L-88-133, Forwards Monthly Operating Repts for Feb 1988 & Revised Operating Data Repts for Jan 1988

From kanterella
(Redirected from L-88-133)
Jump to navigation Jump to search
Forwards Monthly Operating Repts for Feb 1988 & Revised Operating Data Repts for Jan 1988
ML17347A711
Person / Time
Site: Saint Lucie, Turkey Point, 05000000
Issue date: 03/15/1988
From: Conway W
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML17347A693 List:
References
L-88-133, NUDOCS 8803250313
Download: ML17347A711 (2)


Text

P. O.

14000, JUNO BEACH, FL 33408-0420 MARCH 5

1988 L-88-133 U. S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, D.

C.

20555 Gentlemen:

RE:

Turkey Point Units 3 and 4

Docket Nos.

50-250 and 50-251 St. Lucie Units 1 and 2

Docket Nos.

50-335 and 50-389 Monthl 0 eratin Re ort Attached are the February 1988 Operating Status Reports and Summary of Operati'ng Experience Reports for Turkey Point Units 3

and 4,

and St.

Lucie Units 1 and 2.

Also attached are corrected copies of. January 1988 Operating Data Report for Turkey Point Units 3 and 4 and St.

Lucie Units 1 and 2.

These corrected copies provide information on the cumulative data that had been incorrectly submitted.

Very truly yours, W. F.

C nway Actin Group Vice President Nuclear Energy-WFC/NWG/pw Attachments cc:

Dr. J. Nelson Grace, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant Senior Resident Inspector, USNRC, St. Lucie Plant NWG/001.MOR

'8803250313, 880315 PDR

.ADOCK 05000250 I

R

'PDR P

/I PEOPLE... SERVING PEOPLE

0 Il