L-87-427, Discusses Actions Util Taking to Augment & Modify Mgt on Shift Program,Described in Util ,To Formalize Commitment to Actions
| ML17342A981 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 10/19/1987 |
| From: | Woody C FLORIDA POWER & LIGHT CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| L-87-427, NUDOCS 8710220117 | |
| Download: ML17342A981 (4) | |
Text
REGULATORY ORMATION DISTRIBUTION SYS 1 (RIDS)
ACCESSION NBR: 8710220117 DOC. DATE: S7/10/19 NOTARIZED:
NO DOCKET 0 FACIL: 50-250 Turkey Point Plant Unit 3 Florida Power and Light C 05000250 50-251 Turkey Point Planti Unit 4i Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION MOODYi C. O.
Florida Power h Light Co.
RECIP. NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Discusses actions util taking to augment 5 modify mgt on shift programs described in util 871007 ltr> to formalize c ommi tment to ac tions.
DISTRIBUTION CODE:
A001D COPIES RECEIVED: LTR ENCL SIZE:
TITLE:
OR Submittal:
General Distribution NOTES:
RECIPIENT ID CODE/NAME PD2-2 LA McDONALD>D COPIES LTTR ENCL RECIPIENT ID CODE/NAME PD2-2 PD COPIES LTTR ENCL INTERNAL: ARM/D*F/LFMB NRR/DEST/CEH NRR/DEST/RSB NR RB G F 01 EXTERNAL:
EQhQ BRUSKE S NRC PDR NRR/DEST/ADS NRR/DEST/MTB NRR/DOEA/TSB OGC/HDS2 RES/DE/EIH LPDR NSI C TOTAL NUMBER OF COP'IES REQUIRED:
LTTR 21 ENCL
0 E
l f
'l n
II
'V
~,
e USNRC'os
Sl'00 22 A l0: Oo" P. O. BOX1, JUNO BEACH, FL 33408-0420 g
+irn~>>+
OCTOBER 1 9 1987 L-87-427 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentl em en:
Re:
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-25 I Au mented Mana ement on Shift Pro ram The purpose of this letter is to describe the actions Florida Power 8 Light Company (FPL) is taking to augment and modify the Management on Shift Program which was described in our letter, L-87-400, dated October 7,
l987.
These changes have been discussed with the NRC Region II Staff and are provided here to formalize FPL's commitment to these actions.
FPL's commitment to management presence on the backshift will continue as discussed in our October 7,
l987 letter.
- However, the Management on Shift Program is being augmented to include continuous coverage by at least one individual who has not been assigned to Turkey Point within the previous two years.
These individuals shall hold or have held an SRO license or have previous experience in assessing the operation of commercial nuclear power plants.
The augmented Management on Shift Program will be implemented prior to entering Mode 2 for either Turkey Point reactor.
ln addition to the augmented Management on Shift Program, a special operational evaluation will be performed by INPO, using industry peer evaluators, to assist FPL in identifying the actions needed to achieve the desired level 'f accountability and performance expected of our operating personnel.
The augmented Management on Shift coverage will remain in place until FPL is satisfied that this high level of performance is achieved.
The NRC will be advised in advance of FPL's determination that the program can be reduced or terminated.
As with the other operations enhancements, items of concern which are surfaced with this augmented coverage will receive prompt management attention.
Very truly yours, C. O. W dy Group Vi resident Nuclear Energy COW/PLP /gp PLP I /056/I I
8710220fi7 87fOR9 PDR ADDCN 05000280 p
'>'3 li'C,:)
P I