L-93-203, Forwards Turkey Point Plant Unit 4 1993 Inservice Insp Rept
| ML17352A198 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 08/20/1993 |
| From: | Plunkett T FLORIDA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML17352A199 | List: |
| References | |
| L-93-203, NUDOCS 9308260306 | |
| Download: ML17352A198 (4) | |
Text
~CCKr.mm XZD DOmrvrmr D>STamm j:OX SVSXZrvr REUULATC INFORMATION DISTRIBUTION+STEM (RIDS)
ACCESSION NBR:9308260306 DOC.DATE: 93/08/20 NOTARIZED: NO DOCKET FACIL::50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION PLUNKETT,T.F.
Florida Power
& Light Co.
5~
RECIP.NAME RECIPIENT AFFILIATION R~<
Document Control Branch (Document Control Desk)
SUBJECT:
Forwards "Turkey Point Plant Unit 4 1993 Inservice Insp Rept."
C D
DISTRIBUTION CODE: A047D COPIES RECEIVED-LTR g ENCL 1
SIZE-TITLE: OR Submittal: Inservice/Testing/Relief from ASME Code S
NOTES:
RECIPIENT ID CODE/NAME PD2-2 LA RAGHAVAN,L INTERNAL: AEOD/DSP/ROAB NRR/EMCB OC REG LE 01 EXTERNAL EG &G BROWN I B NRC PDR COPIES LTTR ENCL 1
0 2
2 1
1 1
1 1
0 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD2-2 PD NRR/DE/EMEB NUDOCS-ABSTRACT OGC/HDS3 RES/DSIR/EIB EG&G RANSOME,C NSIC COPIES LTTR ENCL 1
1 1
1 1
1 1
0 1
1 1
1 1
1 A
D D
D NOTE TO ALL"RIDS" RECIPIENTS PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 {EXT.504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR'DOCUMENTS YOU DON'T NEED!
D TOTAL NUMBER. OF COPIES REQUIRED:
LTTR 16 ENCL 13
I II gi L,
la
AUG 20 tGSg L-93-203 10 CFR 50.55a U. S. Nuclear Regulatory Commission Attn:
'Document Control Desk Washington, D. C.
20555 Gentlemen:
Re:
Turkey Point Unit 4
Docket No. 50-251 Inservice Ins ection Re ort Attached are the following reports for Turkey Point Unit 4 in accordance with the provisions of the ASME Code, Section XI:
Form NIS-1 Owners'ata Report for Inservice Inspections.
Form NIS-BB Owners'ata Report of Eddy Current Examinations.
Form NIS-2 Ownezs'ata Report of Repairs and Replacements.
Summary of Visual Examinations and Functional Testing of Snubbers.
Summary of Inservice Inspection Examinations.
Final Report of Hydrostatic Testing Program.
Should there be any questions concerning this report, please contact us.
Very truly yours, T.
F'. Plunkett Vice President Turkey Point Nuclear TFP/OIH/oh attachment cc:
Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant
-9308260306 930820 PDR ADOCK 0500025i 8
iy li
't piP V