L-86-433, Application for Amends to Licenses DPR-31 & DPR-41,revising Tech Specs to Require That 18-month Insp of Each Diesel Generator Be Performed During Next Unit 3 Refueling Outage. Fee Paid
| ML17346B239 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 10/20/1986 |
| From: | Woody C FLORIDA POWER & LIGHT CO. |
| To: | Thompson H Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML17346B240 | List: |
| References | |
| L-86-433, TAC-66377, NUDOCS 8610240309 | |
| Download: ML17346B239 (8) | |
Text
iI~
ACCESSION NBR:
FAC IL:50-250 50-251 AUTH. NANE WOODY'. O.
RECIP. NANE THOMPSON> H. L.
DOCKET 8 05000250 05000251 REGULATOR,NFORNATION DISTRIBUTION El l (R IDS>
8610240309 DOC. DATE: 86/f0/20 NOTARIZED:
NO Turk'eg Point Plant.
Unit 3I Florida Power and Light C
Turkey Point Plant.
Unit 4i Florida Potaer an) Light C
AUTHOR AFFILIATION Florida Power Zc Light Co.
RECIPIENT AFFILIATION Division of Pressurized Water Reactor Licensing A (post 8
SUBJECT:
Application for amend to Licenses DPR-31 5 DPR-4f, revising Tech Specs to require that 18-month diesel generator insp be performed during each Unit 3 refueling outage. Fee paid.
DISTRIBUTION CODE: *BIBB COPIES RECEIVED: LTR J ENCL Q SIIE:
TITLE:
OR Submittal:
Onsite Emergency Power Sgstem NOTES:
REC IP lENT ID CODE/NANE PWR-A ADTS PWR-A PD2 PD 01 PWR-A PBB INTERNAL: ADN/LFNB NRR BWR ADTS NR
ADTS 04 RN/DDANI/NIB 18 COPIES LTTR ENCL 1.
1 5,
5 1
1 1
0 1
f 1
f 1
f 1
RECIP IENT ID CODE/NAME PWR-A PD2 LA NcDONALD~ D AEOD/PTB NRR PWR-A ADTS NRR/DSRO/RBIB RQN2 COPIES LTTR ENCL 0
1 EXTERNAL: LPDR NSIC 03 05 1
1 f
1 NRC PDR 02 1
1 Q g<pO TOTAL NUl'tBER OF COPIEB REQUIRED:
LTTR 21 ENCL 19
W t) 1 PIP W
f)')
P PPP Wi
~ 1
'V 1
Q
~
im
.Q p
"W,tq "I 'p"team Pw l Pi m fuff 'Ii, ft"WI p P 'P g)
(1 Ptf
),mfw I
OX 14000 JUNO BEACH FL 33408 Jtirl w4K+
FLORIDAPOWER & LIGHT COMPANY 0GTOBER 2 0 1986 L-86-433 Office of Nuclear Reactor Regulation Attention:
Mr. Hugh L. Thompson, Jr. Director Division of PWR Licensing - A U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Dear Mr. Thompson:
Re: Turkey Point Units 3 and 4 Dockets 50-250 and 50-25 I Proposed License Amendment Emer enc Power S stems Periodic Tests In accordance with IO CFR 50.90, Florida Power Bc Light submits herewith three signed originals, and forty copies of a request to amend Appendix A of Facility Operating Licenses DPR-3 I and DPR-4 I.
Technical specification 4.8.l.c. I requires that each diesel generator be subjected to an inspection in accordance with manufacturer's recommendations at least once each eighteen months.
The proposed amendments would defer the inspection of both diesel generators until the next Unit 3 refueling outage, scheduled to begin in March l987.
The inspections would then be performed during each succeeding Unit 3 refueling outage.
By deferring these inspections, they would be performed with only one unit at power as would normally be the case during a refueling outage.
Approval of this request is necessary before November I I, l986.
The currently required inspection for Diesel Generator A must be completed by that date.
The proposed changes are described below and shown on the accompanying Technical Specification pages.
Pa es 4.8.l - 4.8.3 Technical Specification 4.8.l.c.l is revised to require that the l8 month diesel generator inspection be performed during each Unit 3
refueling outage.
Additional changes were made to the remaining sections because of this change.
lt has been determined that the proposed amendment does not involve a
significant hazards consideration pursuant to IO CFR 50.92.
A no significant hazards consideration evaluation is attached.
ln accordance with IO CFR 50.9l(b)(l), a copy of this proposed license amendment is being forwarded to the State Designee for the State of Florida.
TCG6/002/ I S~gPP4P3Qq Sbi022~O f gg PgOCK 05oo g~i PEOPLE... SERVING PEOPLE
I 4
A I
b.
II 4 ~
~.
I '
5h 4
~
4 I
~
44 4
A I
I' I
4 I
I 4,
>>I Il I
J
'1 4
>>4
"~
A>>
I>>
A t 4'f>>t>>
~
1 4
1 1
I
~
I Il 4
4 4
4 I 4>>
~ I,r I
44
'4 II ~
~
I" 4
t ht II Iv 1
~" J 4
,II
'I 4
4
~ 4 hb I
1 I 4 t
4 14
'4 1>
4 4
~ I 4
I 4%lb't rb
'I I
~
I IQ ~I >>'"
~
A.
r Ih
>Ai
'l.t
( ~ 1>>
I
>>4 I, r," ~ 41 bb Lb>>'t>r
~ I 'C (Pylb 'a 4'l 4>A-AAA 4 p hb AIA.'4'bb O'I t
II
Mr. Hugh L. Thompson, Jr. Director L-86-433 Page two ln accordance with 10 CFR l70.I2(c), FPL Check No. 2860 for $ l50.00 is attached.
The proposed amendment has been reviewed by the Turkey Point Plant Nuclear Safety Committee and the Florida Power 8 Light Company Nuclear Review Board.
Very truly yours, C.O. Woody Group Vic resident Nuclear Energy COW/TCG/gp Attachments cc:
Dr. J. Nelson, Grace, Region ll, USNRC Harold F. Reis, Esquire Dr. Alan Schubert Public Health Physicist Department of Health and Rehabilitative Services l 323 Winewood Boulevard Tallahassee, Florida 3230 I TCG6/002/2
~ y I
V
'E
'+hi.'$
H 'lp WIC egg
~ f ~p 4 I 5VP'p sg j
STATE OF FLORIDA
)
)
ss.
COUNTY OF PALM BEACH )
That he is a Grou Vice President of Florida Power & Light Company, the Licensee herein; That he has executed the foregoing document; that the statements made in this document are true and correct to the best of his knowledge, information, and
- belief, and that he is authorized to execute the document on behalf of said Licensee.
C. O. Woody Subscribed and sworn to before me this D0 day of
, 19~.
/
.1
.i'(~ '-
'"-.NOTARY,PUBLIC, in and for the County
','f Palm Beach, State of Florida RY PQOI IO SIRE Hr OoHHISSIOH PIoRIoA
~
OOHOIO I I8sl989 My Commission expires:
'~ERALI ltllo
N
~
~
N fg k
I d