L-82-356, Forwards Const/Startup Monthly Status Rept for Jul 1982. Target Fuel Load Date Is 821028
| ML17213A352 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 08/16/1982 |
| From: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| References | |
| L-82-356, NUDOCS 8208200085 | |
| Download: ML17213A352 (5) | |
Text
1 REGULATOR NFORMATION DISTRIBUTION EM (RIDS)
ACCESSION NBR;8208200085 DOC,DATE! 82/08/16 NOTARIZED:
NO FAOIL:50 389 St, Lucie Plant~
Unilt 2r Florida Power 8 Light Co, AVTH ~ NAME AUTHOR AFFILIATION UHRI G r R, E.
Florida Power L Light Co.
'REC IP ~ NAME RECIPIENT AFFILIATION EISENHUT<D.G ~
Division of Licensing
SUBJECT:
Forwards const/star tup monthly status rept for Jul 1982'arget fuel load date is 821028.
DISTRIBUTION CODE:
B001S COPIES ~RECEIVED:LTR, ENCL,~
SIZE!
,/
TITLE: PSAR/FSAR AMDTS and Related Correspondence NOTES:
DOCKET 05000389 RECIPIENT ID CODE/NAME A/D LICENSNG LIC BR 03 LA INTERNAL: ELD/HDS2 IE/DEP EPDS 35 NRR/DE/CEB 11.
NRR/DE/GB 28 NRR/DE/MEB 18 NRR/DE/QAB 21 NRR/DE/SEB 25 NRR/DHFS/LQB 32 NRR/DHFS/PTRB20 NRR/DS I/ASB 27 NRR/DSI/CSB 09 NRR/DSI/ICSB 16 NRR/DS I/RAB 22 NRR/DST/LGB 33 RGN2 EXTERKAL: ACRS 41 DMB/DSS (AMDTS)
LPDR 03 NSI~C 05 COPIES LTTR ENCL 1
0 1
0 1
0 1
1 1
1 2
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 2
2 10 10 1
1 1
1 1
1 RECIPIENT ID CODE/NAME LIC BR 03 BC
- NERSESgV, 01 IE FILE IE/DEP/EPLB 36 NRR/DE/EQB 13 NRR/DE/HGEB 30 NRR/DE/MTEB 17 NRR/DE/SAB 20 NRR/DHFS/HFEB40 NRR/DHFS/OLB 34 NRR/DS I/AEB 26 NRR/DSI/CP8 10 NRR/DSI/ETSB 12 NRR/DSI/PSB 19 RM/DDAMI/MI8 BNL(AMDTS ONLY)
FEMA-REP DIV 39 NRC -PDR 02 NTIS COPIES LTTR ENCL 1
0 1
1 1
1 3
3 li3 3
2 2
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 0
1 1
1 1
1 1
1 1
.TOTAL NUMBER OF COPIES REQUIRED:
LTTR 58 ENCL
.53
h Il 0
0 ll
. BOX 14000, JUNO BEACH, FL 33408 FLORIDAPOWER & LIGHTCOMPANY
'ugust 16, 1982 L-82-356 Office of Nuclear Reactor Regulation Attention:
Mr. Darrell G. Eisenhut, Director Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.
C.
20555
Dear Mr.'isenhut:
nil Re:
St. Lucie Unit 2 Docket No. 50-389.
Construction/Start-u Pro ress U date Attached is a report of the construction/start-up progress for St. Lucie Unit 2 for July, 1982.
If you have any questions regarding the attached information, or would like additional information from Florida Power 8
Light Company (FPL), please feel free to call me or W. B. Derrickson, the St.
Lucie Unit 2 Project General MIanager (305) 552-4659.
'ery truly yours, Robert-E.
Uhrig Vice President Advanced Systems 8 Technology REU/RAK/cab Attachment cc:
William H. Lovelace, Office Management 8 Program Analysis U. S. Nuclear Regulatory Commission J.
P. O'Reilly, Regional Administrator, Region II Harold F. Reis, Esquire
( 8208200085 8208ib PDR ADOCK 050003B9 R
PDR PEOPLE... SERVING PEOPLE
ST.
LUCIE UNIT 2 CONSTRUCTION/STARTUP MONTHLY STATUS REPORT CURRENT PERIOD:
July 1982 SCHEDULE STATUS: Overall Project Construction/Start-up Critical Path Variance Target Fuel Load Date MAJOR WORK HIGHLIGHTS:
89.4 88.6
-14. 0 10/28/82 RECElVED AUB '1 3 1982 Nucrear Ucensmg SCHEDULED ACTUAL 1.
Completed 2.
Completed 3.
Completed 4.
Completed 5.
Completed 6.
Completed 7.
Completed weldout of the RCB Construction Hatch Cover setting of ILRT Cabinets in the RAB the Bullet Proof Guard Station (Security Building)
Load Tests for the Cask Handling Gantry Crane (FHB)
Isophase Bus ties to transformers (CTO 67A)
Preconcentrator Ion Exchanger System CTO 44D)
Air Evacuation System (CTO 23) 07/15/82 07/15/82 07/10/82 07/20/82 06/18/82 07/08/82 07/15/82 07/13/82 07/15/82 07/12/82 07/20/82 07/27/82 07/21/82 07/15/82 BULK QUANTITY STATUS:
TOTAL QTY.
INSTALLED TO DATE QTY.
PERCENT COMPLETE TO DATE AVERAGE MONTHLY INSTAL. RATE (QTY/MO)
'0%
90%
CURRENT MONTH 7/82 TY. INST.
TO. DATE FORECASTED Concrete (cy)
Large Bor'e Piping (lf)
Small Bore Piping (lf)
Instrument Tubing (lf)
Large Bore Hangers (ea)
Whipping Restraints Cable Tray (lf)
Conduit (Exp.,
Emb.,
U/D)
(1f)
Lighting Conduit Power Cable Pull (lf)
Control" Cable Pull (Inc.
Comm. )
(1f)
Signal Cable Pull (lf)
Terms Pwr Hi (ea)
Terms
-. Pwr Lo (ea)
Terms.
Control (ea)
Terms - Signal (ea) 139,412 77,846 87,213 102,844 3, 741 516 39,828 360,514 108,380' 496,159 3.(773.(130 899,579.
. 473 11,305 44,624 17,648
- 99. 1
- 97. 5 91.2 85.5 85.3 90.4 97.6 96.6 90 '
90.5 81.8 71.0,
- 97. 1
- 94. 3 64.8
- 41. 8 256 558 917 1,240 151 7
5, 788 2, 018 8/395 14,277 41,304 162 1(261 1,665 ESSENTIALLY ESSENTIALLY ESSENTIALLY 4,130 100 ESSENTIALLY ESSENTIALLY ESSENTIALLY ESSENTIALLY ESSENTIALLY 77,730 45,470 ESSENTIALLY ESSENTIALLY 2,100 1/220 COMPLETE COMPLETE COMPLETE 4,155 135 COMPLETE COMPLETE COMPLETE COMPLETE COMPIZTE 90,790 44(455 COMPLETE COMPLETE 3,480 3,535 START-UP PROGRAM STATUS:
SCHEDULED TO DATE COMPLETED TO DATE SCHEDULE CURRENT FOR MONTH MONTH TOTAL
~RE UIRED System Turnovers (PTO)
System Turnovers (CTO)
Preoperational Test Procedures Preoperational Test Performed 301+
144+
205 136 276*
96*
203 23 33+
56+
3 113 12*
17*
1 7/52**
312 160 205 205
- NOTE:
Includes packages in sign-off circuit
- NOTE:
Includes preoperational tests in progress
+NOTE:
Information current as of Project Schedule dated 8/1/82.