+**y'4 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 FLORIDA POWER AND LIGHT COMPANY DOCKET NO. 50-250 TURKEY POINT PLANT UNIT NO.
3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.
License No. DPR-3l 1.
The Nuclear Regulatory ComIission (the Commission) has found that:
A.
The application for amendment by Florida Power and Light Company (the licensee) dated October 20, 1986, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i} that the activities authorized by this amendment can be conducted without endangering'the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the.Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.8 of Facility Operatinq License No.
DPR-31 is hereby amended to read as follows:
8611250127 861110 PDR
- DOCK 05000250 P
~
' (R)
Technical S ecifications The Technical Specifications contained in Appendix A and R, as revised through Amendment No. 120, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of the date of issuance and shall be implemented immediately.
FOR THE NUCLEAR REGULATORY COMMISSION 4-) (y ~~..'>
Lester S. Rubenstein, Director PWR Project Directorate P2 Division of PWR Licensing-A Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance:
November 10, 19S6
pp
~gS REGg P
+
~
0
~y
~ Wi 0
V/+
~
~
pN
+a*<<+
UNITED STATES NUCLWhR REGULATORY COMMISSION WASHINGTON, D. C. 20555 FLORIDA POWER AND LIGHT COMPANY DOCKET NO. 50-251 TURKEY POINT PLANT UNIT NO.
4 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.
114 License No.
DPR-41 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Florida Power and Light Company (the licensee) dated October 20, 1986, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense.and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B of Facility Operating License No.
DPR-41 is hereby amended to read as follows:
(B)
Technical S ecifications The Technical Specifications contained in Appendix A and B, as revised through Amendment No.
114, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of the date of issuance and shall be implemented immediately.
FOR THE NUCLEAR REGULATORY COMMISSION Lester S. Rubenstein, Director PWR Proiect Directorate b2 Division of PWR Licensing-A Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance:
November 10, 1986
ATTACHMENT TO LICENSE AMENDMENT AMENDMENT NO. l FACILITY OPERATING LICENSE NO.
DPR-31 AMENDMENT NO. ll4 FACILITY OPERATING LICENSE NO.
DPR-41 DOCKET NO. 50-260 AND 50-251 Revise Appendix A as follows:
Remove Pa es 4.8-1 4.8-2 4.8-3 Insert Pa es 4.8-1 4.8-2 4.8-3
'.8 EMERGENCY ER SYSTEM PERIODIC TESTS
~0b 'ective:
A 11 1
dd the emergency power system.
To verify that the emergency power system will respond promptly and properly.
1 1 11 1
1 1
11 1
stated:
l.
Diesel Generator Each diesel generator shall be demonstrated OPERABLE:
a.
On a staggered test basis (nonconcurrently) at the frequency specified by Table 4.8-1 by:
l.
Verifying fuel level in the day tank and in the engine-mounted fuel tank.
2.
Verifying fuel leve) in the fuel storage tank.
3.
Verifying that a fuel transfer pump can be started and transfers fuel from the Diesel Oil Storage Tank to the Day Tank.
4.
Verifying that the diesel generator starts from ambient conditions and accelerated to provide 60+1.2 Hz frequency and 4160+624 volts in ( 15 seconds.
S.
Verifying that the generator is synchronized, loaded to >2500 kw within 10 minutes and operates for >60 minutes.
6.
Verifying that the diesel generator cooling system functions within design limits during the 1-hour full load test required by Specification 4.8.1.a.5.
b.
At least once per 92 days by verifying that a sample of diesel fuel from the fuel storage tank is within acceptable limits when checked for viscosity, water, and sediment.
c.
During each Unit 3 refueling outage by:
1.
Subjecting the diesel to an inspection in conjunction with its manufacturer's recommendations for this class of standby service.
d.
At least once per 18 months by:
l.
Verifying the diesel generator's capability to:
4.8-1 Amendment Nos 120 5 114
0,
~
- = (e)
Re'ject a broad vf 200 -kw'without-exceeding 4160+524;volts:.and-60+1 2.Hz.
tb) "Reject complete load without exceeding
" 4160+624= volts, and without exceeding overspeed limits.
2.
Verifying that diesel generator trips which are wpera%l e-during-The'test'mode of'iesel operation
'.wre'inoperable when %he diesel-is not inde West
. mode of operation.
3.'Alternately initiating one of the following two diesel startup tests;
.,(a),&imluate..a safety injection.aignal
.and allow the diesel generator to achieve
= " nominal-rated voltage and speed.
Then
. simulate'-a loss, of offsite power, and
~'=.-"allow,,the diesel generator to load and stabilize.
(b)
Simulate ~ loss of offsite power,-and-allow the diesel generator to load and stabilize.
- Then simulate a safety injection signal, and allow the diesel generator to sequence safety loads and stabilize.
4.
Monitoring the tests specified in 4.8.l.c.4 to:
(a)
Verify proper deenergization and load.
shedding from the 4160 volt busses.
.Q>)
- %eriVy<hat the diesel generator~arts
.from ambient conditions and accelerates to
,. pt ov.ide.60+1 2,Hz frequency and 416+624
,vol.ts,in <T5 seconds.
- 5. 'erifying~ %he 'diesel-generator vperates~r at least 8-tnurs by performing~ -following (a) l.oad the diesel generator to ~2750 he.d~g
%he-first '2~hours =of,-the 8 hour~
(b)
Load the diesel generator to.>2500 kw,.during
..the'last'6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> o'f the 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> test.
. fc), -.Verify Chat voyage..f equency,.hand.~ol.ing system functions are within,design limits
, during the' hour full-1oad test.
- 5. J3emonstrating Wa:.ability~~ential )y=
'.8-2
~dment Nos.'120 Y 114
(a)
Synchronize the diesel generator with offsite power while the generator is supplying emergency loa'ds; (b)
Transfer the emergency load to offsite power; (c)
Isolate the diesel generator; and (d)
Return the diesel generator to standby status.
7.
Verifying that auto-connected loads to each diesel generator do not exceed 2750 kw.
e.
At least once per 10 years, of".after any modification that could affect diesel generator independence, start both diesel generators simultaneously at a time when both reactors are shutdown and verify that both diesel generators provide 60+1.2 Hz frequency and 4160+624 volts in <15 seconds.
2.
STATION BATTERIES a.
Pilot cell specific gravities shall be read and recorded daily.
The pilot cell shall b'e rotated on a monthly basis.
b.
Monthly each battery shall be given an equalizing
- charge, and afterwards specific gravity and voltage readings shall be taken and recorded for each cell.
Water shall be added to restore normal level and total water use shall be recorded.
Complete visual inspection of batteries shall be made monthly.
c.
quarterly detailed visual inspection shall be made of chargers.
d.
Annually connections shall be checked for tightness and anti-corrosion coating shall be applied to interconnections.
e.
Perform load test annually.
4.8-3 Amendment Nos. 120 5 114