LIC-02-0093, Report of Full Compliance with Requirements of Interim Safeguards & Security Compensatory Measures Order

From kanterella
Jump to navigation Jump to search
Report of Full Compliance with Requirements of Interim Safeguards & Security Compensatory Measures Order
ML022480037
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 09/03/2002
From: Ridenoure R
Omaha Public Power District
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LIC-02-0093
Download: ML022480037 (2)


Text

Omaha Public PowerDistnct 444 South 16th Street Mall Omaha NE 68102-2247 September 3, 2002 LIC-02-0093 U. S. Nuclear Regulatory Commission ATTN.: Document Control Desk Washington, DC 20555

References:

1. Docket No. 50-285
2. Letter from NRC (Samuel L. Collins) to OPPD (W. Gary Gates), dated February 25, 2002, Issuance of Order for Interim Safeguards and Security Compensatory Measures for - Fort Calhoun Station, Unit 1 (NRC-02-027)
3. Letter from OPPD (Ross T. Ridenoure) to NRC (Document Control Desk),

dated March 15, 2002, Response To Commission Order To Modify License For Interim Safeguards And Security Measures (LIC-02-0025)

4. Letter from OPPD (Ross T. Ridenoure) to NRC (Document Control Desk),

dated March 15, 2002, Answer To Commission Order To Modify License For Interim Safeguards And Security Measures (LIC-02-0030)

5. Letter from OPPD (Ross T. Ridenoure) to NRC (Document Control Desk),

dated April 26, 2002, Clarification of Omaha Public Power District's Response To Commission Order To Modify License For Interim Safeguards And Security Measures (LIC-02-0050)

6. Letter from OPPD (Ross T. Ridenoure) to NRC (Document Control Desk),

dated May 17, 2002, Withdrawal of Request for Hearing on Interim Safeguards and Security Compensatory Measures Order (LIC-02-0064)

7. Letter from OPPD (Ross T. Ridenoure) to NRC (Document Control Desk),

dated August 20, 2002, Additional Mitigative Measures to Fulfill Requirements of Interim Safeguards and Security Compensatory Measures A :Order Requirement B.2(a)2 (LIC-02-0091)

8. Letter from OPPD (Ross T. Ridenoure) to NRC (Document Control Desk),

dated August 26, 2002, Report of Negative Response from Maritime Authority concerning Order Requirement B. .b (LIC-02-102)

SUBJECT:

Report of Full Compliance with the Requirements of the Interim Safeguards and Security Compensatory Measures Order VReferences 3, 4, 5, 6, 7, and 8 detailed Omaha Public Power District's (OPPD) responses to the requirements of Reference 2 for Fort Calhoun Station Unit No. I (FCS). Reference 2 requires that implementation of the requirements shall be complete by August 31, 2002 and that Licensees shall report when they have achieved full compliance with the requirements of Employment with Equal Opportunity "Po 4171

U. S. Nuclear Regulatory Commission LIC-2-0093 Page 2 Reference 2. As of August 31, 2002, OPPD has achieved full compliance with all of the requirements of Reference 2 at FCS.

No commitments are made to the NRC in this letter. If you have additional questions, or require further information, please contact Dr. R. L. Jaworski at (402) 533-6833.

Sincerely, oss T. Ridenoi re u

)ivision Mann* er- ulear Operations RTR/TRB/tri c: tte L. Vietti-Cook, Secretary, NRC Office of the Secretary, Rulemakings and Adjudications Staff Samuel Collins, Director, NRC Office of Nuclear Reactor Regulation Dennis C. Dambley, NRC Assistant General Counsel for Materials Litigation and Enforcement E. W. Merschoff, NRC Regional Administrator, Region IV (two copies)

Glen Tracy, Chief, NRC Operator Licensing, Human Performance and Plant Support Branch A. B. Wang, NRC Project Manager J. G. Kramer, NRC Senior Resident Inspector Nuclear Energy Institute Winston and Strawn