-423-744-2760 -(TIME)

McMinn County

9-1-423-744-2721 -(TIME)

(Alternate)

9-1-800-262-3300 __(TIME)

Tennessee EMA

9-1-615-741-0001 _ _(TIME)

(Alternate)

9-1-800-262-3400 -(TIME)

(Alternate)

STANDARD: The ODS is notified and provided the information on

Appendix A. This notification must be made within 5

minutes of event declaration.

Step is critical to ensure timely staffing of CECC and

notification of the appropriate state agencies.

EVALUATOR NOTE: DO NOT allow actual call to ODS. Ensure call is

to simulator instructor

    • CUE: (Booth Operator) Role play as the ODS and repeat

back the report.

COMMENTS: RECORD time that ODS was notified:

"**ItalicizedCues Are To Be Used Only If JPM PerformanceIs Being Simulated.

Admin A.4/Scenario 1

Page 10 of 18

STEP 7: [STEP 5] FAX Appendix A to the ODS. (No. pre

programmed or 5-751-8620.)

SAT

STANDARD: Appendix A is placed in the fax machine and transmission

simulated.

    • CUE: Do NOT allow fax to be transmitted. UNSAT

COMMENTS:

+

CAUTION If there is any possibility of a radiological release, do

not send personnel into areas of unknown radiological

conditions without first contacting Radiological Control

(RADCON).

STEP 8: [STEP 6] NOTIFY Security (CAS) that assembly and CRITICAL

STEP

accountability is to be conducted.

SAT

STANDARD: The performer notifies Security that assembly and

accountability is to be conducted.

This step is critical to ensure assembly card readers

UNSAT

are enabled.

    • CUE: (Booth Operator) Role play as the Security and repeat

back the report.

COMMENTS:

"**ItalicizedCues Are To Be Used Only If JPM PerformanceIs Being Simulated.

Admin A.4/Scenario 1

Page 11 of 18

of 18 1

EVALUATOR NOTE Steps 9, 10, and 11 are all part of the same Admin11A.4lScenario

Page

procedure step.

+

STEP 9: [STEP 7] ANNOUNCE to the plant: "ATTENTION ALL CRITICAL

SITE PERSONNEL. ATTENTION ALL SITE PERSONNEL. STEP

AN Site Area Emergency has been declared based on EAL

1.2.3 "Steam Generator Tube Rupture" and EAL 1.3.4 SAT

"Containment Bypass." All personnel report to your

assembly areas for accountability. Staff the TSC and OSC.

(Repeat)

UNSAT

STANDARD: A public address announcement for Plant Emergency

Response Personnel to staff the TSC and OSC is made

over the plant paging system. Wording describing the event

may vary.

Step is critical to alert all plant personnel of the REP

declaration and instructions staffing TSC and OSC and

alert all plant personnel to assembly areas for

accountability.

COMMENTS:

-I-

STEP 10: [STEP 7] SOUND assembly alarm AND CRITICAL

STEP

STANDARD: The performer pushes assembly alarm "EVAC AUTO" or

"EVAC MANUAL" push button.

SAT

This step is critical to activate assembly &

accountability alarm.

UNSAT

COMMENTS:

I ____________________________________

"**ltalicizedCues Are To Be Used Only If JPM PerformanceIs Being Simulated.

Admin A.4/Scenario 1

Page 12 of 18

STEP 11: [STEP 7] INITIATE WBN EPIP-8, "Personnel CRITICAL

Accountability and Evacuation". STEP

STANDARD: The performer refers to EPIP-8, Appendix C, to determine

actions necessary for personnel accountability and SAT

evacuation.

This step is critical in that specific guidance is given

with regard to assembly & accountability.. UNSAT

    • CUE: After the performer has determined which sections of

EPIP-8 apply, direct him/her to return to EPIP-4 and

continue actions.

COMMENTS:

STEP 12: [STEP 8] CALL RADCON Lab and SAY: "We are in a Site CRITICAL

Area Emergency, implement WBN EPIP-14, and CECC STEP

EPIP-9."

STANDARD: The RADCON Lab is notified to implement WBN EPIP-14 SAT

and CECC EPIP-9.

This step is critical to notify RADCON so proper

survey's, etc. are implemented. UNSAT

    • CUE: (Booth Operator) Acknowledge the request to

implement WBN EPIP-14 and CECC EPIP-9.

COMMENTS:

"**ItalicizedCues Are To Be Used Only If JPM PerformanceIs Being Simulated.

Admin A.4/Scenario 1

Page 13 of 18

STEP 13: [STEP 9] IF there are personnel injuries, IMPLEMENT

WBN EPIP-10, "Medical Emergency Response."

STANDARD: Performer determines that it is NOT necessary to SAT

implement EPIP-10.

    • CUE: Inform the performer that there are NO personnel

UNSAT

injuries.

COMMENTS:

i

STEP 14: [STEP 10] IF there is a security threat, IMPLEMENT WBN

EPIP-11, "Security and Access Control."

SAT

STANDARD: Performer determines that it is NOT necessary to

implement EPIP-1 1.

    • CUE: Inform the performer that there has been NO reports UNSAT

of a security threat

COMMENTS:

STEP 15: [STEP 11] NOTIFY Duty Plant Manager, and PROVIDE CRITICAL

Appendix A information (SEE duty list for telephone STEP

numbers). The Duty Plant Manager will call the Plant

Manager or alternate.

SAT

STANDARD: Duty Plant Manager is provided the Appendix A information.

This step is critical as it alerts plant management to

REP activation. UNSAT

    • CUE: (Booth Operator) Role play as the Duty Plant Manager

and acknowledge the report.

COMMENTS:

j _____________________

"**ltalicizedCues Are To Be Used Only If JPM PerformanceIs Being Simulated.

Admin A.4/Scenario 1

Page 14 of 18

STEP 16: [STEP 12] EVALUATE the need to implement EPIP-16,

"Initial Dose Assessment for Radiological Emergencies," for

a dose projection if radioactivity is being released through

normal plant release paths. SAT

STANDARD: The performer determines whether or not EPIP-16 is to be

implemented. Either decision is acceptable.

UNSAT

    • CUE: (Booth Operator) If RADCON is notified to implement

EPIP-16, acknowledge the report.

COMMENTS:

NOTE NRC notification should be made as soon as

practicable but within one hour of "SITE AREA

EMERGENCY" declaration. Whenever NRC requests, a

qualified person must provide a continuous update to

NRC Operations Center. The following commercial

numbers are for the NRC Operations Center.

9-1-301-816-5100 (MAIN)

9-1-301-951-0550 (BACKUP)

9-1-301-816-5151 (FAX)

EVALUATOR NOTE: DO NOT allow actual call to NRC. Ensure call is

to simulator instructor.

STEP 17: [STEP 13] NOTIFY the NRC, using designated NRC CRITICAL

phone (ENS), of plan activation. STEP

STANDARD: The NRC is notified of plan activation using designated

line. SAT

This step is critical as it alerts NRC to REP activation.

EVALUATOR NOTE: DO NOT allow actual call to NRC. Ensure call is UNSAT

to simulator instructor.

    • CUE: (Booth Operator) Role play the NRC and acknowledge

the report.

COMMENTS:

"Italicized Cues Are To Be Used Only If JPM PerformanceIs Being Simulated.

Admin A.4/Scenario 1

Page 15 of 18

STEP 18: [STEP 14] NOTIFY the NRC Resident Inspector by calling CRITICAL

1776 and PROVIDING the information on Appendix A. STEP

STANDARD: The NRC Resident Inspector is provided Appendix A SAT

information.

This step is critical as it alerts NRC to REP activation.

UNSAT

EVALUATOR NOTE: DO NOT allow actual call to NRC Resident.

Ensure call is to simulator instructor.

    • CUE: (Booth Operator) Role play the NRC Resident and

acknowledge the report.

COMMENTS:

EVALUATOR CUE: State to applicant that conditions have now

changed. A General Emergency has been

declared.

EVALUATOR CUE: Read and provide Applicant handout sheet

and equation sheet for PAR

recommendations.

STEP 19: Refers to EPIP-5 to Appendix B "Protective Action SAT

Recommendation Guidance.

STANDARD: Applicant obtains copy of EPIP-5 Appendix B. UNSAT

COMMENTS:

"**Italicized Cues Are To Be Used Only If JPM PerformanceIs Being Simulated.

Admin A.4/Scenario 1

Page 16 of 18

STEP 20: General Emergency Declarn..d. SAT

STANDARD: Applicant enters logic tree a t top of page since general

emergency has been declar ed. (given in applicant's UNSAT

handout sheet.

COMMENTS:

STEP 21: Is Projected or Measured Dose Greater Than or Equal to CRITICAL

Table 1 Limits at or beyond 5 miles. STEP

STANDARD: Applicant determines that dose exceeds table 1 limits (1 SAT

REM/hr external dose) at 5 miles or beyond, therefore

applicant answers YES to logic question. Applicant then

determines that the logic indicates Recommendation 1 as

the Protective Action Recommendation. UNSAT

Applicant calculates dose at 5 miles using point source

equation:

I1(d1 )2= 2(2)2 2

2

800mr./hr(7mi) = 12 (5mi)

12 = 39200/25 = 1568 mr/hr = 1.568 R/hr

(external dose rate at 5 miles)

This step is critical for making the appropriate PAR to

the CECC.

    • CUE: Acknowledge report by the applicant

COMMENTS:

END OF TASK

.1_____________________

TIME STOP:

"**ltalicized Cues Are To Be Used Only If JPM PerformanceIs Being Simulated.

Page 17 of 18

APPLICANT CUE SHEET

(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control

room steps shall be performed for this JPM, including any required

communications. I will provide initiating cues and reports on other actions when

directed by you. Ensure you indicate to me when you understand your assigned

task. To indicate that you have completed your assigned task return the handout

sheet I provided you.

INITIAL CONDITIONS:

Simulator represents the current plant conditions.

Simulator operation is frozen.

INITIATING CUES:

Using the current conditions, make the initial classification of the event per the

REP and make the required notifications.

THIS IS A TIME CRITICAL TASK

Page 18 of 18

APPLICANT HANDOUT SHEET

(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

NEW CONDITIONS:

"* Chemistry reported RCS activity is now 350 [tci/gm dose equivalent Iodine

131

"* A radiological field team reported that measured external dose at 7 miles

from the plant is 800 mr/hr.

A General Emergency has been declared.

INITIATING CUES:

Make the Protective Action Recommendations for this declaration. When

determining 2 and 5 mile dose rates, assume that these readings are measured

from a point source at the plant. (Ignore all atmospheric conditions that would

affect measurements)

EQUATIONS

0Q= ficpAT p = Pý 10 SUR(t)

Q = iicpAh p= = 0 e th

S

Q=UAAT SCR= (I1- Keff)

2 6 .0 6Qeff P) CR 2

SUR CR= (1-Keffl)- CR1

(H-p)

SR=26.06 M= (1- Keffi)

SUR= (Kefr2)

M(1-

p ( ,f- 1) (1- Keff)

Keff

=

Keff

AKff

P- Keff 11(dl)= 12 (d 2 )

S= + (1-p)1 I,(dj) 2 = 12(d2)

2

"P L keffpi

I X 10-4 seconds Wpump'= liiAPv

Net Work (out)

keff = .01 seconds' Cycle Efficiency = Energy (in)

CONVERSIONS

1 Curie = 3.7 x 1010 dps 1 kg = 2.21 Ibm

1 hp = 2.54 x 103 Btu/hr 1 MW = 3.41 x 106 Btu/hr

OF = 9/5 OC + 32

I Btu = 778 ft-lbf

°C = 5/9 (OF - 32)