L-90-276, Advises That NIS-1 & NIS-2 Forms,As Part of Inservice Insp Rept,Will Be Submitted by 900831

From kanterella
(Redirected from L-90-276)
Jump to navigation Jump to search
Advises That NIS-1 & NIS-2 Forms,As Part of Inservice Insp Rept,Will Be Submitted by 900831
ML17223A862
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 07/25/1990
From: Sager D
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-90-276, NUDOCS 9007310235
Download: ML17223A862 (4)


Text

ACCELERATED DI RIBUTION DEMONST ATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9007310235 DOC.DATE: 90/07/25 NOTARIZED: NO FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power

& Light Co.

AUTH.NAME AUTHOR AFFXLIATION SAGER,D.A.

Florida Power

& Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

DOCKET 05000335

SUBJECT:

Advises that NXS-1

& NXS-2 forms, as part of inservice insp rept, will be submitted by 900831.

DISTRIBUTION CODE:

A047D COPIES RECEIVED:LTR J ENCL 0 SIZE:

TITLE: OR Submittal: Inservice Inspection/Testing/Relief from ASME ode NOTES RECIPIENT ID CODE/NAME PD2-2 LA NORRIS,J INTERNAL: ACRS NRR/DET/ECMB 9H NUDOCS-ABSTRACT OGC/HDS2 RES/DSXR/EIB EXTERNAL: EG&G BROWN,B LPDR NSIC COPIES LTTR ENCL RECIPIENT ID CODE/NAME PD2-2 PD AEOD/DSP/TPAB NRR/DET/EMEB 9H OC/LFJg3 EGG ILE 0

EG&G RANSOME E C NRC PDR COPIES LTTR ENCL NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 26 ENCL

~,

l,

P.O. Box14000, Juno Beach, FL 33408-0420 JUL 25 l990 L-90-276 10 CFR 50.55a U. S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, DC 20555 Gentlemen:

r jL 'p Re:

St. Lucie Unit 1 Docket 50-335 Inservice Ins ection Re ort ASME

Code,Section XI, (IWA-6300) requires that Inservice Inspection (ISI)

Summary Reports (Forms NIS-1 and NIS-2) be submitted within 90 days after ISI completion.

The administrative review of the NIS-2 forms has not been completed, due in part, to the plant ISI manpower required to support the current St. Lucie Unit 1 outage.

The NIS-1 and NIS-2 forms will be submitted by August 31, 1990.

This schedule change has been discussed with the NRC Project Manager for St. Lucie.

Very truly yours, D. A.

ger Vice esident St.

u ie Plant DAS:LLM:kw cc:

Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant DAS/PSL 5220 5'0073l0235 900725 t