Interim Deficiency Rept Re Failure of Reactor Shutdown Cooling Bypass Valves to Respond to Command Signals. Initially Reported on 820630.Final Rept Will Be Submitted by 821008
ML20058J232
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 08/02/1982
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
10CFR-050.55E, 10CFR-50.55E, L-82-325, NUDOCS 8208090205
Download: ML20058J232 (1)


Text

P. O. SOX 14('p0, JUNO DE ACH, f L 33408 u

o,

'; +': v ~

2 'Mr 5 A 8 : $ugu"s't 2,1982

^ " *'" ' "'

L-82-325 Mr. James P. O'Reilly Regional Administrator, Region II U. S. Nuclear Regulatory Commission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

Re:

St. Lucie Unit 2 Docket No. 50-389,50.55(e),82-014 VALVES WILL NOT RESPOND TO COMMAND SIGNALS On June 30, 1982, Florida Power and Light Co. (FPL) notified Region II Office of Inspection and Enforcement, in accordance with the require-ments of 10 CFR 50.55(e) of a potential deficiency regarding the failure of reactor shutdown cooling bypass valves to respond to command signals.

FPL is still reviewing this problem and will submit a final report by October 8,1982.

Very truly yours, b // /b h 4 Robert E 9

Vice President

. Advanced Systems and Technology REU/ cab cc:

Director of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D.C. 20555 8208090205 920802 PDR ADOCK 05000389 5