L-83-180, Forwards Info Presented at 830126 Meeting Re Plans & Schedules to Resolve Pressurized Thermal Shock at Facilities,In Response to NRC 830201 Request.Util Plans to Focus Effort on Flux Reduction to Reactor Vessel Inner Wall
| ML17345B029 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 03/25/1983 |
| From: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| To: | Varga S Office of Nuclear Reactor Regulation |
| References | |
| REF-GTECI-A-49, REF-GTECI-SF, TASK-A-49, TASK-OR L-83-180, NUDOCS 8303300301 | |
| Download: ML17345B029 (6) | |
Text
i ~<j ftFG<>>L<<<OR~AFQR>><ATION D<S<RXBUT<0<4 SrENI (R<08)'CCESSIONi.NBR:8303300301; DOCr.OAiTE: 83/03/25 NOITARI2ED". NO, OOCKEITi rr:
FACKLI:50. 250 T1rr key. Ptiijnt< Pile'nti Unj t 3r" Filor jdal Pbwer, ahd LIjoht Cl 05000250 50-251. Turkey. Pioiint>> Pilahti. Unjt 4'i Filoridar Power and Llioht, Cl 05000251.
AUTH ~ iiIAiMEI
. AUTHOR AFFKLKAiTiIONi UHRIG'; Er Filo,r.abdal Power,;.L LIighti Cof..
RECK Pl. NAblEI RECIIPiIZNiTI AFFJLIIAiTIQNr VARG'AiS AD Doer at<Ing Rea'ctors Brahch 1.
~
W
'v I
1 SUBQECIT':
Fqr weirds in<for oresented<,
at>> 830126'eet lhalr e"ol a'ns L
scQyd'ales tor r esoilive, or assur) zed<. ther mail> shock at<.,
fa'c) I')ti lrs't { n<
- r. esoonsel toi iNRCI. 8'30201 r.eluest; Ut.j li. ol aha tor focus< ef foirti on< f liux' eduction< toi r ea'ctor 'esseli inner< wailili,~
O'ISTRIBUTKONi CQOEI:'049S COPiiESRECEIVED'SLITR'P ENCLI" SIZEI:
52'KTLE'R.
Subm,'l ttall4 Ther melli Shock tor Rea'ctor V'esseli NOTES':
. RECKP<IEiliTI I Dr CODEI/PIAPhEI NRR'RBii'CI 01 COPlES
LITER.'lilCLI 7<
7-RECK PiIEliliTI Iol CODE</NAI<IEI COPIES LITTR ENCLI INiTERNALto ELD'/HD$ 4" NRR-DiIRl NRR/O =</4jiTES(
N R R /OL,
~ OiIR" NRR'/OLv'ORABr NRR'/OSKJRSBi MRR/DBiTl/Gi13r R ES /D c.'Tl RG>>il 2".
12.
1.
1.
1<
1.
1.
1.
1<
0 1,i.
1 0
1 1:l.
1, MURLEiYeTr NRR V'ISS INGli G04'RR JOHFS, DiIRl NRR/OLI/AOSAI NRR/DSI. DIRE N
.i DIR'GI.
FK LEi 05i 1.
1 1.
1 1.
1 1
1 1
1 1
1 1.
1
.1 1
EXTERNAl,l: ACRS NRCI POR'TiIS 10 02",
6 6
1<
1, 1>>
i.
LPORl NS ICI 03>>
06 1
1 1.
1 TOT'ALI NURBER. OF( COPiIES REQUIRED.':
LITiTR 34'NCLI 32:
c
~ +I h
v r
q le
~
f'c 1
~
~"
e )age 1
. BOX 14000, JUNO BEACH, FL 33408 Q hg FLORIOA POWER & LIGHT COMPANY March 25, 1983 L-83-180 Office of Nuclear Reactor Regulation Attention:
Nr. Steven A. Varga, Chief Operating Reactors Branch gl Division of Licensing U.
S.
Nuclear Regulatory Commission Washington, D.
C.
20555
Dear Mr. Varga:
Re:
Turkey Point Units 3
5 4 Docket Nos.
50-250, 50-251 P res sur ized
~ Thermal-Shock Your letter dated February 1,
1983 requested that we submit the information presented in our January 26, 1983 meeting regarding our plans and schedules to resolve Pressurized Thermal Shock at Turkey Point Units 3 8 4.
The attach-ments address our presentation and contain the information requested in your letter.
Attachment A:
Attachment B:
Attachment C:
Attachment D:
Attachment E:
Present Plant Status Vessel Flux Reduction Program Assessment of Safety Nargi ns Transient-Analyses Surveil la'nce Program We were also requested to address how much relief would be necessary with respect to plant safety limits to allow continued full power operation.
This relief would consider the fuel management necessary to reduce flux to acnieve end-of-life operation without exceeding the screening criteria.
The assistance we requested from the NRC fell into three broad categories:
1.
RETRAN APPROVAL We plan on performing our plant specific transient analyses utilizing the RETRAN Code.
This Code has been recently submitted by a User's Group for NRC review and approval.
We request a quick review of RETRAN to prevent us from expending manpower utilizing a code that may not be acceptable to the NRC.
We request that the NRC provide at least a preliminary opinion of the User's Group submittal by Nay 1983.
2.
EXTENSION OF TECHNICAL SPECIFICATION LINITS Based on our preliminary evaluations, we foresee no need for Appendix K
exemptions or rel axations.
However, to achi eve the aesired flux'reduction in Turkey Point Unit 3, Cycle 9, scheduled to start operation in early 830330030i 830325 PDR ADOCK 05000250 P
PDR PEOPLE... SERVING PEOPLE
IS
~ g t
t ~
r
in ~
. 's.'Of'rÃce of Nuclear Rea r Regulation Page 2
Decenber
- 1983, an increase in the F>w limit of the Technical Specification is required.
To achieve the higher P>H without a
power limiting reduction in the Fn limit, we need aPProval of the imProved LOCA Ref1ood Model (BART) a7ready submitted by westinghouse.
This approval is required by August 1, 1983, to support our anticipated Technical Specification amendment to increase the F~H limit in a timely manner prior to startup of Cycle 9.
Approval of the Westinghouse High Burnup Topical is also needed in 1983.
Approval of a Technical Specification change to increase the enrichment limit for the Turkey Point Unit 4 Cycle 10 (Spring 1984) will be dependent upon that approval.
In future cycles it may be necessary to increase F>
parameters of the Westinghouse Improved Thermal Design Procedure (ITDL) for which generic NRC approval has already been obtained.
A longer term topical which needs NRC approval, and which will greatly affect FPL's flux reduction effort is the Advanced LOCA Ref1ood Model (BASH).
3.
FORMULATION OF CCEPTANCE CRITERIA Scheduled to be submitted in 1983.
We plan on focusing the bulk of our efforts on flux reduction to the reactor vessel inner wall.
- However, we intend on submitting plant specific analyses to justify operation past the 3OODF RT>> screening criterion, should our best effort at flux reduction not be abTe to ccmpletely,limit the increase in RTNOT, Therefore, we request that NRC expeditiously develop acceptance cr>teria for these plant specific analyses.
These criteria should include acceptable transient probabilities as well as analytical
- pressure, temperature and fracture mechanic results.
We appreciated the opportunity to present our plans to your staff and look forward to working actively with you in the future.
We will conti nue to canmunicate the results of our work to you as our effort progresses.
Very ly yours, Robert E. Uhrig Vice President Advanced Systems 5 Technology REU/JEM/js Attachments cc: J.