ML17347A692
| ML17347A692 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie, Turkey Point, 05000000 |
| Issue date: | 02/29/1988 |
| From: | Grant N FLORIDA POWER & LIGHT CO. |
| To: | |
| Shared Package | |
| ML17347A693 | List: |
| References | |
| NUDOCS 8803210463 | |
| Download: ML17347A692 (32) | |
Text
.~EE DAILY UNIT PURER LEVEL ~
DOCKET NO.
50-250 UNIT Turke Point Unit 3 DATE March 15, 1988 CONPLETED BY N.M. Grant TELEPHONE 305 694-4432 N)NTH Februar 1988 DAY AVERA6E DAILY POMER LEVEL (N Qe-Net) 2/ 1/88 2/ 2/88 2/ 3/88 2/ 4/88 2/ 5/88 2/ 6/88 2/ 7/88 2/
8/88'/9/88 2/10/88 2/11/88 2/12/88 2/13/88 2/14/88 2/15/88 2/16/88 2/17/88 2/18/88 2/19/88 2/20/88 2/21/88 2/22/88 2/23/88 2/24/88 2/25/88 2/26/88 2/27/88 2/28/88 2/29/88
-5
-5
-5
-5
-7
-10
-11
-15
-15
-16
-17
-17
-17 "19
-19
-19
-19
-19
-19'28 188 462 671 680 689 694 688 686 8803210463 880229'PDR ADOCK 05000250 R
Ol
h QPFRATING STATUS QF'Ef"ATXNG DATA REF'ORT DOCKET NO 50 250 DATE 3/14/88 COMPLETED BY Ni H, GRANT TELEF'HONE 305/694/4432 1.
UNTT NAME: TURKEY POINT UNIT 3 2.
RFF'ORTING PERIOD:
FEBRUARY 1988 3.
LICENSED THERMAL F'OWER (MWT):
2200 4
o NAMEF'l ATE RATING (GROSS MWE)
'o 760 5.
DESIGN ELECTRICAL RATING (NET MHE):
693 6
MAXIMUM DEF'ENDABLE CAF'AC1TY (GROSS'HE):
699 7.
MAXIMUM DEPENDABLE CAF'ACITY (NET MWE)'66
- 8. IF CHANGES OCCUR XN CAF'ACITY RATINGS (1TEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT'~
GIVE REASONS i 9,
POWER LEVEL TO WHICH RESTRICTED~ IF ANY (NET MHE) lei REASONS FOR RESTRICTIONS> IF ANY:
MONTHLY
-YTD-CUMULATiVE ii. l-lOURS IN, REF'ORT PERIOD'Z, NUMBER OF HOURS REACTOR WAS CRXTICAL 13.
REACTOR RESERVE SHUTDOWN HOURS 14 o l-lOURS GENERATOR ON-LINE 15.
UNIT RESERVE SHUTDOWN HOURS lb.
GROSS THERMAL ENERGY GENERATED (MHH>
17+
GROSS ELECTRICAL ENERGY GENERATED (MHH)
'l'S.
NET ELECTRICAL ENERGY GENERATED (MWH)
UNIT SERVICE FACTOR 20+
UNIT AVAILABILITYFACTOR 21.
CAF'ACITY FACTOR (USING MDC NET>
ZZ+
CAPACITY FACTOR (USING DER NET) 23.
UNIT FORCED OUTAGE RATE 24.
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS
- 696, 210i5 OoO 189i4 0
370671 120325 106581 27 '
27'+ 2 23+0 22'o 1 72o8 anne 5iii9 OiO 469oi 0
389041 280685 254512 32o6 32i6
'26)5 25o5 67o4 133569+6 38487o6 844.4 87304.2 121i8 180693304 57878686 54733293 65i4 65i5 62+9 59ii 11i2 25 o IF SHUT DOWN AT END'F REPORT PERIOD ~
ESTIMATED DATE OF STARTUP o
0 0
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH February 1988 DOCKET NO.
Turkey Point Unit 83 DATE Harch 15, 1988 COMPLETED By~5.
2 No.
Date Type'uration (Hours)
Reason~
Method of Shutting Down Reactor Ucensee Event Report ¹ System Code~
Component Codes Cause &Corrective Actionto Prevent Recurrence 02 880113 F
506. 5 RB CRDRVE Unit 83 remained shutdown to repair the "C" reactor coolant pump seal, a leaking uAu residual heat removal pump seal 5 a failed gate filter module card on the battery chargers, to perform maintenance on the source range detectors, and to perform several other minor repairs and adjustments.
Following completion of these items the unit was returned to power operation, holds were experienced at 305 power for secondary chemistry and again at 50$
power to make control rod position indication adjustments.
F Forced S Scheduled Reason A - Equipment Ftulure (Explain)
B - Maintenance orTest C - Refueling D - Regulatory Restriction E - Operator Training &Ucense Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)
Method 1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Load Reduction 9 - Other (Explain)
ExhibitG-!nstructhns forPreparation ofData Entry Scheets Ucensee Event Report(LER) Rle, (NUREG4161)
Exhibit 1-Same Source
0
aUMMARYOF OPERATING EXPER CE DOCKET,'NO.
UNIT DATE COMPLETED BY TELEPHONE 50-250'urkey Point Uni;t ¹3 ttarch 15, 1988 N.
W. Grant (305)694-4432 REPORT MONTH
- February, 1988 See the '"Unit Shutdowns and Power Reductions" report.
II 4l
AVERAGE DAILY UNIT PURER LEVEL DOCKET NO.
50-251, UNIT Turke Point Uni't 4 DATE March 15, 1988 CONPLETED BY TELEPHONE N.M. Grant MONTH
- February, 1988 DAY.',AVERAGE DAILY POMER LEVEL
'N We-Net) 2/ 1/88 2/ 2/88 2/ 3/88 2/ 4/88 2/ 5/88 2/ 6/88 2/ 7'/88 2/ 8/88 2/ 9/88 2/10/88 2/ii/88 2/12/88 2/13/88 2/14/88 2/15/88 2/16/88 2/17/88'/18/88 2/19/88 2/28/88 2/21/88'/22/88.
2/23/88 2/24/88 2/25/88 2/26/88 2/27/88 2/28/88 2/29/88 657 697 696
- 693, 683 676 503 ii
-8
-7
-1 2
-2
<<7
-1'2,
-12
-12
-12 13
-16
-15 12 168 618 705 705 704
Ot
OPERATING DATA REF'QRT OPERATING STATUS DOCKET NO 50 251 DATE 3/14/88 CQMPLErED BY N.: W.
GRANT TFLEF'HONE 305/694/4432
- i. UNIT NAME: TURKEY POINT UNIT 2>>,
REPORTING PERIOD>>
FEBRUARY 1988 3>>
LICENSED THERMAL,F'ONER <MAT):
2200 NAMEPLATE RATING (GROSS MME):
760 5.
DESIGN El ECTRICAL RATING (NET MME)>>
693 6 ~
MAXIMUM DEPENDABL'E CAF'ACITY ( GROSS MME)>>'99 7.
MAXIMUM DEPENDABLE CAF'ACITY (NET MME):
666
- 8. IF CHANGES OCCUR XH CAF'ACITY RATINGS (1TEMS NUMBER 3 THROUGH 7)
SINCE LAST REF'QRT r GIVE REASONS>>
9.
POWER LEVEL TO WHICH RESTRICTED~ IF ANY (NET MME) 10.
REASONS FOR RESTRICTIONS v IF ANY>>
MONTHLY
-YTD-CUMULATIVE 11
~
HOURS XN REF'ORT F'ERIQD
2.
NUMBER OF HOURS REACTOR HAS CR1TICAL 13.
REACTOR RESERVE SHUTDOMN HOURS HOURS GENERATOR OH-LINE 15>>
UNXT RESERVE SHUTDOWN. HOURS 16>>
'GROSS THERMAL ENERGY GENERATED (MHH) 17>>
GROSS ELECTRICAL ENERGY GENERATED
< MHH) 18>>
NET ELECTR1CAL FNERGY GENERATED (MMH) 19>>
UNXT SERVICE FACTOR
- 20. 'NXT AVAILABILITYFACTOR 21>>
CAF'ACXTY FACTOR (USING MDC NET) 22, CAF'ACITY FACTOR
<USING DER NET) 23>>
UNXT FORCED OUTAGE RATE 24>>
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 696
,292>>3 0>>0 282>>5 9
575809 189335 175903 40>>6 40>>6 37>>9 36>>5 59>>3 1440 1036>>3 0>>0 1026>>5 0
2208360 730175 692539 71>>3 71>>3 72.2 69>>4 28>>7 127301>>0 86222.8 166>>6 83232.6 32>>1 175663983 56029939 53011321 65>>4 65>>4 63>>9'0>>
1 li>>1 25>>
ZF SHUT DOWN AT EHD OF REPORT PERIOD r ESTIMATED DATE OF STARTUP ~
Cl 4l
Page 1 of 2 UNIT SHUTDOWNS AND POWER REDUCTIONS
- February, 1988 DOCKET NO.
50-251 UNiTNAMF Turkey Point Unit iI 4 March 15, 1988 COMPLETED BY N.
W. Grant TELEPHONE
( 305) 694-4432 Date Ttrpe'uration (Hours)
Reason2 Method of Shutting Down Reactor Ucensee Event Report¹ System Codei Component Codes Cause 8 Corrective Acthnto Prevent Recurrence 01 02 03 880201 880205 880207 0.0 0.0 412. 3 A
HA XXXXXX HA XXXXXX 251-88-003 EC BATTRY Unit iII4 reduced power to adjust the turbine Governor impeller oil adjustable orifice due to a turbine governor impeller oil pressure problem.
The reactor was then returned to power operatiorf; The Unit again reduced power for adjustments to the turbine governor impeller oil adjustable orifice, due to a turbine governor impeller oil pressure problem.
The reactor was then returned to power.
A reactor shutdown was performed due to the loss of the 4A and 4S battery chargers caused by the failure of the gate filter module card.
While the unit was down work was also performed on the B RCP notor and the CRDM cables.
F Forced S Scheduled Reason A-Equipment Failure (Exphln) 8 - Maintenance orTest C - Refuelng D - Reguhtory Restrkthn E - Operator Training 8 Ucense Examination F - Admlnhtratlve G - Operathnal Error (Exphln)
H - Other (Exphln)
Method 1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Load Reduction 9 - Other (Exphin) 4 ExhibitG-Instructions forPreparation ofData Entry Scheets Ucensee Event Report(LER) Re (NUBEG-D161)
Exhibit 1-Same Source
4l
Page 2 of 2 UNIT SHUTDOWNS AND POWER REDUCTIONS
- February, 1988 DOCKET NO.
50- 251 Turkey Point Unit i%4 DATE March 15, 1988 COMPLETED BY N.
W. Grant TELEPHONE
~305) 694-4432 No.
Date Type Duration (Hours)
Reason~
Method of Shutting Down Reactor Ucensee Event Reporting System Code i Component Codes Cause &Corrective Actionto Prevent Recurrence 04 880224 F
0.0 HA TURBIN A power reduction was initiated to allow for performance of the turbine overspeed test.
Following completion of this test the unit was returned to power operation at which time a hold was experienced
't 30'5 power due to secondary side chemistry.
F Forced S Scheduled Reason A - Equipment Failure(Exphln)
B - Maintenance orTest C - Refueling D - Reguhtory Restriction E - Operator Training &License Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)
Method 1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Load Reduction 9 - Other(Exphin)
ExhibitG-Instructions forPreparation ofData EntryScheets Licensee Event Report(LER) File (NUREG4161)
Exhibit1-Same Source
MMARYOF OPERATING EXPERI CE DOCKET NO.
UNIT
-DATE COMPLETED:BY TELEPHONE 50-251',
Turkey, Point Un~t 84 March 15, 1988
'N.
W. Grant (305) 694-4432 REPORT MONTH
- February, 1988 See the "Unit Shutdowns and Power Reductions." report.
0 4>>
.'AA6E OAILY UNIT PURER LEVEL ~
DOCKET NO.
UNIT DATE CONPLETED BY TELEPHONE 50-335 St.
Luci March 15, 1988 N.lf. Grant
- February, 1988 DAY AVERAGE DAILY PINER LEVEL (N Qe-'Net) 2/ 1/88.,
.2/ 2/88 2'/ 3/88 2/ 4/88 2/ 5'/88 2/ 6/88 2/ 7/88 2/ 8/88 2/ 9/88 2/10/88 2/11/88 2/12/88 2/13/88 2/14/88 2/15/88 2/16/88 2/1'7/88 2/18/88 2/19/88 2/20/88 2/21/88 2/22/88
.2/23/88 2/24/88
.2/25/88 2/26/88 2/27/88 2/28/88'/29/88 864 S62 860 S60 859 864 867'69 847 85669
'S69 S7,1 869'69 867 866 865 862.
- S63, S62 864 863 861 863 866 867
'868 865
41
OPERATING STATUS OF'ERATXHG DATA REF'ORT DOCI(ET HO bO 33&
DATE 3/14/88 COMPLETED BY N<<'o GRANT TELEF'HONE 305/694/4432 1.
UNIT NAME:
ST.
LUCXE UNIT 2
~
REF'ORT1HG PERIOD:
FEBRUARY 1988 3.
LICENSED THERMAL POWFR (MWT):
2700' AMEF'LATE RATING
( GROSS MWE ):
850 DESIGN ELECTRICAL RATING (NET MWE);
830 6
MAXIMUM DEF'ENDABLE CAF'ACXTY
( GROSS'WE)'72 7.
MAXIMUM DEPENDABLE CAPACITY (NET MWE):
839 8+ IF CHANGES OCCUR XN CAF'ACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SXHCE LAST REPORTS GIVE REASONS'OWER LEVEL TO WHICH RESTRICTED ~
XF ANY (NET MWE) 10.
REASONS FOR RESTRICTIONS'F AHY:
MONTHLY
-YTD-CUMULATIVE 11.
HOURS IN REF'ORT PERIOD t 12.
NUMBER OF HOURS REACTOR WAS CRITICAL 13m REACTOR RESERVE SHUTDOWN HOURS 14+
HOURS GENERATOR'N-LINE 15.
UNIT RESERVE SHUTDOWN HOURS ihi GROSS THERMAL ENERGY GENERATED (MWH) 17.
GROSS ELECTRICAL ENERGY GENERATED
<MWH) 18+
NET ELECTRICAL ENERGY GENERATED (MWH) 19, UNIT SERVICE FACTOR 20 i UHIT AVAILABXLITYFACTOR 21.
CAPACITY FACTOR (USXNG MDC NET) 22, CAPACITY FACTOR (USXNG DER NET) 23 o
UNIT FORCED OUTAGE RATE 24, SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 696 696i0 OiO 696+0 0
1877156 63271'8 601389 lee,+ e 100+0 103'o 0 104+1 0
1440 144eiO OiO 1440oO 0
3884263 1309600 1244268 10eoO 100iO 103iO 104+1 0
98112iO 72984o4 205o3 72409o9 39+3 185231933 60832585 57445427 73+8 73o8 73+2 71.8 3o9 25 i IF SHUT DOWN AT END OF REPORT PERIOD v ESTIMATED DATE OF STARTUP i
!I
.II
UNlT SHUTDOWNS AND POWER REDUCTlONS REPORT MONTH DOCKET NO.
UNITNAME
- t. Lucie Unit ¹1 rs DATE Ha rch 15, 1988 COMPLETED BY TELEPHONE
~305'94-443~
Date Type Duration (Hours)
Reason2 Method of Shutting Down Reactor Ucensee Event Report¹ System Code4 Component odes Cause &Corrective Actionto Prevent Recurrence Unit dl had no shutdowns or signifi- ~
cant power reductions.
F Forced S Scheduled Reason A-EquipmentFailure(Explain)
B - Maintenance orTest C - Refueling D - Regulatory Restriction E - Operator Training 8 Ucense Examination F - Administrative G - OperationaIError (Explain)
H - Other(Explain) 3 Method 1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Load Reduction 9 - Other(Explain) 4 ExhibitG-instructions forPreparation ofData EntryScheets Ucensee Event Report(LER) File (NUREG4161)
Exhibit1-Same Source Og 1sgl
~
~
MMARY'OFOPERATING EXPER CE DOCKET NO.
UNIT
,DATE COMPLETED BY TELEPHONE 50-335 St.
Lucie Unit ¹I triarch 15, 1988 N.
W. Grant (305) 694-4432 REPORT. MONTH'ebruary, 1988 Unit ¹1 operated at essentially full power.
and had no "Unit shut-downs or significant power, reductions."
In accordance with requirements of Technical Specifications 6.9. 1.6, there were no challenges to PORV or safety valves during the report month.
ORA66 'DAILV URIT PINER. LEVEL ~
DOCKET NO.
50-389 NIT St Lucie Unit 2 DATE March 15, 1988 CONPLETED SY, N.M.
TELEPNNE 305 694-4432
- February, 1988 OAY AVERA6E DAILY POMKR LEVEL (N Qe-Net) 2/ 1/88 2/ 2/88 2/ 3/88 2/ 4/88 2/ 5/88 2/ 6/88 2/'/88 2/ 8/88 2/ 9/88 2/10/88 2/11/88 2/12/88 2/13/88'/14'/88 2/15/88 2/16/88'/17/88 2/18/88 2/19/88 2/28/88 2/21/88 2/22/88 2/23/88 2/24/88 2/25/88.
2/26/88 2/27/88 2/28/88 2/29/88 865 864 864 863 863 863 867 S66 868 868
'868 868 870 869 869 867
'867 866 865 865 864
'843'41 864 865 867 868 868
'868
OPERATING STATUS OF'ER*TING DATA REF'ORT DOCKET NO 50 38'9 DATE 3/14/88 COMPLETED BY Ni W+
GRANT TELEF'HONE 305/694/4432
}. +
UNTT NAMEt ST+
LUCZE UNIT 2 REF'ORTING PERIOD:
FEBRUARY 1988 3.
LICENSED THERHAL POWER (HWT):
2700 NAMEF'LATE RATING (GROSS MWE) o 850
'o DESIGN ELECTRICAL RATING (NET MWE) +
830 6,
MAXIMUM DEF'ENDABLE CAPACITY (GROSS HWE):
882 7.
HAXIHUM DEPENDABLE CAPACITY (NET HWE)'39 8, IF CHANGES OCCUR IN CAF'ACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT
~
GIVE REASONS'OWER LEVEL TO WHICH RESTRICTED IF ANY (NET HWE) 10, REASONS FOR RESTRICTIONS IF ANY:
MONTHLY
-YTD-CUMULATIVE 11, HOURS IN REF'ORT PERIOD:
12 o
NUMBER OF HOURS REACTOR WAS CRITICAL 13.
REACTOR RESERVE SHUTDOWN HOURS 14 o HOURS GENERATOR ON-LINE 15 o UNIT RESERVE SHUTDOWN HOURS 16+
GROSS THERMAL ENERGY GENERATED (MWH) 17.
GROSS ELECTRICAL ENERGY GENERATED (MWH) 18.
NET ELECTRICAL ENERGY GENERATED (MWH) 19.
UNIT SERVICE FACTOR "8, UNIT AVAILABILITYFACTOR.
CAF'ACITY FACTOR (USING MDC NET)'2.
C*F'ACITY FACTOR (USING DER NET) 23m UNIT FORCED OUTAGE RATE 24>
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS o
696 696i8 8+0 696i8 8
1876508 633310 601719 180+8 108i8 183' 104i2 0
1440 1448iO 8iO 1440+8 0
3881805 1309540 1244179 180i8 108i0 103i8 184+1 0
40009.0 34198+0 OiO 33477.6 0
86878445 28998200 27411967 83o7 83o7 84o2 83' 8
25, IF SHUT DOWN. AT END OF REF'ORT PERIOD~
ESTIMATED DATE OF STARTUP:
41 II
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT NAME DATE St Lucie Unit ¹g March 15, 1988 REPORT MONTH Februar 1988 COMPLETED BY N.
W. Grant TEI EPHONF (305 694-4432 No.
Date Type'uration (Hours)
Reason~
Method of Shutting Down Reactor Ucensee Event Report¹ System Code4 Component Codes Cause &Corrective Actionto Prevent Recurrence Unit ¹2 had no shutdowns or signifi-cant power reductions.
F Forced S Scheduled Reason A - Equipment Failure(Explain)
B - Maintenance orTest C - Refueling D - Reguhtory Restriction E - Operator Training &LIcense Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)
Method 1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Load Reduction 9 - Other(Explain)
ExhibitG-Instructions forPreparation ofData Entry Scheets Licensee Event Report(LER) Fde, (NUREG4161)
Exhibit1-Same Source
4>
f
WMMARYOF OPERATING EXPER CE DOCKET'NO.
UNIT DATE COMPLETED"BY TELEPHONE 50-389.
St Lucie Unit ¹2 March 15
. 1988 N.
W. Grant 305 694-4432 REPORT MONTH'ebruary, 1988 Unit ¹2 operated at essentially. full power and had no "Unit shut-downs or significant power reductions."
In accordance with requirements of Technical Specifications 6.9. 1..6, there were no challenges to PORV or safety valves during the report, month.
II
~
.