L-85-158, Forwards Sea Turtle Intake Entrapment Studies, Per Section 4.2.2 of App B to Environ Protection Plan.Netting Technique Will Be Continued,Per 840411 Recommendations from Meeting W/Natl Marine Fisheries Svc

From kanterella
(Redirected from L-85-158)
Jump to navigation Jump to search
Forwards Sea Turtle Intake Entrapment Studies, Per Section 4.2.2 of App B to Environ Protection Plan.Netting Technique Will Be Continued,Per 840411 Recommendations from Meeting W/Natl Marine Fisheries Svc
ML17215A858
Person / Time
Site: Saint Lucie 
Issue date: 04/18/1985
From: Williams J
FLORIDA POWER & LIGHT CO.
To: John Miller
Office of Nuclear Reactor Regulation
Shared Package
ML17215A859 List:
References
L-85-158, NUDOCS 8504260218
Download: ML17215A858 (4)


Text

Ml REGULATOR~NPORMATION DISTRIBUTION TEM (R IDS)

ACCESSION NBR: 8500260218 DOC ~ DATE: 85/00/18 NOTARIZED:

NO FACIL:50 389 St, Lucie Plant~ Unit 2< Florida Power 8 Light Co, AUTH'>>NAME AUTHOR AF FILI AT'ION NILLIAMSiJ>>W ~

Flor ida 'Power 8 Light Co, RECIP ~ NAME RECIPIENT AFFIL'IATION MILLERiJ",R'>>-

Operating Reactors Branch 3

DOCKET 05000389

SUBJECT:

Forwards "Sea Turtle Intake Entrapment Studiesi" per.

Section 4.2.2 of App B.to environ protection plan. Netting technique will be continued~per 84041]

rrecommendations from moeting w/Natl Marine~ Fisher ies Svc ~

yN DISTRIBUTION 'CODE! ~COO]D COPIES RECEIVED:LTR

,E, g+

< iC TITLE: Licensing Submittal:

Environmental Rept Amdt L Related Correspondence N0TEs: 5~~.&v<~s Cps 05000389 OL:<oaj06/83 RECIPIENT'.

ID CODE/NAME:

NRR ORB3 BC 18 SELLSgD 00 INTERNAL'CRS 20 ELD/HDS2 NRR/DE/EEB 06-NRR/DE/SAB 07 NRR/DSI/RAB 09-RGN2 COPIES LTTR ENCL 1

1>>

1

.]i 6

]>>

1 1

1 1

RECIPIENT ID CODE/NAME KREUTZERiP 19 ADM/LFMB

'NRR/DE/AEAB 08 NRR/DE/EHEB ETB COPIES LTTR ENCL 1

]8 1

1 1

1 1

] ~

EXTERNAL: LPDR NSIC 03 05 1

]>>

1

~

1 ~

NRC PDR 02 1

]>>

TOTAL" NUMBER OF COPIES REQUIRED>>

L'TTR 22 ENCL=

i~

III 4

II P

1 t

~

H h

FLORIDA POWER & LIGHTCOMPANY APR t 8 1085 L-85-158 Office of Nuclear Reactor Regulation Attention:

Mr. James R. Miller, Chief Operating Reactors Branch No. 3 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Miller:

Re:

St. Lucie Unit No. 2 Docket No. 50-389 Environmental Protection P lan In accordance with Section 4.2.2 of the St. Lucie Unit 2 Environmental Protection Plan (Appendix B to Facility Operating Licensing NPF-I6), a study to evaluate and/or mitigate turtle entrapment at the intake structure was conducted.

On April I I, l984, Florida Power & Light Company (FPL) hosted an Interagency Task Force Meeting to brief federal and state agencies on the results of the study.

In attendance at this meeting were representatives from National Marine Fisheries

Service, NRC, Florida Department of Natural Resources, FPL and FPL's consultants.

A draft report of the study was provided to each attendee, and distributed to U.S. Environmental Protection

Agency, U.S. Fish and Wildlife Service and Florida Audubon Society, for review and comment.

Comments were received from National Marine Fisheries Service and Florida Audubon Society.

Attached is the final report which is submitted pursuant to Section 4.2.2 of the St. Lucie Unit 2 Environmental Protection Plan.

Based on the finding that an 80%

reduction of turtle entrapment cannot be projected using sound and/or light devices, it was recommended during the April I I, l984, meeting that FPL be allowed to remove entrapped turtles using netting techniques.

The National Marine Fisheries

Service, the lead federal agency having jurisdiction over sea turtles while in the water, concurred with this recommendation.

Therefore, FPL will continue removal of entrapped turtles using netting techniques.

Very truly yours, J. W. Will',Jr.

Group c

resident Nuclea nergy JWW/RJS/cab 8504260218 850418 PDR ADOCK 05000389 P

PDR PEOPLE... SERVING PEOPLE 4