Responds to 830815 Notice of Violation in IE Insp Repts 50-250/83-15 & 50-251/83-15 & Forwards Payment for Proposed Civil Penalty.Nuclear Turbine Operator Logsheets Revised to Upgrade Instructions
ML20077R256
Person / Time
Site: Turkey Point  
Issue date: 09/09/1983
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: Deyoung R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
L-83-481, NUDOCS 8309160272
Download: ML20077R256 (5)


Text

.

P o. Box 14000, JUNO BEACH, FL 33408 FLORIDA POWER & LIGHT COMPANY September 9,1983 L-83-481 bCS Mr. Richard C. DeYoung Director, Of fice of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. DeYoung:

Re: Turkey Point Units 3 & 4 Docket Nos. 50-250 & 50-251 10 CFR 2.201 Response to Notice of Violation Dated August 15,1983 Florida Power & Light Company has reviewed your Notice of Violation dated August 15, 1983, which references inspection Report 83-15 and a response is attached.

A check for the amount discussed in the Proposed civil penalty is enclosed.

Very truly yours, f

o_L}. 2^. b(~o t[g]

obert E. Uhrig Vice President Advanced Systems & Technology REU/SAV/PLP/ cab Attachment cc:

Harold F. Reis, Esquire Mr. James P. O'Reilly Regional Administrator, Region 11 U. S. Nuclear Regulatory Commission l

[$'

l 8309160272 830909

\\ %

PDR ADOCK 05000250

\\

G PDR PEOPLE., SERVING PEOPLE

  • g 4

4 ATTACHMENT Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 & 50-251 Proposed Civil Penalty EA 83-49 Notice of Violation FINDING:

Technical Specification 3.8.4 requires two operable AFW pumps and associated flow paths when the reactor is above 350 degrees F.

Contrary to the above, with Unit 3 in power operation, all AFW pumps were found inoperable on April 19, 1983, at approximately 6:30 a.m. A contributing factor to this violation was a retagging operation on April 14,1983, of two AFW steam supply valves which was accomplished without independent verification, as required by Procedure AP 0103.4, "In Plant Equipment Clearance Orders," Step 4.8 and Figure 3, which implements Technical Specification 6.8.l.

RESPONSE

1.

FPL concurs with the finding.

2.

The reasons for the finding are discussed in detail in your inspection Report 50-250/83-15 and 251/83-15.

a 3.

The corrective action taken was to open the valves, verify AFW system alignment, and test run AFW pumps B and C. Additional corrective etion is discussed in our letter L-83-249 dated April 21,1983, and in our letter PNS-LI-83-321-1 dated May 3,1983.

2 i

4.

The corrective action to prevent recurrence was also discussed in Inspection i

Report 50-250/83-15 and 50-251/83-15.

4 As requested by your August 15, 1983 cover letter to the Notice of Violation, additional corrective action taken to prevent recurrence was to:

a) Revise the nuclear turbine operator logsheets to upgrade the instructions for verifying the auxiliary feedwater flowpaths, b)

Submit a proposed change to Technical Specifications to perform monthly walkdowns of safety systems flowpaths. (See our letter L-83-302, dated May 13,1983.)

c)

Institute a program of monthly walkdowns of safety systems flowpaths to implement the proposed Technical Specifications.

d)

Form a task force at the plant site to review and upgrade specific equipment control areas related to the finding such cs locked valves, key j

control, and equipment labeling.

l i

~.

l l

e) initiate a program of periodic meetings with all operating shifts to emphasize procedure adherence and the importance of fully and correctly performing any jobs assigned.

i f)

Form a task force ut our headquarters to examine areas including quality assurance, security, licensing and engineering and upgrade our capability to identify potential problems in these areas.

5.

Full compliance was achieved on April 19,1983, when the Auxiliary Feedwater System was restored to normal.

6 1

. x,E G.~a_qw:.a

-v m w u m.,s e -

.mewm.m

-9m 9"

021468 vouCHFR ~O CHicuD 63 738 o,7, August 31,

,,83 FLORIDA POWER & UGHT COMPANY ca me aa. puno

    • ttMn'lii20CCC0QQc_rs 100,000.00 PAY TO THE ORDER OF FLORIDA POWE MT C PANY / MIAMI, FLORIDA l

U. S. Nuclear Regulatory Cc==ission

,y L_

._J M '#

Sv

/

/ Q SOUTHE AST BANK N.A.

geO 214 GB n' ::0G 3 L0 7 380s:

10 7 4 20 2 2 G :'

MI AMi, FLORIDA 33131 REMITTANCE ACVICt -TEAR OFF BEFORE DEPOslTING - NO RECEIPT REOUIRED IN FULL SETTLE vf NT OF TMt FOLLOW'NG INVOICES DATE invoice O R List NO.

l AMOUNT DATE I invoice OR LtST NO.

AMOUNT 9 hl.1

$ 100,000.00 96 FLORfDA POWER & UGH UPANY / MIAMI. FLORIDA O

{

STATE OF FLORIDA

)

)

ss.

COUNTY OF PALM BEACH )

k J. E. Vessely

, being first duly sworn, deposes and says:

That he is o Director of Florida Power & Light Company, the Licensee herein; That he has executed the foregoing document; that the statements made in this document are true and correct to the best of his knowledge, information, and belief, and that he is authorized to execute the document on behalf of said Licensee.

$~8

(

)

s J. E. Vessely Subscribed and sworn to before me this

/

9th fdgy of September 7,l9 83 l

/

%LAA La O \\

crub

/-

i NOTARY PUBLIC, in and for the County of Palm Beach, State of Florido.

Notsry PuMc. State of Florida r,t Dv;;e My Comm! zion Ex;4res April 20, 1056 My Commission expires: eehe theu k m.3 o Dondng Agency

+

9 c

e r -

w 3

%-.--9-