LIC-02-0123, Submittal of Fort Calhoun Station Inservice Inspection Program Plan for Fourth Ten-Year Interval

From kanterella
Jump to navigation Jump to search
Submittal of Fort Calhoun Station Inservice Inspection Program Plan for Fourth Ten-Year Interval
ML023190502
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 11/05/2002
From: Ridenoure R
Omaha Public Power District
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LIC-02-0123
Download: ML023190502 (2)


Text

OmahaPublic Power District 444 South 16th Street Mall Omaha NE 68102-2247 November 5, 2002 LIC-02-0123 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

References:

1. Docket No. 50-285
2. American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI, 1998 Edition (through 2000 Addenda)
3. ASME OM Code 1998 Edition (through 2000 Addenda), Code for Operation and Maintenance of Nuclear Power Plants

SUBJECT:

Submittal of the Fort Calhoun Station (FCS) Inservice Inspection (ISI)

Program Plan for the Fourth Ten-Year Interval (2003-2013)

Pursuant to the requirements of 10 CFR 50.55a and the Reference 2 ASME Code, Omaha Public Power District (OPPD) submits the FCS ISI Program Plan for the plant's fourth 120-month inspection interval commencing on September 26, 2003. The FCS ISI Program Plan incorporates the requirements of the ASME Section XI Code (1998 Edition, through 2000 Addenda) for NDE examinations and repair/replacement, and the O&M Manual (1998 Edition, through 2000 Addenda) for pump and valve testing.

OPPD requests that the NRC complete review of this plan prior to July 1, 2003 to allow OPPD sufficient preparation for implementation. OPPD intends to implement the FCS ISI Program Plan for the fourth 120-month internal on September 26, 2003.

No commitments are made to the NRC in this letter.

If you have any questions or require additional information, please contact Dr. R. L. Jaworski at (402) 533-6833.

Sincerely, 0 r*

Divisi ager

)Nude Operations/Site Coordinator

.Tlr l P TI Employment with Equal Opportunity 4171

U. S. Nuclear Regulatory Commission LIC-02-0123 Page 2 Attachments: 1. Fourth Interval Inservice Inspection Program Plan

2. Pump and Valve Inservice Testing Program Plan - Fourth Ten-Year Interval (Revision 0) c: E. W. Merschoff, NRC Regional Administrator, Region IV (w/o enclosure)

A. B. Wang, NRC Project Manager J. G. Kramer, NRC Senior Resident Inspector (w/o enclosure)

Division Administrator - Public Health Assurance, State of Nebraska (w/o enclosure)

Winston & Strawn (w/o enclosure)