L-88-462, Informs That Util Anticipates Completing Actions Identified in Insp Followup Items by 890630,based on NRC Approving CEN-152,Rev 3 by 890331,per Insp Rept 50-389/88-08

From kanterella
(Redirected from L-88-462)
Jump to navigation Jump to search
Informs That Util Anticipates Completing Actions Identified in Insp Followup Items by 890630,based on NRC Approving CEN-152,Rev 3 by 890331,per Insp Rept 50-389/88-08
ML17222A550
Person / Time
Site: Saint Lucie 
Issue date: 10/20/1988
From: Conway W
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
L-88-462, NUDOCS 8810250168
Download: ML17222A550 (2)


Text

~CCEm~~-kNSWNXN5..I V@@kN~R @'~>>

DOCKET ¹ 05000335 05000389

SUBJECT:

Informs that util anticipates completing actions identified in insp followup items by 890630.

DISTRIBUTION CODE:

IEOID COPIES'ECEIVED:LTR I

ENCL Q SIZE:

TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:

ACCESSION NBR:8810250168 DOC.DATE: 88/10/20 NOTARIZED: NO FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power S Light Co.

50-389 St. Lucie Plant, Unit 2, Florida Power S Light Co.

AUTH.NAME AUTHOR AFFILIATION ONWAYiW.F.

Florida Power

& Light Co.

SP-dg'IP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

. D P

RECIPIENT ID CODE/NAME PD2-2 PD INTERNAL: ACRS DEDRO NRR/DLPQ/PEB 11 NRR/DOEA DIR 11 NRR/DREP/RPB 10 NRR/PMAS/ILRB12 OE L RMANsJ 02 RGN2 FILE 01 NAL: LPDR NSIC COPIES LTTR ENCL 2

1 1

1 2

1 1

1 1

RECIPIENT ID-CODE/NAME TOURIGNYiE AEOD NRR MORISSEAU,D NRR/DLPQ/QAB 10

'RR/DREP/EPB 10 NRR/DRIS DIR 9A NUDOCS-ABSTRACT OGC/HDS2 RES/DSR DEPY NRC PDR COPIES LTTR ENCL h:

D TOTAL NUMBER OF COPIES REQUIRED:

LTTR 24 ENCL

P. O. BOX 14000, JUNO 86ACh, F4.:".'.i:.

OCTOBER 2 0 1988 L-88-462 U.

S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, D.

C.

20555 Gentlemen:

Re:

St. Lucie Units 1 and 2

Docket Nos.- 50-'335 and 50-389 Inspection Report 88-08 Ins ector Followu Items Pursuant to NRC letter (J.

N.

Grace to W.

F.

Conway) dated August 26,

1988, and discussions with Mr. Lawyer of NRC Region II, Florida Power & Light Company (FPL) has reviewed the subject Inspector Followup Items (IFI).

Based on this review, FPL anticipates completing the actions identified in IFIs 389/88-08-01, 389/88-08-02, 389/88-08-03, and 389/88-08-04 by June 30, 1989.

This scheduled date is based on NRC approving CEN-152, Revision 3 by March 31, 1989.

It should be noted that the above schedule implies FPL's completion of actions identified in these IFIs within 3 months of the NRC's approval of CEN-152, Revision 3.

FPL's action completion will slip accordingly if NRC approval of CEN-152, Revision 3 is delayed beyond the March 30, 1989 date.

Very truly yours, W. F.

Conwa Senior Vice resident

- Nuclear WFC/GRM/cm cc:

Malcolm L. Ernst, Acting Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant GRMIFI 8810250168 881020 PDR ADOCK 05000335 8