L-87-339, Submits Proposed Schedule for Util Responses to NRC 870804 Telcon Request for Addl Info Re NUREG-0737,TMI Action Item II.D.1, Performance Testing of Relief & Safety Valves

From kanterella
(Redirected from L-87-339)
Jump to navigation Jump to search
Submits Proposed Schedule for Util Responses to NRC 870804 Telcon Request for Addl Info Re NUREG-0737,TMI Action Item II.D.1, Performance Testing of Relief & Safety Valves
ML17221A346
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 08/14/1987
From: Woody C
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.D.1, TASK-TM L-87-339, NUDOCS 8708260015
Download: ML17221A346 (4)


Text

REGULATO INFORMATION DISTRIBUTION TEM (RIDS) r n~

ACCESSION NHR: 8708260015 DOC. DATE: 87/08/14 NOTARIZED:

NO FACIL: 50-335 St.

Lucie Planti Unit 1. Florida Power 5 Light Co.

50-389 St.

Lucie Planti Unit Zi Florida Power 8c Light Co.

AUTH. NAME AUTHOR AFFILIATION WOODYi C. O.

Florida Power 5 Light Co.

REC IP. NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Responds to NRC request for add) info re NUREG-0737 TMI Action Item II. D. Ii "Performance Testing of Relief

& Safety Valvesi " on submitted schedule.

DOCKET 0 05000335 05000389 DISTRIBUTION CODE:

A045D COPIES RECEIVED: LTR l

ENCL O SIZE:

TITLE:

OR Submittal:

Emergency Preparedness Plans'mplement'g Proceduresi C

NOTES:

RECIPIENT ID CODE/NAME PD2-2 PD COPIES LTTR ENCL REC IP IENT ID CODE/NAME TOURIGNYi E COPIES LTTR ENCL INTERNAL: AEOD/DC+/IRH EG FXE 01 EXTERNAL:

LPDR NSIC NRR/DREP/EPB NRC PDR TOTAL NUMBER OF COPIES REQUIRED:

LTTR 8

ENCL

1I 5

4!

P. O.

Y 14000, JUNO BEACH, FL 33408.0420

~~in~~

AUGUST 14 1S87 L-87-339 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Gentlemen:

Re:

St. Lucie Unit Nos.

I and 2 Docket Nos. 50-335 and 50-389 TMI Action Item II.D.I Re vest for Additional Information By letter dated June IO, l987 (E. G. Tourigny to C. O. Woody), the NRC identified additional information the staff required to continue its review of TMI Item II.D.I of NUREG - 0737, "Performance Testing of Relief and Safety Valves".

Florida Power & Light Company (FPL) and the NRC staff held a conference call on this request for additional information on August 4, l987, to clarify certain questions and discuss FPL's proposed schedule for response.

As a result of this telephone conference, FPL will respond to this request for additional information on the following schedule:

St. Lucie Unit I questions I., 2.A., 2.B., 4.A. and 5.; and St. Lucie Unit 2 questions I.A., I.B., 2.A., 2.B.I., 2.B.2. and 2.8.4. will be submitted by November 6, I 987.

The remaining St. Lucie Unit I and Unit 2 questions will be addressed by February 5, l988.

The NRC staff has found the above stated response schedule acceptable.

If additional discussion on this topic is required in the interim, please contact us.

Very truly yours, C.O. W y

Group ice President Nuclear Energy COW/EJW/gp cc:

Dr. J. Nelson Grace, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant EJW I /022/ I 8708260015 8708i4 PDR ADOCK 05000335 p

PDR an FPL Group company

I

~ I

~

~ I I

AI t

Jt t ~'l I

F I

F

~

T

. I ~ ll I

d I

~

~

~

~

~

~

~

4 A

A I

\\ ~

'