L-82-417, Informs That Requirements Stated in Generic Ltr 82-12 Re Staff Working Hours Adequately Enforced by Incorporation in Administrative Procedures.Amend to Tech Specs Unnecessary at Present Time

From kanterella
(Redirected from L-82-417)
Jump to navigation Jump to search
Informs That Requirements Stated in Generic Ltr 82-12 Re Staff Working Hours Adequately Enforced by Incorporation in Administrative Procedures.Amend to Tech Specs Unnecessary at Present Time
ML17213A538
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 09/30/1982
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
GL-82-12, L-82-417, NUDOCS 8210060288
Download: ML17213A538 (4)


Text

REGULATORY 4FORMATION DISTRIBUTION SYS EM (RIDS)

ACCESSION NBR:8210060288 DOC.DATE: 82/09/30 NOTARIZED: No FACIL:50"335 St. Lucie P la'nti Unit ii Florida PoWer 8 Light Co.

50-389 St< Lucie Planti Unit 2> Florida Power 8 Light Co.

AUTH ~ NAME AUTHOR AFFILIATION UHRIGiR ~ Ee Florida Power 8 Light Co.

REC IP ~ NAME RECIPIEN'I AFFILIATION EISENHUTED.G.

Division of Licensing DOCKET 05000335 05000389

SUBJECT:

Informs that requirements stated in Gene staff working hours adequately enforced administrative procedures'mend to Tech

. at present time.

DISTRIBUTION CODE:

8021 8 COPIES RECEI VED: LTR TITLE: OR/Licensing Submittal: General'istributi ri c Ltr 82" 12 re by incorporation in Specs uncessary ENCL SIZE:

on NOTES:

RECIPIENT ID CODE/NAt4E NRH ORB3 BC 05 KREUTZEREP.

NELSONEC ~

01 COPIES LTTR ENCL 1

1 1

0 1'1 RECIPIENT ID CODE/NAYIE LIC BR 03 BC 05 LIC BR P$

LA NERSESEV

~

01 COPIES LTTR ENCL 1

1 0

1 1

INTERNAL: ELD/HDS2 IE/DEP/EPLB NRR/DE/EQB 14 NRR/DE/HGEB

'17 NRR/DE/MTEB 19 NRR/DE/SAB 26 NRR/DHFS DEPY12 NRH/OHFS/LQR NRR/DHFS/PTRB22 NRR/DL/ORAB NRH/OS I/AEB 28, NRR/DSI/CPB 1 1 NRR/DSI/ETSB 13 NRR/DSI/PSB 21 NR RSB

- 2b EG l.

LE 00

/MIB 1

0 3

3 l.

1 1

1 1

1 1

1 1

1 1

1 1

1 0

1 1

1 1

1, 1

1 1

1 1

1 1

1 0

IE/DEP EPDS NRR/DE/CEB 09 NRR/DE/GB

,15 NRR/DE/MEB 20 NRR/DE/QAB,

?3 NRR/DE/SEB 27 NRR/DHFS/HFEB16 NRR/DHFS/OLB NRR/DL D IR NRR/DSI/ADRS NRR/DSI/ASB 08 NRR/DS I/CSB 10 NRR/DSI/ICSB 18 NRR/DSI/RAB

?4 NRR/DST/LGB RGN2 1

1 1

1 1'

1 1

1 1

1 1

1 1

0 1

0 1

1 1

1 1

1 1

1 1

1 1

1 EXTERNAL: ACRS LPDR NS I'C 29 03 06 8

8 1.

1 1

1 FEMA REP OI V NRC POA 02 NTIS 1

1 1

1 1

1 E

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 57 ENCL 50

W r

l'R'i FW rw rlr><<W j,'

W "~ rrw f i<<l+ W1

~'r ref

('W>RWli li> I cw i wRWII WJR W

1 K IW f,w ",'4 ii F<<if>

'm ~

e

~

w Fill '1 r)W>W>W il,,il R<< f r'm $

C1w W, m,"I Jr> ~ !1 w>

Wiw g (RR 'rr>>1 hejleWF<<

jl rr )

<<Rr It 1$ >,j W> >F<<'r~

m'jjwmh i' 'I 1 jC r l(rl 'I'I i>le>$

>R 5

>W>W,'m I i<<

'feme,r<<C h<<Cf W>>'<<j~,'

lf

> mr Rr>, Cn C,

e ee e>ee ee ~ e II 1')

>I j

i '$ >i'jlrg,' Ij'rkjw WC<< f II jril "W,'f j ~ f >'

I,'1'W l "

h, Ij >,W P f '<<ll, I r>jh f,'mr I',R<<) f

>j II w I lh JL R J e %>e

~ jw' Il i1 F

C>

II rj I

g'w Ih]I RW I

I<1

>I R

g C

Rl' I

<<WI

'I I Fh er

. BOX 14000, JUNO BEACH, FL 33408 FLORIDAPOWER 5 LIGHT COMPANY September 30,'982 L-82-417 Office of Nuclear Reactor Regulation Attention:

Mr. Darrell G. Eisenhut, Director Division of Licensing U.S.

Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Eisenhut:

Re:

St. Luci e Units 1 and 2

Docket No. 50-335 and 50-389 Generic Letter 82-12 Nuclear Power Plant Staff Working Hours Your Generic Letter 82-12, Nuclear Power Plant Staff Working Hours, transmitted your revi sed policy on overtime and requested that FPL review our past actions to assure that they are consi stent with it.

This Generic Letter was the latest in a series of clarifications on. the subject of overtime restrictions, that began in February 1,

1980 with 18E.Bulletin 80-02.

We have reviewed our current status regarding overtime restrictions ana conclude that they meet the spirit and intent of your policy statement.

Our current policy is the same which was in place and was reviewed against HUREG-0737 and found acceptable by Robert Clark in his Feburary 4, 1982 letter.

The same policy will be implemented for St. Lucie Unit 2.

This policy was reviewed and accepted by the NRC in NUREG 0843, Section

13. 5. 1. 1(l)f..

While there are several differences between NUREG-0737 and 82-12, the major difference appears to be the request to amend the administrative section of the Technical Specifications to assure the procedures and documentation required are followed.

It is our position that these requirements are adequately enforced by incorporation in the Administrative Procedures and amending the Technical Specifications is unnecessary at this time.

Very truly yours, Ro r t. Uhrig Vice President Advanced Systems and Technology REU/JEM/mbd cc:

Mr. James P. O'Reilly, Region II Harold F.

Rei s, Esquire "82iOOb0288 820930 PDR ADOCN 05000335

~P'D3 PEOPI.E.... SERVING PEOPLE

<<i;v I

f 4