ML010240521

From kanterella
Jump to navigation Jump to search
Init Exam 04/2000 Final RO and SRO Admin Jpms
ML010240521
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 04/24/2000
From:
NRC Region 4
To:
References
-RFPFR
Download: ML010240521 (47)


Text

JPM- ANO-2-JPM-NRC-STAFF02 PAGE 1 OF 6 ADMIN JOB PERFORMANCE MEASURE UNIT: 2 REV #: 000 DATE:

SYSTEM/DUTY AREA: Conduct Of Operations TASK: Determine NLO Fire Brigade Qualifications.

JTA#:

KA VALUE RO: 2.3 SRO: 3.4 KA

REFERENCE:

2.1.5 APPROVED FOR ADMINISTRATION TO: RO: X SRO:

TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: Perform SIMULATOR: Perform LAB:

POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 10 Minutes REFERENCE(S): 1015.001, Conduct of Operation, Rev 052-00-0, 1063.020, Fire Brigade Training, Rev 013-00-0, 2OPD014, Fire Brigade Eligibility Memo EXAMINEE'S NAME: SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED: DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

JPM- ANO-2-JPM-NRC-STAFF02 PAGE 2 OF 6 ADMIN JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS:

Mode 1 Full Power. Shift turnover just completed.

TASK STANDARD:

Candidate determines Danny Reed is qualified as Fire Brigade Leader and Jeff Melvin is not qualified as Fire Brigade member.

TASK PERFORMANCE AIDS:

1015.001, Conduct of Operation, Rev 052-00-0, 1063.020, Fire Brigade Training, Rev 013-00-0, 2OPD014, Fire Brigade Eligibility Memo EXAMINER'S NOTE:

JPM- ANO-2-JPM-NRC-STAFF02 PAGE 3 OF 6 ADMIN JOB PERFORMANCE MEASURE INITIATING CUE:

You are the oncoming CBOT performing step V.1 of the Shift Turnover Checklist. Using appropriate references, determine that the following NLOs assigned to your operating crew are qualified for assignment as fire brigade members. (Include checking actual dates of respirator qualifications/physicals, Fire Brigade Training and Qualification, Fire Brigade Leader Training & Qualifications.)

Danny Reed, Fire Brigade Leader Jeff Melvin, Fire Brigade Member CRITICAL ELEMENTS (C): 14, 20, 27 PERFORMANCE CHECKLIST STANDARDS (Circle One)

EXAMINERS NOTE Examinee will be given a copy of the

1. Obtain Fire Brigade Eligibility Obtained Fire Brigade Eligibility N/A SAT UNSAT Memo. Memo.
2. Locate Eligibility Sheet for Danny Located Eligibility Sheet for Danny N/A SAT UNSAT Reed in Fire Brigade Quarterly Reed in Fire Brigade Quarterly Memo. Memo.
3. Check Fire Brigade Leadership Checked Fire Brigade Leadership N/A SAT UNSAT training completed. training completed.
4. Check respirator physical Checked respirator physical N/A SAT UNSAT expiration date against current expiration date against current date.

date.

5. Determine respirator physical Determined respirator physical N/A SAT UNSAT qualification is satisfactory. qualification is satisfactory.
6. Check respirator training expiration Checked respirator training N/A SAT UNSAT date against current date. expiration date against current date.
7. Determine respirator training Determined respirator training N/A SAT UNSAT qualification is satisfactory. qualification is satisfactory
8. Check quarterly training class Checked quarterly training class N/A SAT UNSAT attendance expiration date against attendance expiration date against current date. current date.
9. Determine quarterly training class Determined quarterly training class N/A SAT UNSAT attendance qualification is attendance qualification is satisfactory. satisfactory
10. Check annual practice class Checked annual practice class N/A SAT UNSAT attendance expiration date against attendance expiration date against current date current date.

JPM- ANO-2-JPM-NRC-STAFF02 PAGE 4 OF 6 ADMIN JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

11. Determine annual practice class Determined annual practice class N/A SAT UNSAT attendance qualification is attendance qualification is satisfactory. satisfactory
12. Check annual drill attendance Checked annual drill attendance N/A SAT UNSAT expiration date against current expiration date against current date.

date

13. Determine annual drill attendance Determined annual drill attendance N/A SAT UNSAT qualification is satisfactory. qualification is satisfactory (C) 14. Determine that Danny Reed is Determined that Danny Reed is N/A SAT UNSAT qualified to be assigned as Fire qualified to be assigned as Fire Brigade Leader for crew Brigade Leader for crew.
15. Locate Eligibility Sheet for Jeff Located Eligibility Sheet for Jeff N/A SAT UNSAT Melvin in Fire Brigade Eligibility Melvin in Fire Brigade Eligibility Memo. Memo.
16. Check Fire Brigade Leadership Checked Fire Brigade Leadership N/A SAT UNSAT training completed. training completed.
17. Check respirator physical Checked respirator physical N/A SAT UNSAT expiration date against current expiration date against current date.

date.

18. Determine respirator physical Determined respirator physical N/A SAT UNSAT qualification is satisfactory. qualification is unsatisfactory.
19. Check respirator training expiration Checked respirator training N/A SAT UNSAT date against current date expiration date against current date.

(C) 20. Determine respirator training Determined respirator training N/A SAT UNSAT qualification is satisfactory. qualification is unsatisfactory.

EXAMINERS NOTE Examinee may declare that Jeff Melvin is not qualified at this point and not review the remainder of the dates on the Eligibility Memo.

21. Check quarterly training class Checked quarterly training class N/A SAT UNSAT attendance expiration date against attendance expiration date against current date. current date.
22. Determine quarterly training class Determined quarterly training class N/A SAT UNSAT attendance qualification is attendance qualification is satisfactory. satisfactory
23. Check annual practice class Checked annual practice class N/A SAT UNSAT attendance expiration date against attendance expiration date against current date. current date.

JPM- ANO-2-JPM-NRC-STAFF02 PAGE 5 OF 6 ADMIN JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

24. Determine annual practice class Determined annual practice class N/A SAT UNSAT attendance qualification is attendance qualification is satisfactory. satisfactory.
25. Check annual drill attendance Checked annual drill attendance N/A SAT UNSAT expiration date against current expiration date against current date.

date.

26. Determine annual drill attendance Determined annual drill attendance N/A SAT UNSAT qualification is satisfactory. qualification is satisfactory.

(C) 27. Determine that Jeff Melvin is NOT Determined that Jeff Melvin is NOT N/A SAT UNSAT qualified to be assigned as Fire qualified to be assigned as Fire Brigade member for crew Brigade member for crew.

END

JPM- ANO-2-JPM-NRC-STAFF02 PAGE 6 OF 6 ADMIN JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

Mode 1 Full Power. Shift turnover just completed.

INITIATING CUE:

You are the oncoming CBOT performing step V.1 of the Shift Turnover Checklist.

Using appropriate references, determine that the following NLOs assigned to your operating crew are qualified for assignment as fire brigade members. (Include checking actual dates of respirator qualifications/physicals, Fire Brigade Training and Qualification, Fire Brigade Leader Training & Qualifications.)

Danny Reed, Fire Brigade Leader Jeff Melvin, Fire Brigade Member

JPM- ANO-2-JPM-NRC-PMS001 PAGE 1 OF 6 ADMIN JOB PERFORMANCE MEASURE UNIT: 2 REV #: 000 DATE:

SYSTEM/DUTY AREA: Plant Monitoring System (PMS)

TASK: Setup programmable alarm on PMS.

JTA#:

KA VALUE RO: 3.0 SRO: 3.0 KA

REFERENCE:

2.1.19 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: Simulate SIMULATOR: Perform LAB:

POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 10 Minutes REFERENCE(S): 2106.008 Rev 025-00-0 and skill of craft EXAMINEE'S NAME: SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED: DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

JPM- ANO-2-JPM-NRC-PMS001 PAGE 2 OF 6 ADMIN JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS:

Mode 1 Full Power. Performing initial conditions of 2106.008, Steam Generator Operations section 8.2.

TASK STANDARD:

Programmable alarm setup on PMS for blowdown activity (R4425).

TASK PERFORMANCE AIDS:

PMS operating EXAMINER'S NOTE:

Check no PMS programmable alarms are set.

JPM- ANO-2-JPM-NRC-PMS001 PAGE 3 OF 6 ADMIN JOB PERFORMANCE MEASURE INITIATING CUE:

The SS/CRS directs, "Place a programmable alarm on 2K01-J9 for blowdown activity (R4425) high of 1.0E3.

CRITICAL ELEMENTS (C): 3,4,5,6,7,9,10,and 11 PERFORMANCE CHECKLIST STANDARDS (Circle One)

NOTE:

Steps 3 through 7 may be performed prior to steps 1 and 2.

1. Select Programmable At PMS keyboard, typed J9 and N/A SAT UNSAT Annunciator Assignment Screen depressed ENTER key.

for 2K01-J9 on PMS.

Verified Programmable Annunciator Assignment Screen for 2K01-J9 appears on touch screen.

2. Add R4425point on At PMS keyboard, selected a point N/A SAT UNSAT Programmable Annunciator location on Programmable Assignment Screen. Annunciator Assignment Screen.

Typed R4425 and depressed ENTER key.

(C) 3. Select Database Maintenance from At Programmable Annunciator N/A SAT UNSAT Programmable Annunciator Assignment Screen, touched Assignment Screen. DBM touch button on lower portion of touch screen.

Verified Analog Input Point Template Screen appears.

(C) 4. Select R4425 on Analog Input At PMS keyboard, typed R4425 N/A SAT UNSAT Point Template Screen. and depressed ENTER key.

Verified that point R4425 is selected.

(C) 5. Select Power Operations alarm At PMS keyboard, depressed right N/A SAT UNSAT setpoint for update. or left arrow key to place cursor on either Power Operations High Alarm position.

(C) 6. Change High alarm setpoint to At PMS keyboard, typed 1.0E3 N/A SAT UNSAT 1.0E3. and depressed ENTER key.

(C) 7. Save changes to alarm setpoint. At PMS keyboard, depressed F-3 N/A SAT UNSAT key to save.

JPM- ANO-2-JPM-NRC-PMS001 PAGE 4 OF 6 ADMIN JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

8. Select Programmable At PMS keyboard, typed J9 and N/A SAT UNSAT Annunciator Assignment Screen depressed ENTER key.

for 2K01-J9 on PMS.

Verified Programmable Annunciator Assignment Screen for 2K01-J9 appears on touch screen.

(C) 9. Add R4425point on At PMS keyboard, selected a point N/A SAT UNSAT Programmable Annunciator location on Programmable Assignment Screen. Annunciator Assignment Screen.

Typed R4425 and depressed ENTER key.

(C) 10. Type S in process code and At PMS keyboard, typed S in N/A SAT UNSAT depress ENTER. process code and depressed ENTER key.

(C) 11. Save changes to alarm setpoint. At PMS keyboard, depressed F3 N/A SAT UNSAT key to save.

END

JPM- ANO-2-JPM-NRC-PMS001 PAGE 5 OF 6 ADMIN JOB PERFORMANCE MEASURE QUESTION:

ANSWER:

JPM- ANO-2-JPM-NRC-PMS001 PAGE 6 OF 6 ADMIN JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

Mode 1 Full Power. Performing initial conditions of 2106.008, Steam Generator Operations section 8.2.

INITIATING CUE:

The SS/CRS directs, "Place a programmable alarm on 2K01-J9 for blowdown activity (R4425) high of 1.0E3.

JPM- ANO-2-JPM-NRC-CNTMT01 PAGE 1 OF 6 ADMIN JOB PERFORMANCE MEASURE UNIT: 2 REV #: 000 DATE:

SYSTEM/DUTY AREA: Equipment Control TASK: Evaluate Containment Atmospheric Conditions (using computer - normal operations).

JTA#: 21035010201 KA VALUE RO: 3.0 SRO: 3.4 KA

REFERENCE:

2.2.12 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: Simulate SIMULATOR: Perform LAB:

POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 10 Minutes REFERENCE(S): OP 2104.033 Rev 039-01-0 EXAMINEE'S NAME: SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED: DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

JPM- ANO-2-JPM-NRC-CNTMT01 PAGE 2 OF 6 ADMIN JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS:

100% steady state power operations. The PMS computer is available.

TASK STANDARD:

Containment atmospheric conditions have been evaluated in accordance with Technical Specifications.

TASK PERFORMANCE AIDS:

OP 2104.033, Supplement 4 ; calculator EXAMINER'S NOTE:

JPM- ANO-2-JPM-NRC-CNTMT01 PAGE 3 OF 6 ADMIN JOB PERFORMANCE MEASURE INITIATING CUE:

The SS/CRS directs, "Perform an evaluation of containment atmospheric conditions using OP 2104.033 Supplement 4."

CRITICAL ELEMENTS (C): 3, 5, 6, 7 PERFORMANCE CHECKLIST STANDARDS (Circle One)

1. Verify computer points available. On SPDS terminal or on the PMS N/A SAT UNSAT computer, verified the following POSITIVE CUE: computer points available:

All required computer points - T5605-5 available. - T5606-6 and at least three of the following:

- P5601-1 through

- P5601-4

2. Record containment temperature. On SPDS terminal or on the PMS N/A SAT UNSAT computer, displayed following POSITIVE CUE: containment temperature points:

Containment temperatures are:

T5605-5 T5606-6 T5605-5 116.90F T5606-6 115.70F Recorded containment temperature readings in OP 2104.033 Supplement 4 Step 2.1.

(C) 3. Calculate average containment Used formula provided in N/A SAT UNSAT temperature to be 116.30F. OP 2104.033 Supplement 4 and readings from SPDS or PMS computer to calculate average containment temperature of 116.30F.

Recorded average containment temperature on OP 2104.033 Supplement 4 Step 2.1.

4. Record containment pressure. On SPDS terminal 2C69 or on the N/A SAT UNSAT PMS computer, displayed at least POSITIVE CUE: three of the following containment Containment pressures are: pressure points:

P5601-1 14.1 psia P5601-1 P5603-3 P5602-2 14.2 psia P5602-2 P5604-4 P5603-3 14.2 psia P5604-4 14.1 psia Recorded containment pressure readings in OP 2104.033 Supplement 4 Step 2.2.

JPM- ANO-2-JPM-NRC-CNTMT01 PAGE 4 OF 6 ADMIN JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

(C) 5. Calculate average containment Used table provided in OP 2104.033 N/A SAT UNSAT pressure to be 14.15 psia. Supplement 4 Step 2.2 and readings from SPDS or from PMS computer to calculate average containment pressure of 14.15 psia.

Recorded average containment pressure on OP 2104.033 Supplement 4 Step 2.2.

(C) 6. Plot average containment pressure Plotted calculated parameters on N/A SAT UNSAT vs average containment OP 2104.033 Supplement 4, Figure 1.

temperature.

(C) 7. Compare containment Used containment N/A SAT UNSAT Atmospheric parameters to pressure-temperature point plotted Technical Specification on Figure 4-1 to determine if requirements. containment atmospheric conditions are within the region of acceptable operations.

Completed OP 2104.033 Supplement 4 Section 3.0 to indicate Technical Specification 3.6.1.4 compliance.

END

JPM- ANO-2-JPM-NRC-CNTMT01 PAGE 5 OF 6 ADMIN JOB PERFORMANCE MEASURE QUESTION 1:

ANSWER:

JPM- ANO-2-JPM-NRC-CNTMT01 PAGE 6 OF 6 ADMIN JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS: 100% steady state power operations. The PMS computer is available.

INITIATING CUE:

The SS/CRS directs, "Perform an evaluation of containment atmospheric conditions using OP 2104.033 Supplement 4."

ADMINISTRATIVE QUESTION PAGE 1 OF 2 TYPE: OPEN REFERENCE KA VALUE RO: 2.7 SRO: 3.2 KA

REFERENCE:

2.3.11

REFERENCES:

OP2104.014, LRW and BMS Operations Rev 031-03-1, Supplement 2, Step 1.

RO EXAM -- SUBJECT A.3 QUESTION 1:

A liquid release is in progress on Waste Condensate Tank 2T21A. Unit 1 experiences a loss of 6900V Bus H1. What action(s) should be performed given 2104.014, Supplement 1?

ANSWER:

Terminate the liquid release from 2T21A.

Note to Examiner:

H1 and H2 are the power supplies for the Unit 1 Main Circulating Water Pumps. These pumps provide the dilution flow rates used to calculate the permissible release rates for the Unit 2 liquid release.

COMMENTS:

ADMINISTRATIVE QUESTION PAGE 2 OF 2 EXAMINEES COPY TYPE: OPEN REFERENCE RO EXAM -- SUBJECT A.3 QUESTION 1:

A liquid release is in progress on Waste Condensate Tank 2T21A. Unit 1 experiences a loss of 6900V Bus H1. What action(s) should be performed given 2104.014, Supplement 1?

ADMINISTRATIVE QUESTION PAGE 1 OF 2 TYPE: OPEN REFERENCE KA VALUE RO: 2.5 SRO: 3.1 KA

REFERENCE:

2.

3.4 REFERENCES

1012.021, Exposure Limits and Controls, Rev 004-01-0, Steps 4.5, 4.7, 4.19, 6.2.2 EXAM LEVEL: RO RO EXAM -- SUBJECT A.3 QUESTION 2:

A worker has been assigned the task of breaking Incore Flanges. The year to date dose for the worker is:

  • Committed Effective Dose Equivalent (CEDE) = 0.2 Rem
  • Shallow Dose Equivalent (SDE) = 0.6 Rem
  • Eye Dose Equivalent (LDE) = 0.7 Rem What is the maximum time the individual can work in the area and not exceed his administrative Total Effective Dose Equivalent (TEDE) limit with a 1 R/Hr gamma dose rate in the area?

ANSWER:

TEDE = DDE + CEDE TEDE = 0.3 Rem + 0.2 Rem TEDE = 0.5 Rem Admin TEDE limit for rad worker is 2 Rem/yr.

Admin Limit - TEDE = Allowable dose 2 Rem - 0.5 Rem = 1.5 Rem Stay time = dose/dose rate Stay time = 1.5 rem/1.0 rem/hr Stay time = 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />.

COMMENTS:

ADMINISTRATIVE QUESTION PAGE 2 OF 2 EXAMINEES COPY TYPE: OPEN REFERENCE RO EXAM -- SUBJECT A.3 QUESTION 2:

A worker has been assigned the task of breaking Incore Flanges. The year to date dose for the worker is:

  • Committed Effective Dose Equivalent (CEDE) = 0.2 Rem
  • Shallow Dose Equivalent (SDE) = 0.6 Rem
  • Eye Dose Equivalent (LDE) = 0.7 Rem What is the maximum time the individual can work in the area and not exceed his administrative Total Effective Dose Equivalent (TEDE) limit with a 1 R/Hr gamma dose rate in the area?

ADMINISTRATIVE QUESTION PAGE 1 OF 2 TYPE: OPEN REFERENCE KA VALUE RO: 3.3 SRO: 3.1 KA

REFERENCE:

2.4.39

REFERENCES:

1903.030, Evacuation, Rev 024-01-0, Section 6.2.2 1903.066, Emergency Response Facility-Operational Support Center (OSC)

RO EXAM SUBJECT A.4 QUESTION 1:

As an off-shift RO assigned to the Steam Generator Replacement Team, you are escorting two red badge contract engineers to a meeting in the System Engineering Building.

The following announcement is heard over the plant page system:

Attention all personnel. A Site Area Emergency has been declared on Unit 2. A plant evacuation has been declared. All emergency response and emergency standby personnel report to your designated assembly areas immediately.

State the action(s) you would take, where and who you would report to?

ANSWER:

1. Return visitors to guard house and check them out for accountability (required).
2. Report to Operations Support Center (OSC) located in Maintenance Facility (required).
3. Check in with OSC Director or member of OSC staff. (optional)

COMMENTS:

ADMINISTRATIVE QUESTION PAGE 2 OF 2 EXAMINEES COPY TYPE: OPEN REFERENCE RO EXAM -- SUBJECT A.4 QUESTION 1:

As an off-shift RO assigned to the Steam Generator Replacement Team, you are escorting two red badge contract engineers to a meeting in the System Engineering Building.

The following announcement is heard over the plant page system:

Attention all personnel. A Site Area Emergency has been declared on Unit 2. A plant evacuation has been declared. All emergency response and emergency standby personnel report to your designated assembly areas immediately.

State the action(s) you would take, where and who you would report to?

ADMINISTRATIVE QUESTION PAGE 1 OF 2 TYPE: OPEN REFERENCE KA VALUE RO: 2.6 SRO: 4.0 KA

REFERENCE:

2.4.29

REFERENCES:

1903.010, EAL Classification, Rev 036-00-0, Step 4.16.1.B.

1903.010, EAL Classification, Rev 036-00-0, Attachment 4, 1.3, 1.4 RO EXAM -- SUBJECT A.4 QUESTION 2:

Given the following plant conditions:

  • Plant operating in Mode 3.
  • RCS leakage calculated at 62 gpm inside Containment.
  • Post SPTA brief in progress.

The Shift Superintendent states during the brief that an Alert EAL has been declared and the conditions for upgrade to Site Area Emergency (SAE) include greater than 1% failed fuel.

State two methods that could be used to determine when 1% failed fuel is exceeded?

ANSWER:

1. Nuclear Chemistry analysis of RCS Sample.
2. Containment Radiation Levels increasing.
3. Engineering assessment of core damage.

ADMINISTRATIVE QUESTION PAGE 2 OF 2 EXAMINEES COPY TYPE: OPEN REFERENCE RO EXAM -- SUBJECT A.4 QUESTION 2:

Given the following plant conditions:

  • Plant operating in Mode 3.
  • RCS leakage calculated at 62 gpm inside Containment.
  • Post SPTA brief in progress.

The Shift Superintendent states during the brief that an Alert EAL has been declared and the conditions for upgrade to Site Area Emergency (SAE) include greater than 1% failed fuel.

State two methods that could be used to determine when 1% failed fuel is exceeded?

ANO-2-JPM-NRC-STAFF01 PAGE 1 OF 6 ADMIN JOB PERFORMANCE MEASURE UNIT: 2 REV #: 000 DATE:

SYSTEM/DUTY AREA: Conduct Of Operations TASK: Determine Operating Staff Watchstanding Qualifications.

JTA#:

KA VALUE RO: 2.3 SRO: 3.4 KA

REFERENCE:

2.1.5 APPROVED FOR ADMINISTRATION TO: RO: SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: SIMULATOR: Perform LAB:

POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 10 Minutes REFERENCE(S): 1015.001, Conduct of Operation, Rev 052-00-0, 1063.020, Fire Brigade Training, Rev 013-00-0, 2OPD014, Fire Brigade Eligibility Memo, Watchstanding Proficiency Memo.

EXAMINEE'S NAME: SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED: DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

ANO-2-JPM-NRC-STAFF01 PAGE 2 OF 6 ADMIN JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS:

Mode 1 Full Power. Shift turnover just completed.

TASK STANDARD:

Candidate determines one CBOR qualified, CBOT NOT qualified, and WCO qualified as Fire Brigade Leader.

TASK PERFORMANCE AIDS:

1015.001, Conduct of Operation, Rev 052-00-0, 1063.020, 2OPD014, Proficiency Watch Qualifications.

Fire Brigade Eligibility Memo.

EXAMINER'S NOTE:

ANO-2-JPM-NRC-STAFF01 PAGE 3 OF 6 ADMIN JOB PERFORMANCE MEASURE INITIATING CUE:

You are the oncoming Control Room Supervisor of Crew F. Using appropriate references, determine that the below listed Control Room Watchstanders assigned to your operating crew are qualified to fill the positions assigned. (Include respirator qualifications/physicals, license status, watchstanding proficiency and fire brigade qualifications)

Denver Dennis - CBOR Steve Davis - CBOT Danny Reed - WCO and Fire Brigade Leader CRITICAL ELEMENTS (C): 8, 17, 25 PERFORMANCE CHECKLIST STANDARDS (Circle One)

1. Obtain Fire Brigade Quarterly Obtained Fire Brigade Quarterly N/A SAT UNSAT Memo. Memo notebook.
2. Locate Eligibility Sheet for Denver Located Eligibility Sheet for Denver N/A SAT UNSAT Dennis in Fire Brigade Quarterly Dennis in Fire Brigade Quarterly Memo. Memo.
4. Check respirator physical, training, Checked respirator physical, N/A SAT UNSAT fit test, classroom and practical training, fit test, classroom and factors expiration date against practical factors expiration date current date. against current date.
5. Obtain Unit 2 Licensed Personnel Obtain Operator Watchstanding N/A SAT UNSAT Active/Inactive Report Proficiency Report.
6. Locate Denver Dennis on Located Denver Dennis on N/A SAT UNSAT Active/Inactive Report and Active/Inactive Report and determine if Active/Inactive. determine Active Status.

7 Obtain Operator Watchstanding Obtain Operator Watchstanding N/A SAT UNSAT Proficiency Report. Proficiency Report.

8. Locate proficiency data for Denver Located proficiency data for Denver N/A SAT UNSAT Dennis in Proficiency Report. Dennis in Proficiency Report.
7. Determine Denver Denniss Determined Denver Denniss N/A SAT UNSAT proficiency requirements met. proficiency requirements met.

(7 eight hour or 5 twelve hour (7 eight hour or 5 twelve hour shifts shifts per calendar quarter) per calendar quarter)

(C) 8. Determine Denver Dennis qualified Determined Denver Dennis qualified N/A SAT UNSAT as Control Room Watchstander. as Control Room Watchstander.

ANO-2-JPM-NRC-STAFF01 PAGE 4 OF 6 ADMIN JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

9. Obtain Fire Brigade Quarterly Obtained Fire Brigade Quarterly N/A SAT UNSAT Memo. Memo notebook.
10. Locate Eligibility Sheet for Steve Located Eligibility Sheet for for N/A SAT UNSAT Davis in Fire Brigade Quarterly Steve Davis in Fire Brigade Memo. Quarterly Memo.
11. Check respirator physical, training, Checked respirator physical, N/A SAT UNSAT fit test, classroom and practical training, fit test, classroom and factors expiration date against practical factors expiration date current date. against current date.
12. Obtain Unit 2 Licensed Personnel Obtain Operator Watchstanding N/A SAT UNSAT Active/Inactive Report Proficiency Report.
13. Locate Steve Davis on Located Steve Davis on N/A SAT UNSAT Active/Inactive Report and Active/Inactive Report and determine if Active/Inactive. determine INACTIVE Status.
14. Obtain Operator Watchstanding Obtain Operator Watchstanding N/A SAT UNSAT Proficiency Report. Proficiency Report.
15. Locate proficiency data for Steve Located proficiency data for Steve N/A SAT UNSAT Davis in Proficiency Report. Davis in Proficiency Report.
16. Determine if Steve Daviss Determined Steve Daviss N/A SAT UNSAT proficiency requirements are met. proficiency requirements NOT met.

(7 eight hour or 5 twelve hour (7 eight hour or 5 twelve hour shifts shifts per calendar quarter) per calendar quarter)

(C) 17. Determine if Steve Daviss Determined Steve Davis is NOT N/A SAT UNSAT qualifications as CBOT are met qualified as a Control Room and if he is qualified as a Control Watchstander.

Room Watchstander.

18. Obtain Fire Brigade Quarterly Obtained Fire Brigade Quarterly N/A SAT UNSAT Memo. Memo notebook.
19. Locate Eligibility Sheet for Danny Located Eligibility Sheet for Danny N/A SAT UNSAT Reed in Fire Brigade Quarterly Reed in Fire Brigade Quarterly Memo. Memo.
20. Check respirator physical, training, Checked respirator physical, N/A SAT UNSAT fit test, classroom and practical training, fit test, classroom and factors expiration date against practical factors expiration date current date. against current date.

ANO-2-JPM-NRC-STAFF01 PAGE 5 OF 6 ADMIN JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

21. Check Danny Reeds Fire Brigade Checked Danny Reeds Fire Brigade N/A SAT UNSAT Leader Training, Quarterly Leader Training, Quarterly Training Training Class, Annual Practice Class, Annual Practice Class, and Class, and Annual Drill Annual Drill requirements are met.

requirements are met.

22. Obtain Operator Watchstanding Obtain Operator Watchstanding N/A SAT UNSAT Proficiency Report. Proficiency Report.
23. Locate proficiency data for Danny Located proficiency data for Danny N/A SAT UNSAT Reed in Proficiency Report. Reed in Proficiency Report.
24. Determine Danny Reeds Determined Danny Reeds N/A SAT UNSAT proficiency requirements met. proficiency requirements are met.

(eight hours per calendar quarter) (eight hours per calendar quarter)

(C) 25. Determine Danny Reed qualified Determined (WCO Name) qualified N/A SAT UNSAT as WCO and Fire Brigade Leader). as WCO and Fire Brigade Leader).

END

ANO-2-JPM-NRC-STAFF01 PAGE 6 OF 6 ADMIN JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

Mode 1 Full Power. Shift turnover just completed.

INITIATING CUE:

You are the oncoming Control Room Supervisor of Crew F. Using appropriate references, determine that the below listed Crew Watchstanders assigned to your operating crew are qualified to fill the positions assigned. (Include respirator qualifications/physicals, License status, watchstanding proficiency and fire brigade qualifications)

Denver Dennis - CBOR Steve Davis - CBOT Danny Reed - WCO and Fire Brigade Leader

JPM- ANO-2-JPM-NRC-PEREMG PAGE 1 OF 6 ADMIN JOB PERFORMANCE MEASURE UNIT: 2 REV #: 000 DATE:

SYSTEM/DUTY AREA: Conduct Of Operations TASK: Perform Personnel Emergency Checklist JTA#:

KA VALUE RO: SRO: 2.8 KA

REFERENCE:

2.1.16 APPROVED FOR ADMINISTRATION TO: RO: SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: Simulate SIMULATOR: Perform LAB:

POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 10 Minutes REFERENCE(S): 1903.023B, Rev 032-00-0; 1903.062 Rev 15 EXAMINEE'S NAME: SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED: DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

JPM- ANO-2-JPM-NRC-PEREMG PAGE 2 OF 6 ADMIN JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS:

100% steady state power operations. Report comes into control room that a mechanic (Joe McWrench) has fallen from the spiral staircase in the Unit 2 Auxiliary Building, North Piping Penetration Room and is currently located on the floor of the 335 elevation. The mechanic is unconscious and appears to have a fracture of his right leg, multiple bruises and a severe laceration on upper right arm.

TASK STANDARD:

Medical team notified by radio-voice pagers using base radio, fire tone actuated, announcement made using plant paging system, ANO Duty Nurse and ANO Physicians pagers activated.

TASK PERFORMANCE AIDS:

Form 1903.023B (Personnel Emergency Checklist), Paging Encoder Operation Instructions posted by Encoder.

Or 1903.062 (Communications System Operating Procedure) Step 7.6.1.E.

EXAMINER'S NOTE:

JPM- ANO-2-JPM-NRC-PEREMG PAGE 3 OF 6 ADMIN JOB PERFORMANCE MEASURE INITIATING CUE:

The SS/CRS directs, "Perform Personnel Emergency Checklist (Form 1903.023B) Steps 1 through 3 using the information provided."

CRITICAL ELEMENTS (C): 2, 4, 5, 7, 9, 10 PERFORMANCE CHECKLIST STANDARDS (Circle One)

1. Obtain Personnel Emergency Obtained copy of Personnel Emergency N/A SAT UNSAT Checklist (Form 1903.023B) Checklist (Form 1903.023B) from one of the following:
  • Get copy from procedure rack on Control Room wall.
  • Get 1903.023 from bookshelf in rear of Control Room and make copy.
  • Call up procedure on IDEAS and print copy of latest revision.

EXAMINERS NOTE:

If examinee elects to get procedure and make copy or use computer to print, provide copy of Form 1903.023B in package to expedite JPM.

(C) 2. Select Channel 1 on the radio Selected Channel 1 on the radio N/A SAT UNSAT console. console.

3. Verify SCRAMBLE OFF is Verified SCRAMBLE OFF is selected N/A SAT UNSAT selected on radio console. on radio console.

(C) 4. Select the response group needed Selected the MEDICAL button on the N/A SAT UNSAT from the Instant Call Keys on the Instant Call Keys on the Encoder.

encoder.

(C) 5. Verify that the appropriate Instant Verified the MEDICAL instant call N/A SAT UNSAT Call Key is selected, and press the key selected and pressed IC SEND IC SEND key. Wait for tones to key.

be transmitted.

Observed the red indicator flash indicating tones transmitted.

6. Momentarily depress and hold the Depressed the SIREN ALERT and N/A SAT UNSAT SIREN ALERT key. held down for two or three seconds.

(C) 7. Transmit the appropriate message. Depressed the microphone switch on N/A SAT UNSAT the base radio console and gave the following message:

ATTENTION EMERGENCY MEDICAL TEAM MEMBERS. A Personnel Emergency has occurred in the Unit 2 Auxiliary Building, North Piping Penetration Room, Elevation 335.

Emergency Medical Team members please respond.

JPM- ANO-2-JPM-NRC-PEREMG PAGE 4 OF 6 ADMIN JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

8. Momentarily press the page fire Depressed the page fire tone N/A SAT UNSAT tone push-button. pushbutton and held down for two or three seconds.

(C) 9. Using plant paging system, give Used plant paging system to make the N/A SAT UNSAT message to alert personnel to following announcement:

remain clear of the location of the ATTENTION ALL PERSONNEL, emergency.

ATTENTION ALL PERSONNEL. A PERSONNEL EMERGENCY has occurred in the Unit 2 Auxiliary Building, North Piping Penetration Room, Elevation 335. The EMERGENCY MEDICAL TEAM is responding. All personnel should stay clear of North Piping Penetration Room, Elevation 335.

(C) 10. Notify ANO Medical Department. Notified ANO Medical Department by N/A SAT UNSAT dialing the following pager numbers:

Positive Cue:

ANO Duty Nurse Pager 964-6076 Pagers have been activated.

ANO Physician Pager 964-3936 Simulator Phones will not allow the pager numbers to be dialed.

END

JPM- ANO-2-JPM-NRC-PEREMG PAGE 5 OF 6 ADMIN JOB PERFORMANCE MEASURE QUESTION:

ANSWER:

JPM- ANO-2-JPM-NRC-PEREMG PAGE 6 OF 6 ADMIN JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:

100% steady state power operations.

Report comes into control room that a mechanic (Joe McWrench) has fallen from the spiral staircase in the Unit 2 Auxiliary Building, North Piping Penetration Room and is currently located on the floor of the 335 elevation. The mechanic is unconscious and appears to have a fracture of his right leg, multiple bruises and a severe laceration on upper right arm.

INITIATING CUE:

The SS/CRS directs, "Perform Personnel Emergency Checklist (Form 1903.023B)

Steps 1 through 3 using the information provided."

JPM- ANO-2-JPM-NRC-EPLAN1 PAGE 1 OF 5 ADMIN JOB PERFORMANCE MEASURE UNIT: 2 REV #: 000 DATE:

SYSTEM/DUTY AREA: Emergency Procedure/Plan TASK: Determine Protective Action Recommendations for Radiological Release JTA#:

KA VALUE RO: SRO: 4.0 KA

REFERENCE:

2.4.44 APPROVED FOR ADMINISTRATION TO: RO: SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: Simulate SIMULATOR: Perform LAB:

POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 10 Minutes REFERENCE(S): 1903.011 Revision 025-03-0 EXAMINEE'S NAME: SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED: DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

JPM- ANO-2-JPM-NRC-EPLAN1 PAGE 2 OF 5 ADMIN JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS:

The plant was tripped due to a Loss of Coolant Accident with a 15% Fuel Clad Failure and samples indicate an extremely large amount of fission products present in the containment. A non-isolable release is in progress.

Wind Direction is from 170 degrees. The Dose assessor has provided the following RDACS report.

TASK STANDARD:

Determination by candidate that 2 and Par 3 should be combined and that the additional zones listed from the Dose Assessment report (RDACS) should be evacuated and the remainder of the 10-Mile EPZ should be sheltered.

TASK PERFORMANCE AIDS: of 1903.11, Protective Action Recommendations for General Emergency.

Dose Assessors report from RDACS EXAMINER'S NOTE:

JPM- ANO-2-JPM-NRC-EPLAN1 PAGE 3 OF 5 ADMIN JOB PERFORMANCE MEASURE INITIATING CUE:

The SS directs, "Determine the Protective Action Recommendations (PAR) using Attachment 6 of 1903.011, Emergency Response/Notifications and the Dose Assessors RDACS Protective Action Recommendation Report."

CRITICAL ELEMENTS (C): 6, 7, 9, 10, 11, 12, 13, 14, 15 PERFORMANCE CHECKLIST STANDARDS (Circle One)

1. Obtain Attachment 6 of 1903.011, Obtained Attachment 6 of 1903.011, N/A SAT UNSAT Emergency Response/Notifications. Emergency Response/Notifications from one of the following:
  • Get copy from the end rack of 2C69 procedure rack on Control Room wall.
  • Get 1903.011 from bookshelf in rear of Control Room and make copy.
  • Call up procedure on IDEAS and print copy of latest revision.

EXAMINERS NOTE:

If examinee elects to get procedure and make copy or use computer to print, provide copy of Attachment 6, Protective Action Recommendations for General Emergency.

Provide Candidate with Dose Assessors Report.

2. Using the Flow Chart, determine that Used initial conditions and determined N/A SAT UNSAT

>10% Fuel Clad Failure exists. that >10% Fuel Clad Failure exists.

Determined the YES decision path should be chosen.

3. Determine that a LOCA is in Used initial conditions and determined: N/A SAT UNSAT progress.
  • that a LOCA is in progress OR AND Containment Atmosphere sample
  • Containment Atmosphere sample indicates large amounts of fission indicated large amounts of fission products.

products.

Determined that the YES decision path should be chosen.

4. Determine if Containment Failure is Used initial conditions and determined N/A SAT UNSAT projected that Radiological Release is in progress.

OR Determined that the YES decision path should be chosen.

Radiological Release is in progress.

5. Determine if Release is in progress. Determined that the YES decision path N/A SAT UNSAT should be chosen.

JPM- ANO-2-JPM-NRC-EPLAN1 PAGE 4 OF 5 ADMIN JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

(C) 6. Using the RDACS Report provided Used the RDACS Report provided by N/A SAT UNSAT by the Dose Assessor, determine Dose Assessor to determine that the that the EPA Protective Guideline of EPA Protective Guideline of 5.0 Rem 5.0 Rem Child Thyroid is being Child Thyroid is being exceeded.

exceeded.

Determined that the YES decision path should be chosen.

(C) 7. Determine that Protective Action Determined that PAR 2 and 3 should be N/A SAT UNSAT Recommendations (PAR) 2 and 3 combined.

should be combined.

(C) 8. Determine from the Dose Assessors Determined that Zone G is projected to N/A SAT UNSAT report that Zone G is projected to exceed the EPA Protective Action exceed the EPA Protective Action Recommendations.

Guidelines and should be evacuated (C) 9. Determine, using PAR 2, and given Determined, using PAR 2, and given the N/A SAT UNSAT the current wind direction, that current wind direction, that Zones G, H, Zones G, H, K, M, N, O, P, R & U, K, M, N, O, P, R & U, should be should be evacuated and that the evacuated and that the rest of the EPZ rest of the EPZ should be sheltered. should be sheltered.

(C) 10. Combine the Zones from PAR No. 2 Combined the Zones from PAR No. 2 N/A SAT UNSAT and the Dose Assessors Report and and the Dose Assessors Report and make the recommendation that Zones made the recommendation that Zones G, G, H, K, M, N, O, P, R & U be H, K, M, N, O, P, R & U be evacuated evacuated and the remainder of the and the remainder of the EPZ be EPZ be sheltered. sheltered.

END

JPM- ANO-2-JPM-NRC-EPLAN1 PAGE 5 OF 5 ADMIN JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:

The plant was tripped due to a Loss of Coolant Accident with a 15% Fuel Clad Failure and samples indicate an extremely large amount of fission products present in the containment. A non-isolable release is in progress. Wind Direction is from 170 degrees.

General Emergency has been declared. The Dose assessor has provided the following RDACS report.

INITIATING CUE:

The SS directs, "Determine the Protective Action Recommendations using Attachment 6 of 1903.011, Emergency Response/Notifications and the Dose Assessors RDACS Report."

ADMINISTRATIVE QUESTION PAGE 1 OF 2 TYPE: OPEN REFERENCE KA VALUE RO: 2.7 SRO: 3.2 KA

REFERENCE:

2.3.11

REFERENCES:

OP2104.014, LRW and BMS Operations Rev 032-00-0, Step 5.4.

Unit 2 Technical Specifications 3.11.1, Liquid Holdup Tanks.

SRO EXAM -- SUBJECT A.3 QUESTION 1:

Due to the overhaul of the Unit 2 Turbine Generator during 2R14, a temporary tool and parts decontamination facility has been set up on the Unit 2 Turbine Deck near the train bay access.

Liquids from the facility are being collected in a 500 gallon poly tank located on Elevation 354 in the train bay.

Chemistry analysis performed on a sample from the tank indicates the following isotopic content:

Cr-51 2.225E6 µci Mn-54 1.455E6 µci Co-58 1.382E6 µci Fe-59 3.551E6 µci Sr-92 1.413E6 µci What action(s), if any, are required and what are the bases for the action(s)?

ANSWER:

1. Immediately suspend all additions of radioactive material to the affected tank.
2. Within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> reduce tank contents to < 10 curies.
3. Based on Tech Spec 3.11.1, (Radioactive Effluents, Liquid Holdup Tanks).

COMMENTS:

ADMINISTRATIVE QUESTION PAGE 2 OF 2 EXAMINEES COPY TYPE: OPEN REFERENCE SRO EXAM -- SUBJECT A.3 QUESTION 1:

Due to the overhaul of the Unit 2 Turbine Generator during 2R14, a temporary tool and parts decontamination facility has been set up on the Unit 2 Turbine Deck near the train bay access.

Liquids from the facility are being collected in a 500 gallon poly tank located on Elevation 354 in the train bay.

Chemistry analysis performed on a sample from the tank indicates the following isotopic content:

Cr-51 2.225E6 µci Mn-54 1.455E6 µci Co-58 1.382E6 µci Fe-59 3.551E6 µci Sr-92 1.413E6 µci What action(s), if any, are required and what are the bases for the action(s)?

ADMINISTRATIVE QUESTION PAGE 1 OF 2 TYPE: OPEN REFERENCE KA VALUE RO: 2.5 SRO: 3.1 KA

REFERENCE:

2.

3.4 REFERENCES

1903.033 Rev 017-01-0, Protective Action Guidelines For Rescue/Repair & Damage Control Team, Step 6.1.3 SRO EXAM -- SUBJECT A.3 QUESTION 2:

Determine whose authorization is required to exceed dose limits of 10CFR20 for the given conditions?

  • Large Break LOCA has occurred.
  • RAS has actuated.
  • Estimated dose is 6.1 Rem to isolate the leak.
  • EAL was declared 75 minutes ago.
  • Emergency Response Organization is fully staffed.

ANSWER:

TSC Director COMMENTS:

ADMINISTRATIVE QUESTION PAGE 2 OF 2 EXAMINEES COPY TYPE: OPEN REFERENCE SRO EXAM -- SUBJECT A.3 QUESTION 2:

Determine whose authorization is required to exceed dose limits of 10CFR20 for the given conditions?

  • Large Break LOCA has occurred.
  • RAS has actuated.
  • Estimated dose is 6.1 Rem to isolate the leak.
  • EAL was declared 75 minutes ago.
  • Emergency Response Organization is fully staffed.