L-97-277, Provides Initial FP&L Response to GL 97-04, Assurance of Sufficient Net Suction for ECC & Containment Heat Removal Pumps. Licensee Will Provide Requested Info by 980331
| ML17229A517 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 11/04/1997 |
| From: | Stall J FLORIDA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| GL-97-04, GL-97-4, L-97-277, NUDOCS 9711120237 | |
| Download: ML17229A517 (8) | |
Text
CATEGORY 1 REGULA
.Y INFORMATION DISTRIBUTIO YSTEM (RIDS)
ACCESSION NBR:9711120237 DOC.DATE: 97/11/04 NOTARIZED: YES FACIL:50-335 St. Lucie Plant, Unit'1, Florida Power 6 Light Co.
50-389 St. Lucie Plant, Unit 2, Florida Power
& Light Co.
AUTH.NAME AUTHOR AFFILIATION STALL,J.A.
Florida Power 8 Light Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Provides initial FPEL response to GL 97-04, "Assurance of Sufficient Net Suction for ECC 6 Containment Heat Removal Pumps."
Licensee will provide requested info by 980331.
DISTRIBUTION CODE:
A001D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: OR Submittal:
General Distribution NOTES:
DOCKET ¹ 05000335 05000389 E
RECIPIENT ID CODE/NAME PD2-3 LA WIENS,L.
INTERNAL: ACRS NRR/DE/ECGB/A NRR/DRCH/HICB NRR/DSSA/SRXB OGC/HDS3 COPIES LTTR ENCL RECIPIENT ID CODE/NAME PD2-3 PD NR CB NRR/DSSA/SPLB NUDOCS-ABSTRACT COPIES LTTR ENCL 0
R EXTERNAL: NOAC NRC PDR D
0 NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)
ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED.:
LTTR 14 ENCL
0 0
I l
4 '
Florida Power 5 Light Company. 6351 S. Ocean Drive, Jensen Beach, FL 34957 November 4, 1997 L-97-277 10 CFR 50.4 10 CFR 50. 54 (f)
U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 RE:
St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 This letter provides the initial Florida Power and Light Company (FPL) response to Generic Letter (GL) 97-04, Assurance ofSufhcient Net Positive Suction Head for Emergency Core Cooling and Containment Heat Removal Pumps, for St. Lucie Units 1 and 2. The GL requested an initial response within 30 days of the date of the GL stating whether or not the requested information would be submitted, and whether or not the requested information willbe submitted within the requested time period.
As a result of recent inspection activities, licensee notifications, and licensee event reports (LER),
the NRC has identified a safety-significant issue that has generic implications and warrants action by the NRC to ensure that the issue is adequately addressed and resolved.
The issue is that the net positive suction head (NPSH) available for the emergency core cooling system (ECCS)
(including core spray and decay. heat removal) and containment heat removal pumps may not be adequate under all design-basis accident scenarios.
Licensees were requested to review the current design-basis analyses used to determine the available NPSH for ECCS and containment heat removal pumps that meet either of the following criteria:
(1) pumps that take suction from the containment sump or suppression pool following a design-basis LOCA or secondary line break, or (2) pumps used in "piggyback" operation that are necessary for recirculation cooling of the reactor core and containment (that is, pumps that are supplied by pumps which take suction directly from the sump or suppression pool).
FPL will provide the requested information for St. Lucie Units 1 and 2, but not within the requested time period.
St. Lucie Unit 1 commenced a steam generator replacement outage on October 20, '1997.
The outage duration, which is currently scheduled for 75 days, willhave a significant impact on the available Engineering resources.
Accordingly, FPL willprovide the 0
97iii20237 97ii04 llllfllllllllllllllIfIfIIIIf flIIffflIl'
St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 L-97-277 Page 2 This response is provided pursuant to the requirements of Section 182a of the Atomic Energy Act of 1954, as amended, and 10 CFR 50.54(f).
Please contact us ifthere are any questions about this submittal.
Very truly yours, J. A. Stall Vice President St. Lucie Plant JAS/GRM cc:
Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant
4"
r
~
~
St. Lucie Units I and 2 Docket Nos. 50-335 and 50-389 L-97-277 Page 3 STATE OF FLORIDA
)
)
COUNTY OF ST. LUCIE
)
ss.
J. A. Stall being first duly sworn, deposes and says:
That he is Vice President, St. Lucie Plant, for the Nuclear Division of Florida Power &Light Company, the Licensee herein; That he has executed the foregoing document; that the statements made in this document are true and correct to the best of his knowledge, information and belief, and that he is authorized to execute the document on behalf of said Licensee.
J. A. Stall STATE OF FLORIDA COUNTY OF Sworn to and subscribed before me this "IHt day of rtl f, 19 I I by y. A. Stall, who is personally known to me.
Name of No lic - State of Florida olloloI Less@ J. Wg~
- a!:ass MYCOhRSS!QH ty (gg~~83 ~REs MSy u,200>
"Hinih' ytttttiTttoy fAIMI@gggf the.
(Print, type or stamp Commissioned Name of Notary Public)
I I
4 II I,