L-87-318, Forwards Enhanced Technical Evaluation Flow Measurement of Centrifugal Pumps in Fixed Resistance Sys at St Lucie Plant, Per NRC 870304 Meeting.Meeting Concerned Appeal of NRC 870210 Denial of Relief Request from ASME Section XI

From kanterella
(Redirected from L-87-318)
Jump to navigation Jump to search
Forwards Enhanced Technical Evaluation Flow Measurement of Centrifugal Pumps in Fixed Resistance Sys at St Lucie Plant, Per NRC 870304 Meeting.Meeting Concerned Appeal of NRC 870210 Denial of Relief Request from ASME Section XI
ML17219A715
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 07/31/1987
From: Woody C
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML17219A716 List:
References
L-87-318, NUDOCS 8708060116
Download: ML17219A715 (6)


Text

RF ULAT RY INFORMATION DISTRI UTIQ t SYSTEM (RIDB)

ACCESSION NBR: 870806011 DOC. DATE: 87/07/3 NOTARIZED:

NO FACIL: 50-389 St.

Lucie Planti Unit 24 Florida Power 5 Light Co.

AUTH. NAME AUTHOR AFFILIATION WOODY4 C ~ O.

Florida Power 5 Light Co.

RECIP. NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

DOCKET 05000389

SUBJECT:

Forwards enhanced "Technical Evaluation Floe Measurement of Centrifugal Pumps in Fixed Resistance Sgs at St Lucie Planti " per NRC 870304 meeting. Meeting concerned appeal of NRC 870210 denial of relief request from ASME Section XI.

DISTRIBUTION CODE:

A047D COPIES RECEIVED: LTR JENCL $

SIZE:

TITLE:

OR Submittal:

Inservice Inspection/Testing NOTES:

RECIPIENT ID CODE/NAME PD2-2 L*

TOUR IQNY. E COPIES LTTR ENCL 1

0 1

1 REC IP IENT ID CODE/NAME PD2-2 PD COPIES LTTR ENCL 5

5 REQ FIL EXTERNAL:

LPDR NSIC INTERNAL: AEOD/DOA ARM/DAF/LFMB NRR/DEBT/MES 8

01 1

1 0

1 1

1 1

1 1

1 1

1 AEOD/DSP/TP*H NRR/DEBT/ADE NRR/DEBT/MTB OQC/HDB2 REB/DE/EIH NRC PDR 1

1 0

1 1

0 1

1 1

1 f

TOTAL NUMBER OF CQP IES REQUIRED'TTR 20 ENCL 16

~

0

~

~

I P

lt t

K I

i

'gl

~

~

. BOX 14000, JUNO BEACH, FL 33408 n

49 lb 1niA FLORIDAPOWER 8 LIGHTCOMPANY JULY 5 4

)987 L-87-3I8 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re:

St. Lucie Unit 2 Docket No. 50-389 Relief from Parts of ASME Section XI By letter dated January l3, l986, the NRC denied a Florida Power

& Light Company (FPL) relief request from the requirements of IWP-4600 of ASME Section XI regarding flow measurement.

By letter dated October l3, l986, FPL submitted a

revised request for relief from performing quarterly flow measurements for certain pumps as specified in the l980 Edition through the Winter l980 Addenda of Section XI. As a basis for this request, FPL showed that flow measurement cannot be performed for some of the pumps because the pumps do not contain flow measurement devices and that quarterly flow measurement for the remaining pumps is impractical without design modifications to permit performance of the flow measurement tests under Section Xl of the ASME Code.

By letter dated February IO, l987, the NRC denied FPL's revised relief request and directed FPL to install certain flow measurement devices for the pumps by the next refueling outage for St. Lucie Unit 2. Also, in that same letter, FPL was given the opportunity to request an appeal meeting.

On March 4, l987, FPL met with the NRC to appeal the decision in NRC's letter of February IO, l987.

At this meeting, FPL restated its position that quarterly flow measurements were impossible or impractical absent design modifications, and that FPL was not required under IO CFR 50.55a(g) to modify its design.

Following the FPL appeal presentation, the NRC requested that FPL provide NRC with an enhanced technical evaluation which addresses the impracticality of performing flow measurements specified in Section XI of the ASME Code (including an evaluation of the adequacy of the tests proposed by FPL in its October l3, l986 letter and an evaluation of whether installation of the flow measurement devices identified in the NRC's letter of February IO, l987, would provide additional assurance of pump operational readiness).

The purpose of this letter is to transmit the requested enhanced technical evaluation.

O+Oii6 87oygg

, ADO'< DSPPOQ89

'DR og'I i(i MSD I /03 I / I PEOPLE... SERVING PEOPLF

~

~

~

~

I J

,I n

  • I if n

U. S. Nuclear Regulatory Commission L-87-3I8 Page two Revised relief requests are being developed consistent with the determinations of impracticality supported in the attached technical evaluation.

The revised relief requests will be submitted to the NRC at a later date.

If there should be any questions, please contact us.

Very truly yours, vc o.w Group ice President Nuclear Energy COW/MSD/gp Attachment cc: