L-87-224, Forwards Response to Violations Noted in Insp Repts 50-335/87-08 & 50-389/87-07.Corrective Actions:Action Plan for Submittal of All Changes to Radiological Emergency Plan & Implementing Procedures Developed
| ML17219A604 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 05/26/1987 |
| From: | Woody C FLORIDA POWER & LIGHT CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| L-87-224, NUDOCS 8706050071 | |
| Download: ML17219A604 (3) | |
Text
REGULATORY INFORMATION DISTRIBUTION SYSTEl'1 (R IDS>
> ~
ACCESSION NBR: 8706050071 DQC. DAT&.: 87/05/26 NOTARIZED:
NQ FACIL 50335 St.
Lucie Plant>
Unit 1> Florida Power i~c Light Co.
~
.0-389 St.
Lucie Plant>
Unit 2> Florida Power h Light Co.
AUTH. MANE AUTHOR AFFILIATION WOODY> C. 0 Flor ida Power 8< Lig ht Co.
C IP. NANE RECIPIENT AFFILIATION 0
Document Control Branch (Document Control Desk>
SUBJECT:
Responds to NRC ltr re violations noted in Insp Repts 50-335/87-08 8c 50-389/87-07. Corrective actions: Util developed action plan for submittal of all changes for E plan 5 implementing procedures to NRC within 30 days.
DISTRIBUTION CODE:
IE01D COPIES RECEIVED: LTR ENCL SI ZF:
TITLE: General (50 Dkt>-Insp Rept/Notice of Violation Response NOTES; DOCKET 05000335 05000389 RECIPIENT ID CODE/NANE PD2-2 LA TQUR IGNY. E INTERNAL:
AEQD ENF LIEBERNAN NRR/DOEA DIR NRR/DREP/RPB NRR/
S/ ILRB G FILE R
~
FILE 01 E
AL:
LPDR NSIC COPIES LTTR ENCL 1
0 2
2 1
1 1
1 1
2 2
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAl'1E PD2-2 PD DEORO NRR ROE> N. L h!RR/DREP/EPB h!RR/DRIS DIR OGC/HDS2 RES DEPY GI h!RC PDR COPIES LTTR EhlCL 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 TOTAL NUMBER OF COPIES REQUIRED:
LT1R 21 ENCL 20
P. O. BOX 14000, JUNO BEACH, F L 33408 0420
~'f hler i98, L47-224 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gent 1emen:
Re:
St. Lucie Units I and 2
=
Docket Nos. 50-335 and 50-389 Ins ection Re ort 335/87-08 and 389/87-07 Florida Power & Light Company has reviewed the subject inspection report, and pursuant to the provisions of IO CFR 2.201 the response is attached.
There is no proprietary information in this report.
Very truly yours, oup Vice President uclear Energy COW/GRM/gp Attachment cc:
Dr. J. Nelson Grace, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant 87pgp~p 6
ADOCK 87p526 p5ppp33~
~DR ZE~ /
GR M5/052/ I an FPL Group company
Re:
St. Lucie Units I and 2 Docket Nos. 50-335 and 50-389 lns ection Re ort 335/87-08 and 389/87-07
'INDINGS:
IO CFR 50.54(q) requires that a nuclear power reactor licensee follow and maintain in effect an emergency plan which meets the requirements of Appendix E to IO CFR Part 50.
Section V of Appendix E requires a licensee to submit one copy of any changes to the emergency plan to the Administrator of the appropriate NRC Regional Office and two copies to the Document Control Desk within 30 days of such changes.
Contrary to the above, Revision l6 of the Radiological Emergency Plan, dated September 27, l985, had not been sent to the appropriate NRC offices as of February I 8, I 987.
RESPONSES:
I.
FPL concurs with the violation.
2.
Due to an administrative oversight, Revision l6 of the St. Lucie Plant Radiological Emergency Plan (E Plan) was not submitted to the NRC within 30 days of final company approval.
During a
February 19, I 987, conversation with a
NRC Region II Emergency Planning Section staff
- member, the fact that the NRC had not received Revision l6 of the St.
Lucie Plant Radiological Emergency Plan was identified.
3.
FPL promptly reviewed their records to verify that all changes to the E Plan and its implementing procedures had been submitted to the NRC.
It was determined that the failure to submit the document in question (St. Lucie E Plan, Revision
- 16) was an isolated incident.
FPL submitted the St. Lucie Plant E Plan, Revision l6 to the NRC on February 25, I 987, Letter L-87-88.
4.
FPL developed an action plan for submittal of all changes of the E Plan and its implementing procedures to the NRC within 30 days of final company approval.
This action plan incorporates a computer based tracking program and assignment of responsibilities for administrative control of the E Plan and implementing procedure submittals to NRC.
This action plan was implemented on February 27, I 987.
5.
Full compliance was achieved on February 25, I 987.
GR M5/052/2