L-82-171, Forwards Const/Startup Progress Rept for Mar 1982

From kanterella
Jump to navigation Jump to search
Forwards Const/Startup Progress Rept for Mar 1982
ML17212B558
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 04/26/1982
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
L-82-171, NUDOCS 8204300340
Download: ML17212B558 (4)


Text

e

~ v"~

.*.w REGULATO INFORHATION DISTRIBUTION TEM (RIDS)

AOCESSION NOR: 820 l300340 DOC ~ DATE: 82/00/26 NOTARIZED:

NO

,FACIL:50-389 St, Lucie P lant'ni(t 2i Fl or ida Power 5 Light Cos AUTH ~ NAME AUTHOR AFFILIATION UHRIGe R ~ E, Fl or i da Power L Light Co,

~REC IP ~ NAME RECIPIEN'T AFFILIATION EISENHUT< D ~ G ~

D i v i s ion of Licensing

SUBJECT:

Forwar ds const/startup progress r ept for Mar 1982 ~

DISTRIBUTION CODE:

BOOIS COPIES RECEIVED:LTR g

ENCL jSIZE:

TITLE: PSAR/FSAR AHDTS 'and Related Correspondence NOTES:

DOCKET ¹ 05000389 REC IP IENT ID CODE/NAME A/D LICENSNG LI(e BR ¹3 LA INTiERNAL: ELD IE FILE IE/DEP/EPLB 36 NRR/DE/CEB 1 1 NRR/DE/GB 28 NRA/DE/MEB 1 8 NRA/DE/QAB 21 NRR/DE/SEB 25 NRR/DHFS/LQB 32 NRR/DHFS/PTRB20 NRR/DSI/ASB 27 NRR/DSI/CSB 09 NRR/DSI/ICSB 16 NRR/DS I/RAB 22 NRR/DST/LGB 33 RGN2 lEXTERNAL: ACRS ll FEHA REP DI V 39 NRC PDR 02 NTIS COPIES LTTR ENCL 1

0 1

0 1

0 1

1 3

3 1

1 2

2 i

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 2

2 10 10 1

1 1

1 1

1 RECIPIENT ID CODE/NAME LIC BR 43 BC NERSES g V ~

0 1 IE 06 IE/DEP EPOS 35 HPA NRR/DE/EQB 13 NRR/DE/HGEB 30 NRR/DE/YITEB 17 NRR/DE/SAB 24 NRR/DHFS/HFEBOO NRR/DHFS/OLB 30 NRR/DS I/AEB 26 NRR/DSI/CPB 10 NRR/DSI/ETSB 12 NRR/DSI/PSB 19 NRR DSI/RSB 23 IL 04 BNL (AMDTS ONLY)

LPDR 03 NSIC 05 COPIES LTTR ENCL 1

1 1

1i 1

0 3

2 2

1i 1

1 1

1 1

1 1

i 1

)TOTAL NUHBER OF COP IES REQUIRED ~

LTTR 58 ENCL

'53

>1 4

t,

5 % lit N

II l

PI A

FLORIDAPOWER & LIGHTCOMPANY April 26, 1982 L-82-171 Office of Nucl ear Reactor Regul ation Attention:

Mr. Darrell,G. Eisenhut, Director Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C.

20555

Dear Mr. Eisenhut:

iy(..

9 sg 6Z~

to Re:

St. Lucie Unit 2 Docket No. 50-389 Construction/Start-u Pro ress U date Attached is a report of the construction/start-up progress for St.

Lucie Unit 2 for March, 1982.

If you have any questions regarding the attached information, or would like additional information from Florida Power 5 Light Company (FPL), please feel free to call me or W. B. Derrickson, the St. Lucie Unit 2 Project General Manager (305) 552-4659.

Very truly yours, Robert E. Uhrig Vice President Advanced Systems 8 Technology REU/RAK/ga Attachment cc:

William H. Lovelace, Office Management 8 Program Analysis U. S. Nuclear Regulatory Commission J.

P. O'Rei lly, Regional Administrator, Region II Harold F. Reis, Esquire Q0o~

8 8 04 8 GC~HI-I PEOPLE... SERVING PEOPLE

ST.

L xE UNIT 2 CONSTRUCTION/STARTUP MONTHLY STATUS REPORT

" JRRENT PERIOD:

March 1982 "HEDULE STATUS:

Overall Project Construction/Start-up Critical Path Variance Target Fuel Load Date 86~3%

84.1%

-9.0 weeks 10/28/82 AJOR WORK HIGHLIGHTS:

SCHEDULED ACZUAI 1,

2.

3 ~

5.

6.

7.

8.

Turn over circulating water (CTO system 007)

Turn over sequence of events recorder (CTO system 63)

Turn over data acquisition and remote terminal unit

('CTO sys.

105)

Completed weld up of FHB escape hatch seal Completed final alignment of reactor coolant pump 2A2 Started insulation on the condensate system Construction completed work on Intake Cooling Water

('CTO sys.

5)

Construction completed work on HVAC-Battery room (CTO sys.

86A) 12/17/81 05/10/82 10/09/82 0.4/Ql/82 04/05/82 04/05/82 01'/05/82 04/30/82 03/24/82 03/30/82 03/30/82 03/24/82 03/16/82 03/05/82 03/29/82 03/29/82 BULK QUANTITY STATUS:

CURRENT TOTAL MONTH TO DATE QUANTITY QUANTITY 03/31/82 QUANTITY

'ERCENT AVERAGE MONTHLY INSTAL. RATE (QTY/MO)

.10%

90%

3 TO DATE FORECASTED Concrete (cy)

Large Bore Piping (lf)

Small Bore Piping (lf)

Instrument Tubing (lf)

Large Bore Hangers (ea)

Whipping Restraints Cable Tray (lf)

Conduit (Exp., Emb., U/D)(lf)

Lighting Conduit Power Cable Pull (lf)

Control Cable Pull (Inc.

Comm. )

(1f)

Signal Cable Pull (lf)

Terms Pwr Hi (ea)

Terms Pwr Lo (ea)

Terms Control (ea)

Terms Signal (ea) 137,793 75,510 84,110 88,284 3,353 481 39,823 339,799 100,248 456,259 1,616,967 659,053 463 10,194 38,027 9,809 49.9 95.1 86.2 55.4 23.2 15,949 ESSENTIALLY 808 1,281 (1,203) 98.6 ESSENTIALLY 94.7 ESSENTIALLY 88.5 4,930 86.4 4,905 76.0 127 85.6 3

97.7 ESSENTIALLY 93.3 ESSENTIALLY 84.2 2,772 83.9 27,284 76.7 '8,532 COMPLETE COMPLETE 3,730 4,340 100 20 COMPLETE COMPLETE 2,210 22,330 87,880 40,535 COMPLETE 600 2,225 800 4,400 4, 155 135 25 2,060 25,215 90,790 44,455 315 3,480 3,535 START-UP PROGRAM STATUS:

SCHEDULED TO DATE COMPLETED TO DATE SCHEDULE FOR MONTH CURRENT MONZ'H TOTAL REQUIRED System Turnovers(PTO)

System Turnovers(CTO)

Preoperational Test Proced.

Preoperational Test Performed 237 116 203 67 210*

55*

201 13 51 47

,,5 17/55*

22*

16*

3 2/$6**

325 164 203.

203

  • Includes packages in signoff