L-82-253, Forwards Const/Startup Monthly Progress Rept for May 1982

From kanterella
(Redirected from L-82-253)
Jump to navigation Jump to search
Forwards Const/Startup Monthly Progress Rept for May 1982
ML17212B701
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 06/18/1982
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
L-82-253, NUDOCS 8206280426
Download: ML17212B701 (6)


Text

REGULATORY IFL ATION DISTRIBUTION S EM IDS)

AOCBS SION NBR:8206280426 DOC ~ DATE: 82/06/18 NOTARI'ZED:

NO FACIL:50-389 St; Lucie Plant~

Unit 2> Florida Power L Light Co+

AUTH ~ NAME AUTHOR AFFILIATION UHRIGg R,E, F I or ida, Power L

Li'ght Co, "RHC IP ~ NAME RECIPIENT AFFILIATION EISENHUT~D,G.

Division of Licensing

SUBJECT:

Forwards const/startup monthly progress rept for May 1982.

DISTRIBUTION CODE:

B001S COPIES 'RECEIVED:LTR ENCL SIZE:

l TITLE: PSAR/FSAR AMDTS and Related Correspondence NOTES:

DOCKET 05000389 RECIPIENT ID CODE/NAME A/D LICENSNG LIC BR 03 LA

COPIES, RECIPIENT LTTR ENCL ID CODE/NAME 1

0 LIC BR 03 BC 1

0 NERSESgV

~

01 COPIES LTiTR ENCL 1

0 1

1 INTERNAL: ELD/HDS2 IE/DEP EPDS 35 MPA NRR/DE/EQB 13 NRR/DE/HGEB 30 NRR/DE/MTEB 17 NRR/DE/SAB 24 NRR/DHFS/HFEB40 NRR/DHFS/OLB 34 NRR/DS I/AEB 26 NRR/DSI/CP8 10 NRR/DSI/ETSB 12 NRR/DSI/PS 8 19 B

23 04 EXTERNAL:

ACRS 41 DMB/DSS (AMDTS)

LPDR 03 NSIC 05 1

0 1

1 1

"0 3

'3 2

2 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

10 10 1

1 1

1 1

1 IE FILE IE/DEP/EPLB 36 NRR/DE/CEB 11 NRR/DE/GB 28 NRR/DE/MEB 18 NRR/DE/GAB 21 NRR/DE/SEB 25 NRR/DHFS/LQB 32 NRR/DHFS/PTRB20 NRR/DS I/ASB 27 NRR/DS I/CSB 09 NRR/DSI/ICSB 16 NRR/DS I/RAB 22 NRR/DST/LGB 33 RGN2 BNL(AMDTS ONLY)

FEMA REP OIV 39 NRC PDR 02 NTIS 1

1 3

3 1

1 2

2 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

'2 2

1 1

1 1

1 1

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 58 ENCL,53

~

'I

FLORIDAPOWER & LIGHTCOMPANY June 18, 1982 L-82-253 Office of Nuclear Reactor Regulation Attention:

Mr. Darrell G. Eisenhut, Director Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.

C.

20555

Dear Mr. Eisenhut:

Re:

St. Lucie Unit 2 Docket No. 50-389 Construction/Start-u Pro ress U date Attached is a report of the construction/star t-up progress for St. Lucie Unit 2 for May, 1982.

If you have any questions regarding the attached information, or would like additional information from Florida Power

& LIght Company (FPL), please feel free to call me or W. B. Derrickson, the St. Lucie Unit 2 Project General Manager (305) 552-4659.

Very truly yours, Robert E. Uhrig Vice President Advanced Systems 5 Technology REU/RAK/cab Attachment cc:

W. H. Lovelace, Office Management 8 Program Analysis U. S. Nuclear Regulatory Commission J.

P. O'Rei lly, Regional Administrator, Region II Harol.d F. Reis, Esquire

'.8206280426 820&is

'DR.', ADOCK'.05000389 ii-A'. '.',

'"'DR "."

PEOPLE... SERVING PEOPLE

~

t

CURRENT PERIOD:

May 1982 ST L~E UQjg 2 CONSTRUCTION/STARTUP

~ MO Y STATUS REPORT il

/

i'l,

~ "

i I SCHEDULE STATUS:

Overall Project

~ 88.3%,.

Construction/Start-up 86.4%

Critical Path Variance

-9.0 weeks Target Fuel Load Date 10/28/82 MAJOR WORK HIGHLIGHTS:

SCHEDULED ACTUAL

-1 2.

3.

4.

5.

6.

7.

8.

Completed Cold Hydro Static Test Completed South End TGB Laydown Slabs Compl. Install. of the FHB Fuel Transfer Tube Bellows Cover Started Install. the RCB Refueling Cavity Fuel Upender Completed Construction of Main 6 Auxiliary Trans.

(CTO-67),

Compl. Construction of Process Blowdown System

('CTO-119)

Compl. Construction of Turbine Controls System

('CTO-70)

Started Construction of Hydraul'ic Lift Platform 03/24/82 06/01/82 05/25/82 05/07/82 06/01/82 05/31/82 04/15/82 05/01/82 05/26/82 05/26/82 05/18/82

- 05/17/82 05/25/82 05/19/82 05/11/82 05/01/82 BULK QUANTITY STATUS:

TOTAL TO DATE' CURRENT MONTH UANTITY'VERAGE MONTHLY XNSTAL., RATE (QTY/AO) 10% 90%

QUANTITY QUANTITY PERCENT 05/31/82 05/82 TO DATE FORECASTED Concrete (cy)

Large Bore Piping (lf)

Small Bore Piping (lf)

Instrument Tubing (lf)

Large Bore Hangers (ea)

, Whipping Restraints Cable Tray (lf)

Conduit (Exp.,

Emb.,

U/D (lf)

Lighting Conduit Power Cable Pull (lf)

Control Cable Pull (Xnc.

Comm. )

(1f)

Signal Cable Pull (lf)

Terms - Pwr Hi (ea)

Terms - Pwr Lo (ea)

Terms Control (ea)

Terms - Signal (ea) 138,495 75,980 85,783 96,246 3,544 486 39,828 349,321 102,648 478,951 1,730,225 817,330 466 3.0, 791 41,030 13,647 98.7 95.2 89.9 93.3.

80.3 86.5 97.7 95.2 86.2 88.3.

79.9

64. 7 95.7 90.9 59.8 32.3 ESSENTIALLY ESSENTIALLY 3., 305 ESSENTIALLY 124 5

ESSENTIALLY ESSENTXALLY J,563 3.6(969 47,295 COMPLETE COMPLETE 3,470 COMPLETE 100 20 COMPLETE COMPLETE 2,160 211 230 84(090 84,584 46(060 ESSENTIALLY COMPLETE ESSENTIALLY COMPLETE (3.49) 2(140 209 3.(050 4,400 135 25 2,060 251215 90(790 44(455 3)480 3(535 START-UP PROGRAM STATUS:

SCHEDULED TO'DATE COMPLETED SCHEDULE TO'DATE

- FOR MONTH CURRENT "MONTH TOTAL REQUIRED System Turnovers (PTO)

System Turnovers (CTO)

Preoperational Test Procedures Preoperational Test Performed

'll 263 119 205 109 241*

74*

203 15 40 55 3

94 28*

20*

1 1/44**

305 162 205 205

  • NOTE:

Includes packages in sign-off circuit

    • NOTE:

Includes preoperational tests in progress

0 O'

~%

'I

<'j.'JQ< g )-4a) 4

,~,

yV