Summary of Revised Regulatory Commitment
ML092580087
Person / Time
Site: Salem  PSEG icon.png
Issue date: 09/03/2009
From: Braun R
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LR-N09-0205
Download: ML092580087 (3)


Text

PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge,NJ 08038-0236 SEP 032009 0 PSEG LR-N09-0205 Nuclear L.L. C.

U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-001 Salem Generating Station, Units 1 and 2 Facility Operating License Nos. DRP-70 and DRP-75 NRC Docket Nos. 50-272 and 50-311

Subject:

Summary of Revised Regulatory Commitment - Salem In accordance with the Nuclear Energy Institute (NEI) process for managing Nuclear Regulatory Commission (NRC) commitments and associated NRC notifications, PSEG Nuclear LLC (PSEG) submits this correspondence to discuss an additional commitment that was changed and not reported by other means during 2008.

The attached commitment was evaluated in accordance with the requirements of PSEG's Regulatory Commitment Change Process, which is consistent with the guidance in NEI 99-04, "Guideline for Managing NRC Commitments." Additional documentation is available for your review.

There are no new commitments in this letter.

If there are any questions, please contact Howard Berrick at 856-339-1862.

Sincerely, Robert C. Braun Site Vice President - Salem Attachments (1)

Document Control Desk LR-N09-0205 2

SEP 0 3 2009 C

S. Collins, Administrator - Region 1 R. Ennis, Project Manager - USNRC D. Schroeder - USNRC Senior Resident Inspector - Salem P. Mulligan, Manager, IV, Bureau-of Nuclear Engineering H. Berrick, Salem Commitment Coordinator - X25 L. Marabella, Corporate Commitment Coordinator - N21

Attachment Page 1 of 1 LR-N09-0205 Revised Commitment Description Justification For Change Original Commitment:

Tables A.2-2, A.2-3, A.4-1, A.4-4, A.4-5, and A.4-6 of PSEG Nuclear's response to mitigating strategies for B.5.b phase 2 and 3 contained the following description

"... charged via diesel driven fire pump(s)."

The phrase "...charged via diesel driven fire pump(s)." is being changed to "...normally charged via diesel driven fire pump(s)."

The Fire Protection header is only required to be charged to implement Table A.4-4 "Manually Depressurize SGs and Use Portable Pump" and Table A.4-6 "Containment Flooding with Portable Pump" to meet the Engineering calculations associated with the B.5.b Strategies. Table A.4-4 "Manually Depressurize SGs and Use Portable Pumps" requires a charged header and the use of 3.00-inch Fire Hose. Table A.4-6 "Containment Flooding with Portable Pump" requires a charged header when using 2.50-inch Fire Hose.

All other B.5.b Strategies can be accomplished in a timelier manner and more safely, utilizing the Salem or Hope Creek Fire pumps, if available.

System Engineering calculations justify this change.

Source Document:

LR-N07010127 dated June 04, 2007, Attachment 1.

Reference:

70088783; 80096177 Date of Change:

09/15/08 I