L-86-162, Forwards Addl Info Re Mods Required to Support Bypass Flow Measurements of Certain Pumps.Extension of Interim Relief from Parts of ASME Section XI Requested for Duration of Cycle 3
| ML17216A490 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 04/14/1986 |
| From: | Woody C FLORIDA POWER & LIGHT CO. |
| To: | Thadani A Office of Nuclear Reactor Regulation |
| References | |
| L-86-162, NUDOCS 8604180139 | |
| Download: ML17216A490 (6) | |
Text
REQULAT INFORMATION DISTR IBUTIQNWYSTEN (R IDS)
ACCESSION NBR: 8604180139 DOC. DATE: 86/04/14 NOTARIZED:
NO FACIL: 50-389 St.
Lucie,Plant.
Unit 2i Flov ida Power Zc Light Co.
AUTH. NAl'1E AUTHOR AFFILIATION WOODY'. O.
Florida Power Sc Light Co.
REC IP. NAl'1E RECIPIENT AFFILIATION THADANIiA. C.
PWR Pv object Div ectorate 8
SUBJECT:
For(cards addi info re mods requiv ed to suppov t bypass f loll measuv'ements of certain pumps. Extension of interim relief fvom pavts of ASNE Section XI requested fov'uv'ation of Cycle 3.
DISTRIBUTION CODE:
A047D COPIES RECEIVED: LTR ENCL SI ZE:
TITLE:
QR Submittal:
Insev vice Inspection/Testing NOTES:
DOCKET 0 05000389 RECIPIENT ID CODE/NANE PWR-B EB SELLS> D INTERNAL: ADN/LFNB NRR BWR ADTS NRR PWR-A ADTS NRR PWR-B ADTS NRR/DSRO/EIB 04 COPIES LTTR ENCL 1
1 1
1 1
0 1,
1 1
1 1
REC IPIENT ID CODE/NAi~fE PWR-B PD8 PD 01 ELD/HDS2 NRR BWR EB NRR PWR-A EB NRR PWR-B EB NRR/TANB RQN2 COPIES LTTR ENCL.
5 5
EXTER NAL: 24X NRC PDR 1
1 1
LPDR NSIC 03 05
~oe95 t)
P TOTAL NUMBER OF COP IES REQUIRED:
LTTR 23 ENCL 21
g 1 1
f li il
iAIIAW FLORIDAPOWER & LIGHTCOMPANY April 14, 1986 L-86-162 Office of Nuclear Reactor Regulation Attention:
Mr. Ashok C. Thadani, Director PWR Project Directorate NS Division of PWR Licensing B U. S. Nuclear Regulatory Commission Washington, D. C. 20555
Dear Mr. Thadani:
RE:
St. Lucie Unit 2 Docket No. 50-389 Extension of Interim Relief From Parts of ASME Section XI By letter dated March 11, 1986, Florida Power 4 Light Company (FPL) requested an extension of the Interim Relief granted in your January 13, 1986 letter, which directs modification of St.
Lucie Unit No.
2 this outage to provide for flow measurement of certain pumps.
At the request of NRC staff, a
telephone conference was held March 27, 1986 to discuss and describe the modifications and schedules involved.
The purpose of this letter is to provide additional information (see Table 1
attached) on the modifications that would be needed to support bypass flow measurements on the pumps in question.
FPL requests that NRC grant relief from the testing requirements for the duration of Cycle 3.
In order to support unit
. start-up for Cycle 3, we r equest NRC approval by April 30, 1986.
\\
FPL check number 0985 is attached as remittance for the review fee specified in 10 CF R170.21.
C. O. Wood Group V'esident Nuclear Energy COW/eh Attachments cc:
Dr. J. Nelson Grace, USNRC, Region II Harold Reis, Esquire, Newman R Heltzinger 8604180139 860414 PDR
'*DOCK 05000389 P
PDR PS3:1/eh PEOPLE... SERVING PEOPLE
Florida Power 4 Light St. Lucie Unit II2-Docket No. 50-389 Table I
Modification Location I~ s AFW (2A, 2B, 2C)
Descri tion Install a camen flow rreasuremnt device in the existing bypass line to the Condensate Storage Tank.
This pipe run is mlstly underground, but a short section is accessible under a missile-shield in the pmy area.
However, there is not enough rocm in the pipe trench to install equiprent, so a new missile-shielded pipe would have to be run outside the trench.
A 30-ft pipe run would be needed for flow stability, and would contain the necessary
- flanges, valves, instrwents etc.
Design lead tine
~72 manda s
Procure@ant lead tirre 20 - 26 weeks P
ff5I (2A, 2B)
LPSI (2A, 2B)
CS (2A, 2B)
Install a camen flow rn asurenent device in the existing 6-in recirculation line to the Refueling Water Tank.
However, this 6-in line is too large to rn asure the flows in question
(
50 gpn}, so a new 2-in bypass line (and associated flanges, valves, instr'.ntation, etc.) would have to be installed.
The rrost likely location would be the pipe tunnel in the Auxiliary Building.
hCIO I Design lead tine
~72 nanda s
Procureoent lead tine 20-26 weeks
Florida Paver R Light Ccmpany, St. Lucie Uni-t I/2 Docket No. 50-3S9 Table l (continued)
Modification Location Descr> tron Diesel Oil Transfer (2A, 2B)
The existing camen 2-in cross-tie nay be long enough to install the necessary
- flanges, valves, instrwentation, etc. Havever, instrumentation procurerrLnt-lead tirras are too long to support installation in the short term.
Design lead tine
~20 nanda s
Procurern nt lead tine 20-26 weeks P
HAM (2A)
A flev naasurerrent device could be installed at the Boric Acid Makeup Station in the Auxiliary Building.
- However, the piping is insulated and heat traced
( 20,000 ppn boron acid solution), which carplicates the modification process.
Design lead tine
~72 nanda s
Procurement lead tine 20-26 weeks Tine to perform rrndifioations
~51 rrnnda s
(2B)
Separate location, but sara description as Location 0.
~r'~
~
~