LIC-02-0100, Transmittal of Changes to Radiological Emergency Response Plan (RERP)

From kanterella
Jump to navigation Jump to search
Transmittal of Changes to Radiological Emergency Response Plan (RERP)
ML022410112
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 08/15/2002
From: Ridenoure R
Omaha Public Power District
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LIC-02-0100
Download: ML022410112 (1)


Text

UH.IU Omaha PublicPower Djstnct 444 South 16th Street Mall Omaha NE 68102-2247 August 15, 2002 LIC-02-0100 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

Reference:

Docket No. 50-285

SUBJECT:

Transmittal of Changes to Radiological Emergency Response Plan (RERP)

In accordance with 10 CFR 50.54(q), 10 CFR 50, Appendix E, Section V, and 10 CFR 50.4(b)(5), please find RERP change packages enclosed for the Document Control Desk (holder of Copy 165) and the NRC Region IV Plant Support Branch Secretary (holder of Copies 154 and 155).

The document update instructions and summary of changes are included on the Confirmation of Transmittal form (Form EP-1) attached to each controlled copy change package. Please return the Confirmation of Transmittal forms by October 8, 2002.

The revised documents included in the enclosed package are:

RERP Index page 1 -2 issued 08/08/02 RERP Section G R 1I issued 08/08/02 RERP Section H R30 issued 08/08/02 If you have any questions regarding the enclosed changes, please contact Mr. Carl Simmons at (402) 533 6430.

Sincerely, c: NRC Region IV Plant Support Branch Secretary (2 sets)

Alan Wang, NRC Project Manager (w/o enclosures)

J. G. Kramer, NRC Senior Resident Inspector (w/o enclosures)

Winston & Strawn (w/o enclosures)

Emergency Planning Department (w/o enclosures)

Employment with Equal Opportunity 4171