MONTHYEARL-2024-001, Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements2024-01-26026 January 2024 Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-PI-23-034, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water (Cl) System,2024-01-0202 January 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water (Cl) System, L-PI-23-035, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report2023-12-20020 December 2023 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-174, Subsequent License Renewal Application - Third Annual Update2023-12-13013 December 2023 Subsequent License Renewal Application - Third Annual Update L-PI-23-033, Supplement to License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 32023-12-0505 December 2023 Supplement to License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 L-2023-176, Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-159, Part 3 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 3 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks and Security Event Notifications Final Rule L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point L-PI-23-025, License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 32023-09-28028 September 2023 License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 L-2023-128, License Amendment Request to Revise TS 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program2023-09-19019 September 2023 License Amendment Request to Revise TS 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program L-PI-23-023, Baffle Former Bolts Alternate Aging Management Strategy2023-09-11011 September 2023 Baffle Former Bolts Alternate Aging Management Strategy L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2023-089, Refueling Outage Owner'S Activity Report (OAR-1) Unit 2 for Inservice Inspections2023-07-24024 July 2023 Refueling Outage Owner'S Activity Report (OAR-1) Unit 2 for Inservice Inspections L-PI-23-018, License Amendment Request to Revise ISFSI Technical Specification 4.4 to Allow Use of a Code Alternative to ASME Code, NB-5130, Examination of Weld Edge Preparation Surfaces, for the TN-40HT2023-07-14014 July 2023 License Amendment Request to Revise ISFSI Technical Specification 4.4 to Allow Use of a Code Alternative to ASME Code, NB-5130, Examination of Weld Edge Preparation Surfaces, for the TN-40HT L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) L-2023-088, 10 CFR 50.55a Requests, Relief Requests I6-RR-1, I6-RR-2, and I6-RR-3 Sixth Ten-Year Inservice Inspection Program Interval2023-06-27027 June 2023 10 CFR 50.55a Requests, Relief Requests I6-RR-1, I6-RR-2, and I6-RR-3 Sixth Ten-Year Inservice Inspection Program Interval L-PI-23-006, License Amendment Request to Revise Technical Specification 3.7.8 Required Actions2023-06-22022 June 2023 License Amendment Request to Revise Technical Specification 3.7.8 Required Actions L-PI-23-016, 2022 10 CFR 50.46 LOCA Annual Report2023-06-14014 June 2023 2022 10 CFR 50.46 LOCA Annual Report L-2023-075, Response to Request for Additional Information (RAI) Regarding Exemption Request, License Amendment Request and Revised Response in Support of a Risk-Informed Resolution of Generic Letter 2004-022023-06-0909 June 2023 Response to Request for Additional Information (RAI) Regarding Exemption Request, License Amendment Request and Revised Response in Support of a Risk-Informed Resolution of Generic Letter 2004-02 L-2023-073, Subsequent License Renewal Application, Second Annual Update Request for Additional Information Set 1 Response2023-06-0101 June 2023 Subsequent License Renewal Application, Second Annual Update Request for Additional Information Set 1 Response L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal L-PI-23-010, Annual Report of Individual Monitoring2023-04-27027 April 2023 Annual Report of Individual Monitoring L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 L-2023-058, 2022 Annual Monitoring Report2023-04-10010 April 2023 2022 Annual Monitoring Report L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations L-2023-021, Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-03-28028 March 2023 Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update L-PI-23-007, Supplement to Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)2023-03-28028 March 2023 Supplement to Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2023-048, Core Operating Limits Report (COLR) Cycle 40 (U2C40)2023-03-18018 March 2023 Core Operating Limits Report (COLR) Cycle 40 (U2C40) L-2023-025, Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-12023-03-15015 March 2023 Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-1 L-2023-029, and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)2023-03-10010 March 2023 and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-PI-23-005, CFR 50.55a Requests Nos. 1-RR-5-15 and 2-RR-5-15, Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv)2023-03-0303 March 2023 CFR 50.55a Requests Nos. 1-RR-5-15 and 2-RR-5-15, Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv) L-2023-036, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2023-02-24024 February 2023 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections L-2023-011, Response to Requests for Additional Information (Rais) Regarding License Amendment Request 297, Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk Informed2023-02-21021 February 2023 Response to Requests for Additional Information (Rais) Regarding License Amendment Request 297, Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk Informed L-PI-23-001, Day Steam Generator Tube Inspection Report2023-01-30030 January 2023 Day Steam Generator Tube Inspection Report L-PI-22-047, Resubmittal of Prairie Island Nuclear Generating Plant (PINGP) 2018 Unit 1 180-Day Steam Generator Tube Inspection Report2022-12-21021 December 2022 Resubmittal of Prairie Island Nuclear Generating Plant (PINGP) 2018 Unit 1 180-Day Steam Generator Tube Inspection Report L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 L-2022-185, Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-12-0909 December 2022 Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-PI-22-020, Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)2022-12-0202 December 2022 Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) L-2022-177, Subsequent License Renewal Application - Second Annual Update2022-11-28028 November 2022 Subsequent License Renewal Application - Second Annual Update L-2022-180, CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2022-11-0909 November 2022 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2022-168, and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2022-10-26026 October 2022 and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report L-2022-161, U1R40 Steam Generator Tube Inspection Report2022-10-13013 October 2022 U1R40 Steam Generator Tube Inspection Report L-PI-22-040, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-10-0606 October 2022 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections L-2022-160, Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-10-0404 October 2022 Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 2024-01-26
[Table view] |
Text
Committed to Nuclear Excellence
/ Nuclear Management Company, LLC January 30,2007 L-HU-07-003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Prairie Island Nuclear Generating Plant, Palisades Nuclear Plant Units 1 and 2 Docket 50-255 Dockets 50-282 and 50-306 License No. DPR-20 License Nos. DPR-42 and DPR-60 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 License Nos. DPR-24 and DPR-27 Inspection and Mitigation of Allov 600/82/182 Pressurizer Butt Welds
Reference:
NEI letter to NSlAC dated January 19, 2007 In October of 2006, while performing inspections of its pressurizer Alloy 600/82/182 butt welds in accordance with MRP-139, a PWR licensee discovered several circumferential indications in its pressurizer surge, safety, and relief nozzles. Because of the potential importance of this issue, NMC is submitting this letter to commit to fleet actions taken or planned for inspecting or mitigating Alloy 600/82/182 butt welds on pressurizer spray, surge, and relief lines.
Enclosures to this letter, including the information for each of the affected NMC sites, are as follow:
Enclosure I- Palisades Nuclear Plant (PNP) - Point Beach Nuclear Plant (PBNP) - Prairie Island Lluclear Generating Plant (PINGP) 700 First Street Hudson, Wisconsin 54016 Telephone: 715.377.3300 a Fax: 715.386.1013
Document Control Desk Page 2 Summary of Commitments This letter contains two new commitment and no revisions to existing commitments.
Palisades and Prairie Island Unit 2 Only
- 1. Until all Alloy 600/82/182 Pressurizer butt welds are either mitigated or replaced, all Alloy 600/82/182 Pressurizer butt welds will be examined per the industry guidance on Alloy 600/82/182 butt welds (MRP-139).
- 2. Until all Alloy 600/82/182 Pressurizer butt welds are either mitigated or replaced, reports of future inspection results will be submitted to the NRC within 60 days of #theend of the station refueling outage during which the inspection was performed.
C
_s
_-.--.-l.
I"^ .-.-
DOU~IASE. Cooper Senior vice President and Chief Nuclear Officer Nuclear Management Co., LLC
Enclosures:
(3) cc: Administrator, Region Ill, USNRC Project Manager, Palisades, Point Beach and Prairie Island, USNRC Resident Inspector, Palisades, Point Beach and Prairie Island, USNRC
ENCLOSURE 1 PALISADES NUCLEAR PLANT lnspection of all pressurizer Alloy 600/82/182 butt welds at Palisades has not yet been completed. NMC intends to complete these inspection activities by the refueling outage scheduled for September 2007 (R019). Details concerning the inspection activities at Palisades are provided in the attached table. Results of completed inspections are also summarized in the table. Future inspections of pressurizer butt welds at Palisades will be performed in accordance with the IS1 program, the ASME Code, and industry guidance on Alloy 600/82/182 butt welds (MRP-139). Until all Alloy 600/82/182 Pressurizer butt welds are either mitigated or replaced, reports of future inspection results will be submitted to the NRC within 60 days of the end of the station refueling outage during which the inspection was performed.
In addition to the inspection actions described here, existing procedures for monitoring primary system unidentified leakage will be used until all Alloy 600/82/182 butt weld locations on the pressurizer have been inspected or mitigated. Steady state RCS leakage is measured and compared to Technical Specification limits (1.0 gpm unidentified leakage). The measurement is also compared to a procedural limit of 0.15 gpm total unidentified leakage. By procedure, an investigation is initiated when this 0.15 gpm unidentified leakage limit is exceeded. The intent of this investigation is to locate and assess the source of the unidentified RCS leakage.
lnspection and Mitigation Summary for Alloy 600/82/182 Pressurizer Butt Welds Mitigation MRP-139 Volumetric lnspection Nozzle Completed or to be Requirement Met or t o be Met Completed ResultslComments Function I Susceptible Material Outage Date Designation Description Outage Designation Designation (MMNYW)
Nozzle-to safe end Each of the welds (Nozzle-to safe end weld, A600 weld, A600 safe end, safe end, and safe end-to-elbow weld) have been Spray R017 0912004 NIA and safe end-to-Elbow examined with ultrasonic testing (UT) every other weld outage since 1995.
Nozzle-to safe end Mechanical Stress Improvement Process (MSIP) weld, A600 safe end, was applied to the safe end-to-pipe weld in 1995.
Surge and safe end-to-Elbow R018 0412006 Roll Each of the welds (nozzle-to safe end weld, A600 weld safe end, and safe end-to-elbow weld) have been examined with UT every other outage since 1995.
Alloy 821182 weld and Radiography Testing (RT) & Dye-Penetrant (PT) of Safety A600 Flange R019 0912007 NIA the ID & OD surfaces was performed in 1993. PT RV-1039 and UT examinations were also performed in 1995.
Safety Alloy 821182 weld and Radiography Testing (RT) & Dye-Penetrant (PT) of A600 Flange R019 0912007 NIA the ID & OD surfaces was performed in 1993.
RV-1040 Alloy 821182 weld and Radiography Testing (RT) & Dye-Penetrant (PT) of Safety A600 Flange R019 0912007 NIA the ID & OD surfaces was performed in 1993. PT RV-1041 and UT examinations were also performed in 1995.
No A6001821182 Safe end welds replaced with Alloy 690 material in PORV NIA NIA Roll 1995.
Page 1 of 1
ENCLOSURE 2 POINT BEACH NUCLEAR PLANT UNITS 1 AND 2 The pressurizers at Point Beach Units 1 & 2 do not have Alloy 600/82/182 butt welds.
Future inspections of pressurizer butt welds at Point Beach Units 1 & 2 will be performed in accordance with the IS1 Program, the ASME Code, and industry guidance (MRP-139).
Page 1 of 1
ENCLOSURE 3 PRAIRIE ISLAND NUCLEAR GENERATING PLANT (UNIT I ONLY)
The pressurizer at Prairie Island Unit 1 does not have Alloy 600/82/182 butt welds.
Future inspections of pressurizer butt welds at Prairie Island Unit 1 will be performed in accordance with the IS1 Program, the ASME Code, and industry guidance (MRP-139).
Page 1 of 2
ENCLOSURE 3 PRAIRIE ISLAND NUCLEAR GENERATING PLANT (UNIT 2 ONLY)
The pressurizer Alloy 600/82/182 butt weld at Prairie Island Unit 2 has been inspected. Details concerning the location inspected are provided below. Results of completed inspections are also included below. Future inspections of the pressurizer butt welds at Prairie Island Unit 2 will be performed in accordance with the IS1 Program, the ASME Code and industry guidance (MRP-139). Until the Alloy 600/82/182 Pressurizer butt weld is either mitigated or replaced, reports of future inspection results will be submitted to the NRC within 60 days of the end of the station refueling outage during which the inspection was performed.
lnspection and Mitigation Summary for Alloy 600/82/182 Pressurizer Butt Welds Nozzle I MRP-139 Volumetric lnspection Requirement Met or t o be Met I Mitigation Completed or t o be completed I
ResultslComments Susceptible Function I Outage Start Date Outage Material Designation Designation (MMNYYY) Designation Descri~tion Spray No A6001821182 NIA NIA NIA NIA Surge Alloy 82 The surge line W-17 weld was examined using ultrasonic testing (UT) during the November 2006 RFO (2R24). The examination was PDI qualified and achieved
>95% coverage.
Current plans are to mitigate this location via weld overlay during the (2R25) 2008 refueling outage or continue with inspections based on guidance provided in MRP-139.
Safety X No A600/82/182 NIA NIA NIA NIA Safety Y No A6001821182 NIA NIA NIA NIA Relief - Z No A6001821182 NIA NIA NIA NIA Relief - T No A6001821182 NIA NIA NIA NIA Page 2 of 2