LR-N05-0475, Technical Specification Bases Change Hcn 05-028

From kanterella
Jump to navigation Jump to search
Technical Specification Bases Change Hcn 05-028
ML052700381
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 09/16/2005
From: Benyak D
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
HCN 05-028, LR-N05-0475
Download: ML052700381 (4)


Text

PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge. New Jersey 08038-0236 0%PSEG LR-N05-0475 NulaWL NuclearLLC TS Bases Change HCN 05-028 SEP 1 6 2005 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 TECHNICAL SPECIFICATION BASES CHANGE HCN 05-028 HOPE CREEK GENERATING STATION FACILITY OPERATING LICENSE NPF-57 DOCKET NO. 50-354 PSEG Nuclear, LLC (PSEG) has revised the Bases for Technical Specification (TS) 3/4.8. This change was reviewed in accordance with the requirements of the TS Bases Control Program and 10 CFR 50.59.

TS Bases 3/4.8 is being changed to maintain consistency with the Hope Creek Updated Final Safety Analysis Report. contains revised page 3/4 8-1 d for the Hope Creek TS Bases. In accordance with the TS Bases Control Program, PSEG has incorporated this change into the Bases.

Should you have any questions regarding this transmittal, please contact Mr. Paul Duke at (856) 339-1466.

Sincerely, Darin Benyak Director - Regulatory Assurance Attachment A/CD) 95-2168 REV. 7/99

Document Control Desk SEP 1 6 2005 LR-N05-0475 C Mr. S. Collins, Administrator - Region I U. S. Nuclear Reguiatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. S. Bailey, Project Manager U. S. Nuclear Regulatory Commission Mail Stop 08B1 Washington, DC 20555 USNRC Senior Resident Inspector - Hope Creek (X24)

Mr. K. Tosch, Manager IV Bureau of Nuclear Engineering PO Box 415 Trenton, NJ 08625

Attachment I LR-N05-0475 TS Bases Change HCN 05-028 HOPE CREEK GENERATING STATION FACILITY OPERATING LICENSE NPF-57 DOCKET NO. 50-354 REVISION TO THE TECHNICAL SPECIFICATIONS BASES Page B 3/4 8-Id

3/4.8 ELECTRICAL POWER SYSTEMS BASES (Continued)

Particulate concentration should be determined in accordance with ASTM D2276-94, Method A. This method involves a gravimetric determination of total particulate concentration in the fuel oil and has a limit of 10 mg/l. The 0.8 micron filters specified in ASTM D2276-94 may be replaced with membrane filters up to 3.0 microns. This is acceptable since the closest tolerance fuel filter in the HC EDGs is a five micron particle retention duplex filter on the engine driven fuel oil pump. It is acceptable to obtain a field sample for subsequent laboratory testing in lieu of field testing. The total volume of stored fuel oil contained in two or more interconnected tanks must be considered and tested separately. The frequency of this test takes into consideration fuel oil degradation trends that indicate the particulate concentration is unlikely to change significantly between frequency intervals.

The OPERABILITY of the minimum specified A.C. and D.C. power sources and associated distribution systems during shutdown and refueling ensures that (1) the facility can be maintained in the shutdown or refueling condition for extended time periods and (2) sufficient instrumentation and control capability is available for monitoring and maintaining the unit status.

With exceptions as noted in the Hope Creek UFSAR, the surveillance requirements for demonstrating the OPERABILITY of the diesel generators comply with the recommendations of Regulatory Guide 1.9, "Selection, Design, and Qualification of Diesel Generator Units Used as Standby (Onsite) Electrical Power Systems at Nuclear Power Plants", Revision 2, December, 1979, Regulatory Guide 1.108, "Periodic Testing of Diesel Generator Units Used as Onsite Electric Power Systems at Nuclear Power Plants", Revision 1, August 1977 and Regulatory Guide 1.137 "Fuel-Oil Systems for Standby Diesel Generators",

Revision 1, October 1979 as modified by plant specific analysis, diesel generator manufacturer's recommendations, and Amendment 59, to the Facility Operating License, issued November 22, 1993.

HOPE CREEK B 3/4 8-1d TSBC HCN 05-028