L-87-477, Informs NRC That motor-operated Valve Testing Scheduled Completion Date of 871114,not Met.Valves Will Be Tested When Conditions Can Be Established During Startup from Cycle 3/4 Refueling Outage

From kanterella
(Redirected from L-87-477)
Jump to navigation Jump to search
Informs NRC That motor-operated Valve Testing Scheduled Completion Date of 871114,not Met.Valves Will Be Tested When Conditions Can Be Established During Startup from Cycle 3/4 Refueling Outage
ML17221A506
Person / Time
Site: Saint Lucie  
Issue date: 11/16/1987
From: Woody C
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
IEB-85-003, IEB-85-3, L-87-477, NUDOCS 8711200180
Download: ML17221A506 (2)


Text

~

h.l h

0 0 A t A~

i %Ill ~ J 4>

~ ~

REGULATQI, INFORMATION DISTRIBUTION h/STEM (RIDS)

ACCESSION NBR: 8711200180 DOC. DATE: 87/11/16 NOTARIZED:

NO FACIL: 50-335 St.

Lucie Planti Unit ii Florida Power 5 Light Co.

5038II't.

Lucie Planti Unit 2I Florida Poujer h Light Co.

AUTH. NAME AUTHOR AFFILIATION llQODYI C. Q.

Florida Pomer 5 Light Co.

RECIP. NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

DOCKET 05000335 0500038'7

SUBJECT:

Informs NRC that motor operated valve testing scheduled completionI date of 871114> not met. Valves ujil1 be tested when conditions can be established during startup from Cycle 3/4 refueling outage.

DISTRIBUTION CODE:

IEIID COPIES RECEIVED: LTR L ENCL 0 SIZE:

I TITLE: Bulletin Response (50 DKT)

NOTES:

REC IP IENT ID CODE/NAME PD2-2 LA TOURIGNY E INTERNAL: AEOD/DOA AEOD/DSP/TPAB NRR/DEST/ADS NRR/DOEA/EAB PB 02 RGN2 F ILE 01 COP lES LTTR ENCL RECIPIENT ID CODE/NAME PD2-2 PD AEOD/DSP NRR/DEBT/ADE NRR/DEBT/MEB NRR/DOEA/GCB NRR /P MAS/ILR8 RES/DE/EIB COPIES LTTR ENCL EXTERNAL:

LPDR NSIC NRC PDR TOTAL NUMBER QF COPIES REQUIRED:

LTTR 19 ENCL

P. O.

14000, JUNO BEACH, PL 33408.0420 NOVEMBER 1 6 I987 L-87-477 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re:

St. Lucie Units I and 2 Docket Nos. 50-335 and 50-389 IE Bul let in 85-03 By letter L-86-204 dated May l5, l986, Florida Power Bc Light Company (FPL) submitted design basis information and program plans/schedules for St. Lucie Units I and 2 as required by IE Bulletin 85-03, "Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings."

The schedule for completion of the motor-operated valve testing was provided as November l4, l 987.

This testing has been completed on St. Lucie Unit I and is in the process of being completed on St. Lucie Unit 2.

The purpose of this letter is to inform the NRC that this testing was not completed by the above date for St. Lucie Unit 2, and to provide the expected completion date.

Three 'valves associated with the auxiliary feedwater system remain to be tested.

These valves will be tested when the conditions can be established during the startup from the current St. Lucie Unit 2 Cycle 3/4 refueling outage.

Should there be any questions concerning this subject, please contact us.

C.O y

Group ice President Nuclear Energy Department COW/MSD/gp 8711200180 87111+

PDR ADQCK 05000 8

PDR cc:

Dr. J. Nelson Grace, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant MSD2/007/ I an FPL Group company