L-83-132, Responds to NRC 830222 Telcon Re Violations Noted in IE Insp Rept 50-389/82-71.Corrective Actions:All Pipe Support Discrepancies Will Be Documented Per Site Procedures & All Reinsps Will Be Completed by 830311

From kanterella
(Redirected from L-83-132)
Jump to navigation Jump to search
Responds to NRC 830222 Telcon Re Violations Noted in IE Insp Rept 50-389/82-71.Corrective Actions:All Pipe Support Discrepancies Will Be Documented Per Site Procedures & All Reinsps Will Be Completed by 830311
ML20072U712
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 03/10/1983
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20072U698 List:
References
L-83-132, NUDOCS 8304110401
Download: ML20072U712 (1)


Text

f e

P. O. BOX 14000, JUNO BEACH, F L 33408 usNRC RE3 $. b x \\ ///,

a n Tl:, n -

G

.~

b FLORIDA POWER h LIGHT COMPANY March 10, 1983 L-83-132 Mr. James P. O'Reilly Regional Administrator, Region II U.S. Nuclear Regularoty Commission 101 Marietta Street, Suite 3100 A tla n ta, Georgia 30303 RE: RII: WPA St. Lucie Unit No. 2 Docket 16. 50-389/82-71 Florida Power & Light, on February 11, 1983 provided a Final Response to the violation " Pipe support Discrepancies".

Per telecon with your Mr.

J.

Blaue on February 22, 1983, Florida Power & Light is providing a supplemental response to the above violation.

On February 17, 1983, subsequent to filing a response to the violation 50-369/82-71-01, FPL was requested per telecon to either reinspect the original sample of 125 hangers for all characteristics or select 50 more hangers from the group in question and inspect them for all characteristics.

FPL elected the later and reported the results to Mr. J.

Blake of Region II on February 22, 1983. Discrepancies were found, though of a minor nature; therefore, FPL committed to reinspecting the approximately 525 hangers remaining from the original 1981 group. Restraints not accessible will be reviewed for reinspections which have been performed during 1982 and 1933.

All discrepancies noted will be docudented per applicable site procedures.

All reinspections will be completed by March 11, 1983.

Very truly yours,

/-

L/

Robert E. Uhrig Vice President Advanced Systems and Technology 8304110401 830318 PDR ADDCK 05000389 0

PDR PEOPLE.. SERVING PEOPLE