ML010240521

From kanterella
Jump to navigation Jump to search
Init Exam 04/2000 Final RO and SRO Admin Jpms
ML010240521
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 04/24/2000
From:
NRC Region 4
To:
References
-RFPFR
Download: ML010240521 (47)


Text

JPM-ANO-2-JPM-NRC-STAFF02 PAGE 1 OF 6 ADMIN JOB PERFORMANCE MEASURE UNIT:

2 REV #:

000 DATE:

SYSTEM/DUTY AREA:

Conduct Of Operations TASK:

Determine NLO Fire Brigade Qualifications.

JTA#:

KA VALUE RO:

2.3 SRO:

3.4 KA

REFERENCE:

2.1.5 APPROVED FOR ADMINISTRATION TO:

RO:

X SRO:

TASK LOCATION:

INSIDE CR:

X OUTSIDE CR:

BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE:

Perform SIMULATOR:

Perform LAB:

POSITION EVALUATED:

RO:

SRO:

ACTUAL TESTING ENVIRONMENT:

SIMULATOR:

PLANT SITE:

LAB:

TESTING METHOD:

SIMULATE:

PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES:

10 Minutes REFERENCE(S):

1015.001, Conduct of Operation, Rev 052-00-0, 1063.020, Fire Brigade Training, Rev 013-00-0, 2OPD014, Fire Brigade Eligibility Memo EXAMINEE'S NAME:

SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY:

UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED:

DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

JPM-ANO-2-JPM-NRC-STAFF02 PAGE 2 OF 6 ADMIN JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS:

Mode 1 Full Power. Shift turnover just completed.

TASK STANDARD:

Candidate determines Danny Reed is qualified as Fire Brigade Leader and Jeff Melvin is not qualified as Fire Brigade member.

TASK PERFORMANCE AIDS:

1015.001, Conduct of Operation, Rev 052-00-0, 1063.020, Fire Brigade Training, Rev 013-00-0, 2OPD014, Fire Brigade Eligibility Memo EXAMINER'S NOTE:

JPM-ANO-2-JPM-NRC-STAFF02 PAGE 3 OF 6 ADMIN JOB PERFORMANCE MEASURE INITIATING CUE:

You are the oncoming CBOT performing step V.1 of the Shift Turnover Checklist. Using appropriate references, determine that the following NLOs assigned to your operating crew are qualified for assignment as fire brigade members. (Include checking actual dates of respirator qualifications/physicals, Fire Brigade Training and Qualification, Fire Brigade Leader Training & Qualifications.)

Danny Reed, Fire Brigade Leader Jeff Melvin, Fire Brigade Member CRITICAL ELEMENTS (C): 14, 20, 27 PERFORMANCE CHECKLIST STANDARDS (Circle One)

EXAMINERS NOTE Examinee will be given a copy of the 1.

Obtain Fire Brigade Eligibility Memo.

Obtained Fire Brigade Eligibility Memo.

N/A SAT UNSAT 2.

Locate Eligibility Sheet for Danny Reed in Fire Brigade Quarterly Memo.

Located Eligibility Sheet for Danny Reed in Fire Brigade Quarterly Memo.

N/A SAT UNSAT 3.

Check Fire Brigade Leadership training completed.

Checked Fire Brigade Leadership training completed.

N/A SAT UNSAT 4.

Check respirator physical expiration date against current date.

Checked respirator physical expiration date against current date.

N/A SAT UNSAT 5.

Determine respirator physical qualification is satisfactory.

Determined respirator physical qualification is satisfactory.

N/A SAT UNSAT 6.

Check respirator training expiration date against current date.

Checked respirator training expiration date against current date.

N/A SAT UNSAT 7.

Determine respirator training qualification is satisfactory.

Determined respirator training qualification is satisfactory N/A SAT UNSAT 8.

Check quarterly training class attendance expiration date against current date.

Checked quarterly training class attendance expiration date against current date.

N/A SAT UNSAT 9.

Determine quarterly training class attendance qualification is satisfactory.

Determined quarterly training class attendance qualification is satisfactory N/A SAT UNSAT 10.

Check annual practice class attendance expiration date against current date Checked annual practice class attendance expiration date against current date.

N/A SAT UNSAT

JPM-ANO-2-JPM-NRC-STAFF02 PAGE 4 OF 6 ADMIN JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) 11.

Determine annual practice class attendance qualification is satisfactory.

Determined annual practice class attendance qualification is satisfactory N/A SAT UNSAT 12.

Check annual drill attendance expiration date against current date Checked annual drill attendance expiration date against current date.

N/A SAT UNSAT 13.

Determine annual drill attendance qualification is satisfactory.

Determined annual drill attendance qualification is satisfactory N/A SAT UNSAT (C) 14.

Determine that Danny Reed is qualified to be assigned as Fire Brigade Leader for crew Determined that Danny Reed is qualified to be assigned as Fire Brigade Leader for crew.

N/A SAT UNSAT 15.

Locate Eligibility Sheet for Jeff Melvin in Fire Brigade Eligibility Memo.

Located Eligibility Sheet for Jeff Melvin in Fire Brigade Eligibility Memo.

N/A SAT UNSAT 16.

Check Fire Brigade Leadership training completed.

Checked Fire Brigade Leadership training completed.

N/A SAT UNSAT 17.

Check respirator physical expiration date against current date.

Checked respirator physical expiration date against current date.

N/A SAT UNSAT 18.

Determine respirator physical qualification is satisfactory.

Determined respirator physical qualification is unsatisfactory.

N/A SAT UNSAT 19.

Check respirator training expiration date against current date Checked respirator training expiration date against current date.

N/A SAT UNSAT (C) 20.

Determine respirator training qualification is satisfactory.

Determined respirator training qualification is unsatisfactory.

N/A SAT UNSAT EXAMINERS NOTE Examinee may declare that Jeff Melvin is not qualified at this point and not review the remainder of the dates on the Eligibility Memo.

21.

Check quarterly training class attendance expiration date against current date.

Checked quarterly training class attendance expiration date against current date.

N/A SAT UNSAT 22.

Determine quarterly training class attendance qualification is satisfactory.

Determined quarterly training class attendance qualification is satisfactory N/A SAT UNSAT 23.

Check annual practice class attendance expiration date against current date.

Checked annual practice class attendance expiration date against current date.

N/A SAT UNSAT

JPM-ANO-2-JPM-NRC-STAFF02 PAGE 5 OF 6 ADMIN JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) 24.

Determine annual practice class attendance qualification is satisfactory.

Determined annual practice class attendance qualification is satisfactory.

N/A SAT UNSAT 25.

Check annual drill attendance expiration date against current date.

Checked annual drill attendance expiration date against current date.

N/A SAT UNSAT 26.

Determine annual drill attendance qualification is satisfactory.

Determined annual drill attendance qualification is satisfactory.

N/A SAT UNSAT (C) 27.

Determine that Jeff Melvin is NOT qualified to be assigned as Fire Brigade member for crew Determined that Jeff Melvin is NOT qualified to be assigned as Fire Brigade member for crew.

N/A SAT UNSAT END

JPM-ANO-2-JPM-NRC-STAFF02 PAGE 6 OF 6 ADMIN JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

Mode 1 Full Power. Shift turnover just completed.

INITIATING CUE:

You are the oncoming CBOT performing step V.1 of the Shift Turnover Checklist.

Using appropriate references, determine that the following NLOs assigned to your operating crew are qualified for assignment as fire brigade members. (Include checking actual dates of respirator qualifications/physicals, Fire Brigade Training and Qualification, Fire Brigade Leader Training & Qualifications.)

Danny Reed, Fire Brigade Leader Jeff Melvin, Fire Brigade Member

JPM-ANO-2-JPM-NRC-PMS001 PAGE 1 OF 6 ADMIN JOB PERFORMANCE MEASURE UNIT:

2 REV #:

000 DATE:

SYSTEM/DUTY AREA:

Plant Monitoring System (PMS)

TASK:

Setup programmable alarm on PMS.

JTA#:

KA VALUE RO:

3.0 SRO:

3.0 KA

REFERENCE:

2.1.19 APPROVED FOR ADMINISTRATION TO:

RO:

X SRO:

X TASK LOCATION:

INSIDE CR:

X OUTSIDE CR:

BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE:

Simulate SIMULATOR:

Perform LAB:

POSITION EVALUATED:

RO:

SRO:

ACTUAL TESTING ENVIRONMENT:

SIMULATOR:

PLANT SITE:

LAB:

TESTING METHOD:

SIMULATE:

PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES:

10 Minutes REFERENCE(S):

2106.008 Rev 025-00-0 and skill of craft EXAMINEE'S NAME:

SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY:

UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED:

DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

JPM-ANO-2-JPM-NRC-PMS001 PAGE 2 OF 6 ADMIN JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS:

Mode 1 Full Power. Performing initial conditions of 2106.008, Steam Generator Operations section 8.2.

TASK STANDARD:

Programmable alarm setup on PMS for blowdown activity (R4425).

TASK PERFORMANCE AIDS:

PMS operating EXAMINER'S NOTE:

Check no PMS programmable alarms are set.

JPM-ANO-2-JPM-NRC-PMS001 PAGE 3 OF 6 ADMIN JOB PERFORMANCE MEASURE INITIATING CUE:

The SS/CRS directs, "Place a programmable alarm on 2K01-J9 for blowdown activity (R4425) high of 1.0E3.

CRITICAL ELEMENTS (C): 3,4,5,6,7,9,10,and 11 PERFORMANCE CHECKLIST STANDARDS (Circle One)

NOTE:

Steps 3 through 7 may be performed prior to steps 1 and 2.

1.

Select Programmable Annunciator Assignment Screen for 2K01-J9 on PMS.

At PMS keyboard, typed J9 and depressed ENTER key.

Verified Programmable Annunciator Assignment Screen for 2K01-J9 appears on touch screen.

N/A SAT UNSAT 2.

Add R4425point on Programmable Annunciator Assignment Screen.

At PMS keyboard, selected a point location on Programmable Annunciator Assignment Screen.

Typed R4425 and depressed ENTER key.

N/A SAT UNSAT (C) 3.

Select Database Maintenance from Programmable Annunciator Assignment Screen.

At Programmable Annunciator Assignment Screen, touched DBM touch button on lower portion of touch screen.

Verified Analog Input Point Template Screen appears.

N/A SAT UNSAT (C) 4.

Select R4425 on Analog Input Point Template Screen.

At PMS keyboard, typed R4425 and depressed ENTER key.

Verified that point R4425 is selected.

N/A SAT UNSAT (C) 5.

Select Power Operations alarm setpoint for update.

At PMS keyboard, depressed right or left arrow key to place cursor on either Power Operations High Alarm position.

N/A SAT UNSAT (C) 6.

Change High alarm setpoint to 1.0E3.

At PMS keyboard, typed 1.0E3 and depressed ENTER key.

N/A SAT UNSAT (C) 7.

Save changes to alarm setpoint.

At PMS keyboard, depressed F-3 key to save.

N/A SAT UNSAT

JPM-ANO-2-JPM-NRC-PMS001 PAGE 4 OF 6 ADMIN JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) 8.

Select Programmable Annunciator Assignment Screen for 2K01-J9 on PMS.

At PMS keyboard, typed J9 and depressed ENTER key.

Verified Programmable Annunciator Assignment Screen for 2K01-J9 appears on touch screen.

N/A SAT UNSAT (C) 9.

Add R4425point on Programmable Annunciator Assignment Screen.

At PMS keyboard, selected a point location on Programmable Annunciator Assignment Screen.

Typed R4425 and depressed ENTER key.

N/A SAT UNSAT (C) 10.

Type S in process code and depress ENTER.

At PMS keyboard, typed S in process code and depressed ENTER key.

N/A SAT UNSAT (C) 11.

Save changes to alarm setpoint.

At PMS keyboard, depressed F3 key to save.

N/A SAT UNSAT END

JPM-ANO-2-JPM-NRC-PMS001 PAGE 5 OF 6 ADMIN JOB PERFORMANCE MEASURE QUESTION:

ANSWER:

JPM-ANO-2-JPM-NRC-PMS001 PAGE 6 OF 6 ADMIN JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

Mode 1 Full Power. Performing initial conditions of 2106.008, Steam Generator Operations section 8.2.

INITIATING CUE:

The SS/CRS directs, "Place a programmable alarm on 2K01-J9 for blowdown activity (R4425) high of 1.0E3.

JPM-ANO-2-JPM-NRC-CNTMT01 PAGE 1 OF 6 ADMIN JOB PERFORMANCE MEASURE UNIT:

2 REV #:

000 DATE:

SYSTEM/DUTY AREA:

Equipment Control TASK:

Evaluate Containment Atmospheric Conditions (using computer - normal operations).

JTA#:

21035010201 KA VALUE RO:

3.0 SRO:

3.4 KA

REFERENCE:

2.2.12 APPROVED FOR ADMINISTRATION TO:

RO:

X SRO:

X TASK LOCATION:

INSIDE CR:

X OUTSIDE CR:

BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE:

Simulate SIMULATOR:

Perform LAB:

POSITION EVALUATED:

RO:

SRO:

ACTUAL TESTING ENVIRONMENT:

SIMULATOR:

PLANT SITE:

LAB:

TESTING METHOD:

SIMULATE:

PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES:

10 Minutes REFERENCE(S):

OP 2104.033 Rev 039-01-0 EXAMINEE'S NAME:

SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY:

UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED:

DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

JPM-ANO-2-JPM-NRC-CNTMT01 PAGE 2 OF 6 ADMIN JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS:

100% steady state power operations. The PMS computer is available.

TASK STANDARD:

Containment atmospheric conditions have been evaluated in accordance with Technical Specifications.

TASK PERFORMANCE AIDS:

OP 2104.033, Supplement 4 ; calculator EXAMINER'S NOTE:

JPM-ANO-2-JPM-NRC-CNTMT01 PAGE 3 OF 6 ADMIN JOB PERFORMANCE MEASURE INITIATING CUE:

The SS/CRS directs, "Perform an evaluation of containment atmospheric conditions using OP 2104.033 Supplement 4."

CRITICAL ELEMENTS (C): 3, 5, 6, 7 PERFORMANCE CHECKLIST STANDARDS (Circle One) 1.

Verify computer points available.

POSITIVE CUE:

All required computer points available.

On SPDS terminal or on the PMS computer, verified the following computer points available:

- T5605-5

- T5606-6 and at least three of the following:

- P5601-1 through

- P5601-4 N/A SAT UNSAT 2.

Record containment temperature.

POSITIVE CUE:

Containment temperatures are:

T5605-5 116.9F T5606-6 115.7F On SPDS terminal or on the PMS computer, displayed following containment temperature points:

T5605-5 T5606-6 Recorded containment temperature readings in OP 2104.033 Supplement 4 Step 2.1.

N/A SAT UNSAT (C) 3.

Calculate average containment temperature to be 116.3F.

Used formula provided in OP 2104.033 Supplement 4 and readings from SPDS or PMS computer to calculate average containment temperature of 116.3F.

Recorded average containment temperature on OP 2104.033 Supplement 4 Step 2.1.

N/A SAT UNSAT 4.

Record containment pressure.

POSITIVE CUE:

Containment pressures are:

P5601-1 14.1 psia P5602-2 14.2 psia P5603-3 14.2 psia P5604-4 14.1 psia On SPDS terminal 2C69 or on the PMS computer, displayed at least three of the following containment pressure points:

P5601-1 P5603-3 P5602-2 P5604-4 Recorded containment pressure readings in OP 2104.033 Supplement 4 Step 2.2.

N/A SAT UNSAT

JPM-ANO-2-JPM-NRC-CNTMT01 PAGE 4 OF 6 ADMIN JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

(C) 5.

Calculate average containment pressure to be 14.15 psia.

Used table provided in OP 2104.033 Supplement 4 Step 2.2 and readings from SPDS or from PMS computer to calculate average containment pressure of 14.15 psia.

Recorded average containment pressure on OP 2104.033 Supplement 4 Step 2.2.

N/A SAT UNSAT (C) 6.

Plot average containment pressure vs average containment temperature.

Plotted calculated parameters on OP 2104.033 Supplement 4, Figure 1.

N/A SAT UNSAT (C) 7.

Compare containment Atmospheric parameters to Technical Specification requirements.

Used containment pressure-temperature point plotted on Figure 4-1 to determine if containment atmospheric conditions are within the region of acceptable operations.

Completed OP 2104.033 Supplement 4 Section 3.0 to indicate Technical Specification 3.6.1.4 compliance.

N/A SAT UNSAT END

JPM-ANO-2-JPM-NRC-CNTMT01 PAGE 5 OF 6 ADMIN JOB PERFORMANCE MEASURE QUESTION 1:

ANSWER:

JPM-ANO-2-JPM-NRC-CNTMT01 PAGE 6 OF 6 ADMIN JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS: 100% steady state power operations. The PMS computer is available.

INITIATING CUE:

The SS/CRS directs, "Perform an evaluation of containment atmospheric conditions using OP 2104.033 Supplement 4."

ADMINISTRATIVE QUESTION PAGE 1 OF 2 TYPE: OPEN REFERENCE KA VALUE RO: 2.7 SRO: 3.2 KA

REFERENCE:

2.3.11

REFERENCES:

OP2104.014, LRW and BMS Operations Rev 031-03-1, Supplement 2, Step 1.

RO EXAM -- SUBJECT A.3 QUESTION 1:

A liquid release is in progress on Waste Condensate Tank 2T21A. Unit 1 experiences a loss of 6900V Bus H1. What action(s) should be performed given 2104.014, Supplement 1?

ANSWER:

Terminate the liquid release from 2T21A.

Note to Examiner:

H1 and H2 are the power supplies for the Unit 1 Main Circulating Water Pumps. These pumps provide the dilution flow rates used to calculate the permissible release rates for the Unit 2 liquid release.

COMMENTS:

ADMINISTRATIVE QUESTION PAGE 2 OF 2 EXAMINEES COPY TYPE: OPEN REFERENCE RO EXAM -- SUBJECT A.3 QUESTION 1:

A liquid release is in progress on Waste Condensate Tank 2T21A. Unit 1 experiences a loss of 6900V Bus H1. What action(s) should be performed given 2104.014, Supplement 1?

ADMINISTRATIVE QUESTION PAGE 1 OF 2 TYPE: OPEN REFERENCE KA VALUE RO: 2.5 SRO: 3.1 KA

REFERENCE:

2.

3.4 REFERENCES

1012.021, Exposure Limits and Controls, Rev 004-01-0, Steps 4.5, 4.7, 4.19, 6.2.2 EXAM LEVEL: RO RO EXAM -- SUBJECT A.3 QUESTION 2:

A worker has been assigned the task of breaking Incore Flanges. The year to date dose for the worker is:

  • Committed Effective Dose Equivalent (CEDE) = 0.2 Rem
  • Shallow Dose Equivalent (SDE) = 0.6 Rem
  • Eye Dose Equivalent (LDE) = 0.7 Rem What is the maximum time the individual can work in the area and not exceed his administrative Total Effective Dose Equivalent (TEDE) limit with a 1 R/Hr gamma dose rate in the area?

ANSWER:

TEDE = DDE + CEDE TEDE = 0.3 Rem + 0.2 Rem TEDE = 0.5 Rem Admin TEDE limit for rad worker is 2 Rem/yr.

Admin Limit - TEDE = Allowable dose 2 Rem - 0.5 Rem = 1.5 Rem Stay time = dose/dose rate Stay time = 1.5 rem/1.0 rem/hr Stay time = 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />.

COMMENTS:

ADMINISTRATIVE QUESTION PAGE 2 OF 2 EXAMINEES COPY TYPE: OPEN REFERENCE RO EXAM -- SUBJECT A.3 QUESTION 2:

A worker has been assigned the task of breaking Incore Flanges. The year to date dose for the worker is:

  • Committed Effective Dose Equivalent (CEDE) = 0.2 Rem
  • Shallow Dose Equivalent (SDE) = 0.6 Rem
  • Eye Dose Equivalent (LDE) = 0.7 Rem What is the maximum time the individual can work in the area and not exceed his administrative Total Effective Dose Equivalent (TEDE) limit with a 1 R/Hr gamma dose rate in the area?

ADMINISTRATIVE QUESTION PAGE 1 OF 2 TYPE: OPEN REFERENCE KA VALUE RO: 3.3 SRO: 3.1 KA

REFERENCE:

2.4.39

REFERENCES:

1903.030, Evacuation, Rev 024-01-0, Section 6.2.2 1903.066, Emergency Response Facility-Operational Support Center (OSC)

RO EXAM SUBJECT A.4 QUESTION 1:

As an off-shift RO assigned to the Steam Generator Replacement Team, you are escorting two red badge contract engineers to a meeting in the System Engineering Building.

The following announcement is heard over the plant page system:

Attention all personnel. A Site Area Emergency has been declared on Unit 2. A plant evacuation has been declared. All emergency response and emergency standby personnel report to your designated assembly areas immediately.

State the action(s) you would take, where and who you would report to?

ANSWER:

1.

Return visitors to guard house and check them out for accountability (required).

2.

Report to Operations Support Center (OSC) located in Maintenance Facility (required).

3.

Check in with OSC Director or member of OSC staff. (optional)

COMMENTS:

ADMINISTRATIVE QUESTION PAGE 2 OF 2 EXAMINEES COPY TYPE: OPEN REFERENCE RO EXAM -- SUBJECT A.4 QUESTION 1:

As an off-shift RO assigned to the Steam Generator Replacement Team, you are escorting two red badge contract engineers to a meeting in the System Engineering Building.

The following announcement is heard over the plant page system:

Attention all personnel. A Site Area Emergency has been declared on Unit 2. A plant evacuation has been declared. All emergency response and emergency standby personnel report to your designated assembly areas immediately.

State the action(s) you would take, where and who you would report to?

ADMINISTRATIVE QUESTION PAGE 1 OF 2 TYPE: OPEN REFERENCE KA VALUE RO: 2.6 SRO: 4.0 KA

REFERENCE:

2.4.29

REFERENCES:

1903.010, EAL Classification, Rev 036-00-0, Step 4.16.1.B.

1903.010, EAL Classification, Rev 036-00-0, Attachment 4, 1.3, 1.4 RO EXAM -- SUBJECT A.4 QUESTION 2:

Given the following plant conditions:

  • Plant operating in Mode 3.
  • RCS leakage calculated at 62 gpm inside Containment.
  • Post SPTA brief in progress.

The Shift Superintendent states during the brief that an Alert EAL has been declared and the conditions for upgrade to Site Area Emergency (SAE) include greater than 1% failed fuel.

State two methods that could be used to determine when 1% failed fuel is exceeded?

ANSWER:

1. Nuclear Chemistry analysis of RCS Sample.
2. Containment Radiation Levels increasing.
3. Engineering assessment of core damage.

ADMINISTRATIVE QUESTION PAGE 2 OF 2 EXAMINEES COPY TYPE: OPEN REFERENCE RO EXAM -- SUBJECT A.4 QUESTION 2:

Given the following plant conditions:

  • Plant operating in Mode 3.
  • RCS leakage calculated at 62 gpm inside Containment.
  • Post SPTA brief in progress.

The Shift Superintendent states during the brief that an Alert EAL has been declared and the conditions for upgrade to Site Area Emergency (SAE) include greater than 1% failed fuel.

State two methods that could be used to determine when 1% failed fuel is exceeded?

ANO-2-JPM-NRC-STAFF01 PAGE 1 OF 6 ADMIN JOB PERFORMANCE MEASURE UNIT:

2 REV #:

000 DATE:

SYSTEM/DUTY AREA:

Conduct Of Operations TASK:

Determine Operating Staff Watchstanding Qualifications.

JTA#:

KA VALUE RO:

2.3 SRO:

3.4 KA

REFERENCE:

2.1.5 APPROVED FOR ADMINISTRATION TO:

RO:

SRO:

X TASK LOCATION:

INSIDE CR:

X OUTSIDE CR:

BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE:

SIMULATOR:

Perform LAB:

POSITION EVALUATED:

RO:

SRO:

ACTUAL TESTING ENVIRONMENT:

SIMULATOR:

PLANT SITE:

LAB:

TESTING METHOD:

SIMULATE:

PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES:

10 Minutes REFERENCE(S):

1015.001, Conduct of Operation, Rev 052-00-0, 1063.020, Fire Brigade Training, Rev 013-00-0, 2OPD014, Fire Brigade Eligibility Memo, Watchstanding Proficiency Memo.

EXAMINEE'S NAME:

SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY:

UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED:

DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

ANO-2-JPM-NRC-STAFF01 PAGE 2 OF 6 ADMIN JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS:

Mode 1 Full Power. Shift turnover just completed.

TASK STANDARD:

Candidate determines one CBOR qualified, CBOT NOT qualified, and WCO qualified as Fire Brigade Leader.

TASK PERFORMANCE AIDS:

1015.001, Conduct of Operation, Rev 052-00-0, 1063.020, 2OPD014, Proficiency Watch Qualifications.

Fire Brigade Eligibility Memo.

EXAMINER'S NOTE:

ANO-2-JPM-NRC-STAFF01 PAGE 3 OF 6 ADMIN JOB PERFORMANCE MEASURE INITIATING CUE:

You are the oncoming Control Room Supervisor of Crew F. Using appropriate references, determine that the below listed Control Room Watchstanders assigned to your operating crew are qualified to fill the positions assigned. (Include respirator qualifications/physicals, license status, watchstanding proficiency and fire brigade qualifications)

Denver Dennis - CBOR Steve Davis - CBOT Danny Reed - WCO and Fire Brigade Leader CRITICAL ELEMENTS (C): 8, 17, 25 PERFORMANCE CHECKLIST STANDARDS (Circle One) 1.

Obtain Fire Brigade Quarterly Memo.

Obtained Fire Brigade Quarterly Memo notebook.

N/A SAT UNSAT 2.

Locate Eligibility Sheet for Denver Dennis in Fire Brigade Quarterly Memo.

Located Eligibility Sheet for Denver Dennis in Fire Brigade Quarterly Memo.

N/A SAT UNSAT 4.

Check respirator physical, training, fit test, classroom and practical factors expiration date against current date.

Checked respirator physical, training, fit test, classroom and practical factors expiration date against current date.

N/A SAT UNSAT 5.

Obtain Unit 2 Licensed Personnel Active/Inactive Report Obtain Operator Watchstanding Proficiency Report.

N/A SAT UNSAT 6.

Locate Denver Dennis on Active/Inactive Report and determine if Active/Inactive.

Located Denver Dennis on Active/Inactive Report and determine Active Status.

N/A SAT UNSAT 7

Obtain Operator Watchstanding Proficiency Report.

Obtain Operator Watchstanding Proficiency Report.

N/A SAT UNSAT 8.

Locate proficiency data for Denver Dennis in Proficiency Report.

Located proficiency data for Denver Dennis in Proficiency Report.

N/A SAT UNSAT 7.

Determine Denver Denniss proficiency requirements met.

(7 eight hour or 5 twelve hour shifts per calendar quarter)

Determined Denver Denniss proficiency requirements met.

(7 eight hour or 5 twelve hour shifts per calendar quarter)

N/A SAT UNSAT (C) 8.

Determine Denver Dennis qualified as Control Room Watchstander.

Determined Denver Dennis qualified as Control Room Watchstander.

N/A SAT UNSAT

ANO-2-JPM-NRC-STAFF01 PAGE 4 OF 6 ADMIN JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) 9.

Obtain Fire Brigade Quarterly Memo.

Obtained Fire Brigade Quarterly Memo notebook.

N/A SAT UNSAT 10.

Locate Eligibility Sheet for Steve Davis in Fire Brigade Quarterly Memo.

Located Eligibility Sheet for for Steve Davis in Fire Brigade Quarterly Memo.

N/A SAT UNSAT 11.

Check respirator physical, training, fit test, classroom and practical factors expiration date against current date.

Checked respirator physical, training, fit test, classroom and practical factors expiration date against current date.

N/A SAT UNSAT 12.

Obtain Unit 2 Licensed Personnel Active/Inactive Report Obtain Operator Watchstanding Proficiency Report.

N/A SAT UNSAT 13.

Locate Steve Davis on Active/Inactive Report and determine if Active/Inactive.

Located Steve Davis on Active/Inactive Report and determine INACTIVE Status.

N/A SAT UNSAT 14.

Obtain Operator Watchstanding Proficiency Report.

Obtain Operator Watchstanding Proficiency Report.

N/A SAT UNSAT 15.

Locate proficiency data for Steve Davis in Proficiency Report.

Located proficiency data for Steve Davis in Proficiency Report.

N/A SAT UNSAT 16.

Determine if Steve Daviss proficiency requirements are met.

(7 eight hour or 5 twelve hour shifts per calendar quarter)

Determined Steve Daviss proficiency requirements NOT met.

(7 eight hour or 5 twelve hour shifts per calendar quarter)

N/A SAT UNSAT (C) 17.

Determine if Steve Daviss qualifications as CBOT are met and if he is qualified as a Control Room Watchstander.

Determined Steve Davis is NOT qualified as a Control Room Watchstander.

N/A SAT UNSAT 18.

Obtain Fire Brigade Quarterly Memo.

Obtained Fire Brigade Quarterly Memo notebook.

N/A SAT UNSAT 19.

Locate Eligibility Sheet for Danny Reed in Fire Brigade Quarterly Memo.

Located Eligibility Sheet for Danny Reed in Fire Brigade Quarterly Memo.

N/A SAT UNSAT 20.

Check respirator physical, training, fit test, classroom and practical factors expiration date against current date.

Checked respirator physical, training, fit test, classroom and practical factors expiration date against current date.

N/A SAT UNSAT

ANO-2-JPM-NRC-STAFF01 PAGE 5 OF 6 ADMIN JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) 21.

Check Danny Reeds Fire Brigade Leader Training, Quarterly Training Class, Annual Practice Class, and Annual Drill requirements are met.

Checked Danny Reeds Fire Brigade Leader Training, Quarterly Training Class, Annual Practice Class, and Annual Drill requirements are met.

N/A SAT UNSAT 22.

Obtain Operator Watchstanding Proficiency Report.

Obtain Operator Watchstanding Proficiency Report.

N/A SAT UNSAT 23.

Locate proficiency data for Danny Reed in Proficiency Report.

Located proficiency data for Danny Reed in Proficiency Report.

N/A SAT UNSAT 24.

Determine Danny Reeds proficiency requirements met.

(eight hours per calendar quarter)

Determined Danny Reeds proficiency requirements are met.

(eight hours per calendar quarter)

N/A SAT UNSAT (C) 25.

Determine Danny Reed qualified as WCO and Fire Brigade Leader).

Determined (WCO Name) qualified as WCO and Fire Brigade Leader).

N/A SAT UNSAT END

ANO-2-JPM-NRC-STAFF01 PAGE 6 OF 6 ADMIN JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

Mode 1 Full Power. Shift turnover just completed.

INITIATING CUE:

You are the oncoming Control Room Supervisor of Crew F. Using appropriate references, determine that the below listed Crew Watchstanders assigned to your operating crew are qualified to fill the positions assigned. (Include respirator qualifications/physicals, License status, watchstanding proficiency and fire brigade qualifications)

Denver Dennis - CBOR Steve Davis - CBOT Danny Reed - WCO and Fire Brigade Leader

JPM-ANO-2-JPM-NRC-PEREMG PAGE 1 OF 6 ADMIN JOB PERFORMANCE MEASURE UNIT:

2 REV #:

000 DATE:

SYSTEM/DUTY AREA:

Conduct Of Operations TASK:

Perform Personnel Emergency Checklist JTA#:

KA VALUE RO:

SRO:

2.8 KA

REFERENCE:

2.1.16 APPROVED FOR ADMINISTRATION TO:

RO:

SRO:

X TASK LOCATION:

INSIDE CR:

X OUTSIDE CR:

BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE:

Simulate SIMULATOR:

Perform LAB:

POSITION EVALUATED:

RO:

SRO:

ACTUAL TESTING ENVIRONMENT:

SIMULATOR:

PLANT SITE:

LAB:

TESTING METHOD:

SIMULATE:

PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES:

10 Minutes REFERENCE(S):

1903.023B, Rev 032-00-0; 1903.062 Rev 15 EXAMINEE'S NAME:

SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY:

UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED:

DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

JPM-ANO-2-JPM-NRC-PEREMG PAGE 2 OF 6 ADMIN JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS:

100% steady state power operations. Report comes into control room that a mechanic (Joe McWrench) has fallen from the spiral staircase in the Unit 2 Auxiliary Building, North Piping Penetration Room and is currently located on the floor of the 335 elevation. The mechanic is unconscious and appears to have a fracture of his right leg, multiple bruises and a severe laceration on upper right arm.

TASK STANDARD:

Medical team notified by radio-voice pagers using base radio, fire tone actuated, announcement made using plant paging system, ANO Duty Nurse and ANO Physicians pagers activated.

TASK PERFORMANCE AIDS:

Form 1903.023B (Personnel Emergency Checklist), Paging Encoder Operation Instructions posted by Encoder.

Or 1903.062 (Communications System Operating Procedure) Step 7.6.1.E.

EXAMINER'S NOTE:

JPM-ANO-2-JPM-NRC-PEREMG PAGE 3 OF 6 ADMIN JOB PERFORMANCE MEASURE INITIATING CUE:

The SS/CRS directs, "Perform Personnel Emergency Checklist (Form 1903.023B) Steps 1 through 3 using the information provided."

CRITICAL ELEMENTS (C): 2, 4, 5, 7, 9, 10 PERFORMANCE CHECKLIST STANDARDS (Circle One) 1.

Obtain Personnel Emergency Checklist (Form 1903.023B)

Obtained copy of Personnel Emergency Checklist (Form 1903.023B) from one of the following:

Get copy from procedure rack on Control Room wall.

Get 1903.023 from bookshelf in rear of Control Room and make copy.

Call up procedure on IDEAS and print copy of latest revision.

N/A SAT UNSAT EXAMINERS NOTE:

If examinee elects to get procedure and make copy or use computer to print, provide copy of Form 1903.023B in package to expedite JPM.

(C) 2.

Select Channel 1 on the radio console.

Selected Channel 1 on the radio console.

N/A SAT UNSAT 3.

Verify SCRAMBLE OFF is selected on radio console.

Verified SCRAMBLE OFF is selected on radio console.

N/A SAT UNSAT (C) 4.

Select the response group needed from the Instant Call Keys on the encoder.

Selected the MEDICAL button on the Instant Call Keys on the Encoder.

N/A SAT UNSAT (C) 5.

Verify that the appropriate Instant Call Key is selected, and press the IC SEND key. Wait for tones to be transmitted.

Verified the MEDICAL instant call key selected and pressed IC SEND key.

Observed the red indicator flash indicating tones transmitted.

N/A SAT UNSAT 6.

Momentarily depress and hold the SIREN ALERT key.

Depressed the SIREN ALERT and held down for two or three seconds.

N/A SAT UNSAT (C) 7.

Transmit the appropriate message.

Depressed the microphone switch on the base radio console and gave the following message:

ATTENTION EMERGENCY MEDICAL TEAM MEMBERS. A Personnel Emergency has occurred in the Unit 2 Auxiliary Building, North Piping Penetration Room, Elevation 335.

Emergency Medical Team members please respond.

N/A SAT UNSAT

JPM-ANO-2-JPM-NRC-PEREMG PAGE 4 OF 6 ADMIN JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) 8.

Momentarily press the page fire tone push-button.

Depressed the page fire tone pushbutton and held down for two or three seconds.

N/A SAT UNSAT (C) 9.

Using plant paging system, give message to alert personnel to remain clear of the location of the emergency.

Used plant paging system to make the following announcement:

ATTENTION ALL PERSONNEL, ATTENTION ALL PERSONNEL. A PERSONNEL EMERGENCY has occurred in the Unit 2 Auxiliary Building, North Piping Penetration Room, Elevation 335. The EMERGENCY MEDICAL TEAM is responding. All personnel should stay clear of North Piping Penetration Room, Elevation 335.

N/A SAT UNSAT (C) 10.

Notify ANO Medical Department.

Positive Cue:

Pagers have been activated.

Simulator Phones will not allow the pager numbers to be dialed.

Notified ANO Medical Department by dialing the following pager numbers:

ANO Duty Nurse Pager 964-6076 ANO Physician Pager 964-3936 N/A SAT UNSAT END

JPM-ANO-2-JPM-NRC-PEREMG PAGE 5 OF 6 ADMIN JOB PERFORMANCE MEASURE QUESTION:

ANSWER:

JPM-ANO-2-JPM-NRC-PEREMG PAGE 6 OF 6 ADMIN JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:

100% steady state power operations.

Report comes into control room that a mechanic (Joe McWrench) has fallen from the spiral staircase in the Unit 2 Auxiliary Building, North Piping Penetration Room and is currently located on the floor of the 335 elevation. The mechanic is unconscious and appears to have a fracture of his right leg, multiple bruises and a severe laceration on upper right arm.

INITIATING CUE:

The SS/CRS directs, "Perform Personnel Emergency Checklist (Form 1903.023B)

Steps 1 through 3 using the information provided."

JPM-ANO-2-JPM-NRC-EPLAN1 PAGE 1 OF 5 ADMIN JOB PERFORMANCE MEASURE UNIT:

2 REV #:

000 DATE:

SYSTEM/DUTY AREA:

Emergency Procedure/Plan TASK:

Determine Protective Action Recommendations for Radiological Release JTA#:

KA VALUE RO:

SRO:

4.0 KA

REFERENCE:

2.4.44 APPROVED FOR ADMINISTRATION TO:

RO:

SRO:

X TASK LOCATION:

INSIDE CR:

X OUTSIDE CR:

BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE:

Simulate SIMULATOR:

Perform LAB:

POSITION EVALUATED:

RO:

SRO:

ACTUAL TESTING ENVIRONMENT:

SIMULATOR:

PLANT SITE:

LAB:

TESTING METHOD:

SIMULATE:

PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES:

10 Minutes REFERENCE(S):

1903.011 Revision 025-03-0 EXAMINEE'S NAME:

SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY:

UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED:

DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

JPM-ANO-2-JPM-NRC-EPLAN1 PAGE 2 OF 5 ADMIN JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS:

The plant was tripped due to a Loss of Coolant Accident with a 15% Fuel Clad Failure and samples indicate an extremely large amount of fission products present in the containment. A non-isolable release is in progress.

Wind Direction is from 170 degrees. The Dose assessor has provided the following RDACS report.

TASK STANDARD:

Determination by candidate that 2 and Par 3 should be combined and that the additional zones listed from the Dose Assessment report (RDACS) should be evacuated and the remainder of the 10-Mile EPZ should be sheltered.

TASK PERFORMANCE AIDS: of 1903.11, Protective Action Recommendations for General Emergency.

Dose Assessors report from RDACS EXAMINER'S NOTE:

JPM-ANO-2-JPM-NRC-EPLAN1 PAGE 3 OF 5 ADMIN JOB PERFORMANCE MEASURE INITIATING CUE:

The SS directs, "Determine the Protective Action Recommendations (PAR) using Attachment 6 of 1903.011, Emergency Response/Notifications and the Dose Assessors RDACS Protective Action Recommendation Report."

CRITICAL ELEMENTS (C): 6, 7, 9, 10, 11, 12, 13, 14, 15 PERFORMANCE CHECKLIST STANDARDS (Circle One) 1.

Obtain Attachment 6 of 1903.011, Emergency Response/Notifications.

Obtained Attachment 6 of 1903.011, Emergency Response/Notifications from one of the following:

Get copy from the end rack of 2C69 procedure rack on Control Room wall.

Get 1903.011 from bookshelf in rear of Control Room and make copy.

Call up procedure on IDEAS and print copy of latest revision.

N/A SAT UNSAT EXAMINERS NOTE:

If examinee elects to get procedure and make copy or use computer to print, provide copy of Attachment 6, Protective Action Recommendations for General Emergency.

Provide Candidate with Dose Assessors Report.

2.

Using the Flow Chart, determine that

>10% Fuel Clad Failure exists.

Used initial conditions and determined that >10% Fuel Clad Failure exists.

Determined the YES decision path should be chosen.

N/A SAT UNSAT 3.

Determine that a LOCA is in progress.

OR Containment Atmosphere sample indicates large amounts of fission products.

Used initial conditions and determined:

that a LOCA is in progress AND Containment Atmosphere sample indicated large amounts of fission products.

Determined that the YES decision path should be chosen.

N/A SAT UNSAT 4.

Determine if Containment Failure is projected OR Radiological Release is in progress.

Used initial conditions and determined that Radiological Release is in progress.

Determined that the YES decision path should be chosen.

N/A SAT UNSAT 5.

Determine if Release is in progress.

Determined that the YES decision path should be chosen.

N/A SAT UNSAT

JPM-ANO-2-JPM-NRC-EPLAN1 PAGE 4 OF 5 ADMIN JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

(C) 6.

Using the RDACS Report provided by the Dose Assessor, determine that the EPA Protective Guideline of 5.0 Rem Child Thyroid is being exceeded.

Used the RDACS Report provided by Dose Assessor to determine that the EPA Protective Guideline of 5.0 Rem Child Thyroid is being exceeded.

Determined that the YES decision path should be chosen.

N/A SAT UNSAT (C) 7.

Determine that Protective Action Recommendations (PAR) 2 and 3 should be combined.

Determined that PAR 2 and 3 should be combined.

N/A SAT UNSAT (C) 8.

Determine from the Dose Assessors report that Zone G is projected to exceed the EPA Protective Action Guidelines and should be evacuated Determined that Zone G is projected to exceed the EPA Protective Action Recommendations.

N/A SAT UNSAT (C) 9.

Determine, using PAR 2, and given the current wind direction, that Zones G, H, K, M, N, O, P, R & U, should be evacuated and that the rest of the EPZ should be sheltered.

Determined, using PAR 2, and given the current wind direction, that Zones G, H, K, M, N, O, P, R & U, should be evacuated and that the rest of the EPZ should be sheltered.

N/A SAT UNSAT (C) 10.

Combine the Zones from PAR No. 2 and the Dose Assessors Report and make the recommendation that Zones G, H, K, M, N, O, P, R & U be evacuated and the remainder of the EPZ be sheltered.

Combined the Zones from PAR No. 2 and the Dose Assessors Report and made the recommendation that Zones G, H, K, M, N, O, P, R & U be evacuated and the remainder of the EPZ be sheltered.

N/A SAT UNSAT END

JPM-ANO-2-JPM-NRC-EPLAN1 PAGE 5 OF 5 ADMIN JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:

The plant was tripped due to a Loss of Coolant Accident with a 15% Fuel Clad Failure and samples indicate an extremely large amount of fission products present in the containment. A non-isolable release is in progress. Wind Direction is from 170 degrees.

General Emergency has been declared. The Dose assessor has provided the following RDACS report.

INITIATING CUE:

The SS directs, "Determine the Protective Action Recommendations using Attachment 6 of 1903.011, Emergency Response/Notifications and the Dose Assessors RDACS Report."

ADMINISTRATIVE QUESTION PAGE 1 OF 2 TYPE: OPEN REFERENCE KA VALUE RO: 2.7 SRO: 3.2 KA

REFERENCE:

2.3.11

REFERENCES:

OP2104.014, LRW and BMS Operations Rev 032-00-0, Step 5.4.

Unit 2 Technical Specifications 3.11.1, Liquid Holdup Tanks.

SRO EXAM -- SUBJECT A.3 QUESTION 1:

Due to the overhaul of the Unit 2 Turbine Generator during 2R14, a temporary tool and parts decontamination facility has been set up on the Unit 2 Turbine Deck near the train bay access.

Liquids from the facility are being collected in a 500 gallon poly tank located on Elevation 354 in the train bay.

Chemistry analysis performed on a sample from the tank indicates the following isotopic content:

Cr-51 2.225E6 µci Mn-54 1.455E6 µci Co-58 1.382E6 µci Fe-59 3.551E6 µci Sr-92 1.413E6 µci What action(s), if any, are required and what are the bases for the action(s)?

ANSWER:

1. Immediately suspend all additions of radioactive material to the affected tank.
2. Within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> reduce tank contents to < 10 curies.
3. Based on Tech Spec 3.11.1, (Radioactive Effluents, Liquid Holdup Tanks).

COMMENTS:

ADMINISTRATIVE QUESTION PAGE 2 OF 2 EXAMINEES COPY TYPE: OPEN REFERENCE SRO EXAM -- SUBJECT A.3 QUESTION 1:

Due to the overhaul of the Unit 2 Turbine Generator during 2R14, a temporary tool and parts decontamination facility has been set up on the Unit 2 Turbine Deck near the train bay access.

Liquids from the facility are being collected in a 500 gallon poly tank located on Elevation 354 in the train bay.

Chemistry analysis performed on a sample from the tank indicates the following isotopic content:

Cr-51 2.225E6 µci Mn-54 1.455E6 µci Co-58 1.382E6 µci Fe-59 3.551E6 µci Sr-92 1.413E6 µci What action(s), if any, are required and what are the bases for the action(s)?

ADMINISTRATIVE QUESTION PAGE 1 OF 2 TYPE: OPEN REFERENCE KA VALUE RO: 2.5 SRO: 3.1 KA

REFERENCE:

2.

3.4 REFERENCES

1903.033 Rev 017-01-0, Protective Action Guidelines For Rescue/Repair & Damage Control Team, Step 6.1.3 SRO EXAM -- SUBJECT A.3 QUESTION 2:

Determine whose authorization is required to exceed dose limits of 10CFR20 for the given conditions?

  • Large Break LOCA has occurred.
  • RAS has actuated.
  • Estimated dose is 6.1 Rem to isolate the leak.
  • EAL was declared 75 minutes ago.
  • Emergency Response Organization is fully staffed.

ANSWER:

TSC Director COMMENTS:

ADMINISTRATIVE QUESTION PAGE 2 OF 2 EXAMINEES COPY TYPE: OPEN REFERENCE SRO EXAM -- SUBJECT A.3 QUESTION 2:

Determine whose authorization is required to exceed dose limits of 10CFR20 for the given conditions?

  • Large Break LOCA has occurred.
  • RAS has actuated.
  • Estimated dose is 6.1 Rem to isolate the leak.
  • EAL was declared 75 minutes ago.
  • Emergency Response Organization is fully staffed.