L-81-526, Forwards Const/Startup Progress Rept for Nov 1981

From kanterella
Jump to navigation Jump to search
Forwards Const/Startup Progress Rept for Nov 1981
ML17212B244
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 12/16/1981
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
L-81-526, NUDOCS 8112230200
Download: ML17212B244 (5)


Text

REGULATORY INFORMATION DISTR I 8 AOCESSION NBR:8112230200 DOC ~ DA'TE: 81/12/16 FACIL:50-389 St. Lucie Planti Unitt 2i Florida AUTH ~ NAME AUTHOR AFF ILIATION UHRIGiR ~ E ~

F 1 orida '.Power L Light Co, RBC IP ~ NAME RECIPIENT AFF IL'IATION EI'SENHUT<D.G.

Division of Licensing UTION SYSTEM (RIDS)

NOTARIZED:

NO Power L Light Co ~

DOCKET 05000389

SUBJECT:

Forwards const/Startup progress rept DISTRIBUTION 'CODE:

B001S COPIES 'RECEIVED:LTR TITLE: PSAR/FSAR AMDTS and Related Correspond NOTES:

SIZE:,

for.Nov'981, ENCL.J l

ence RECIPIENT ID CODE/NAME ACTION:

A/D LIGENS NG LIC BR P3 LA INTERNALS ELD IE/DEP/EPDB 35 MPA NRR/DE/EQB 13 NRR/DE/HGEB 30 NRR/DE/MTEB 17 NRR/DE/SAB 24 NRR/DHFS/HFEB40 NRR/DHFS/OLB 34 NRR/DSI/AEB 26 NRR/DSI/CPB 10 NRR/DSI/E~TSB 12 NRR/DS I/PSB 19 23 REG FILE 04 EXTERNAL: ACRS 41 FEMA REP 0 IV 39 NRC PDR 02 NTIS iCOP IES LTTR ENCL 1

0 1

"0 1

0 1

1 1

0 3

3 2

'2 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

16 16 1

1 1

1 1

1

'RECIPIENT ID CODE/NAME LIC BR P3 BC NERSESgV.

01 IE 06 IE/DEP/EPLB 36 NRR/DE/CEB 11 NRR/DE/GB 28 NRR/DE/MEB 18 NRR/DE/QAB 21 NRR/DE/SEB

?5 NRR/DHFS/LQB 32 NRR/DHFS/PTRB20 NRR/DS I/AS 8 27 NRR/DS I/CSB 09 NRR/DS I/I'CSB 16 NRR/DS I/RAB 22 NRR/DST/LGB 33 BNL(AMDTS ONLY)

LPDR 03 NSIC 05 COPIES LTTR ENCL 1

0 1

1

-3 3

3 3

1 1

'2 2

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

Ng g9 1S81 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 63 ENCL 58

I

~

Ik I

h

P.O. BOX 529100 MIAMI,FL 33152 y(lb'~

FLORIDAPOWER & LIGHT COMPANY December 16, 1981 L-81-526 Office of Nuclear Reactor Regulation Attention:

Mr. Darrell G. Eisenhut, Director Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.

C.

20555

Dear Mr. Eisenhut:

Re:

St. Lucie Unit 2 Docket No. 50-389 Construction/Start-u Pro ress U date Attached is a report of the construction/start-up progress for St.

Lucie Unit 2 for November, 1981.

If you have any questions regarding the attached information, or would like additional information from Florida Power 8 Light Company (FPL), please feel free to call me or Mr.

W. B. Derrickson, the St. Lucie Unit 2 Project General Manager (305) 552-4659.

Very truly yours, Robert E. Uhrig Vice President Advanced Systems 8 Technology REU/DME/ah Attachment cc:

William H. Lovelace, Office Management 8 Program Analysis U.

S. Nuclear Regulatory Commission J.

P. O'Rei lly, Director, Region II Harold F. Reis, Esquire goo I S

((

8ii2230200 8ii216 PDR ADOCK 05000389 R

PDR PEOPLE... SERVING 'PEOPLE

FLORIDA POWER 6 LIGHT COMPANY ST.

LUCIE UNIT 2 CONSTRUCTION/STARTUP MONTHLY STATUS REPORT CURRENT PERIOD:

November 1981

,SCHEDULE STATUS:

Overall Project Construction/Start-up Critical Path Variance Target Fuel Load Date 82.2 79.1 E 4,0 10/28/82 MAJOR WORK HIGHLIGHTS:

ECHEDUIZD ACIUAZ

. 1.

Start install spent fuel handling machine rails 2.

Start install security syst: em camera poles around perimeter 3.

Start install reactor internal alignment keys 4.

Start pulling security system perimeter cable 5.

Completed chemical feed (system

21) turnover to test 6.

Completed reactor'egulating (system

72) turnover to test 7.

Completed RTGB 6 HVCB (system 102) turnover to test 8.

Completed generator seal oil (system 26A) turnover to test 11/01/81 ll/20/81 12/14/81 3.1/23/81 11/10/Sl 11/17/81 3.0/23/81 10/30/81 11/()2/81 11/04/81 11/18/81 11/21/81 11/19/81 F11/19/81 11/11/81 12/03/81 BULK QUANTITY STATUS:

CURRENT TOTAL

~:.'MONTH TO DATE QUANTITY QUANTITY QUANTITY.

PERCENT AVERAGE MONTHLY INSTAL. RATE (QTY/MO) 10% -

90~D 11/Sl TO DATE FORECASTED Concrete (cy)

Large Bore Piping (lf)

Small Bore Piping (lf)

Instrument Tubing (lf)

Large Bore Hangers (ea)

Whipping Restraints (tn)

Cable Tray (lf)

Conduit (Exp.,

Emb.,

U/D.(lf)

Lighting Conduit (lf)

Power Cable Pull (lf)

Control Cable Pull(Inc.

Comm.) (lf)

Signal Cable Pull (lf)

Terms Pwr Hi (ea)

Terms Pwr Lo (ea)

Terms Control (ea)

Terms Signal (ea) 135,476 73,593 72,927 67,857 2,971 468 38,011 307,810 93,692 402,869 1,392,658 480,645 440 6,663 32, 741 8, 514 98.2 93.9 77.7 66.3 68.1 79.3 96.2 86.6 81.7

71. 1
64. 1 36.4 80.3 79.4 43.9 16.2 ESSENTIALLY ESSENTIALLY 2,351 4,254 124 6

ESSENTIALLY 10,392 1,003 22,963 82,153 37,635 15 464 1,265 1,579 COMPLETE COMPLETE 3,970 4,120 100 25 COMPLETE 7,360 2,280 24,730 97,950 38,730 30 530 2,530 1,090 4,400 4,155 135 25 7,700 2,060 25,215 90,790 44,455 25 315 3,480 3,535 START-UP PROGRAM STATUS:

Preoperational Test Proced.

System Turnovers (PTO)

System Turnovers (CTO)

Preoperational Tests Performed SCHEDULED TO DATE 203 182 68 16 COMPLETED TO DATE 197 156*

30*

4 SCHEDULE FOR MONTH 7

31 29 1

CURRENT MONTH 4

24*

6*

0 TOTAL

~RE UIRED 203 248 159 203

  • NOTE:

Includes Turnover. Packages in signoff circuit

(