L-81-510, Submits Instrumentation Installation Schedule for Inadequate Core Cooling Indication Per NUREG-0737.Full Sys Expected to Be Operational by 840115
| ML17212B183 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 12/03/1981 |
| From: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| References | |
| RTR-NUREG-0737, RTR-NUREG-737, TASK-2.F.2, TASK-TM L-81-510, NUDOCS 8112100228 | |
| Download: ML17212B183 (3) | |
Text
REGULATucY INFORPAT ION DISTRIBUTION>> ".YSTEtd
('R IDS)
AOCESSION NBR:8112100228 DOC ~ DATE: 81/12/03 NOTARIZED:
NO FACIL:50-389 St. Lucie Plant<
UniIt 2< Florida Power tt Light Co.
'AUTH ~ NAt<E AUTHOR AFFILIATION UHRIGg R,E ~
Florida Power L Light Co.
R EC IP s NAIF REC IP IENT AF F IL'I ATION EI'SENHUTiD.G.
Division of Licensing DOCKET 05000389
SUBJECT:
Submits instrumeqtation installation schedule for inadequate core cooling indication ~per NUREG-0737,Full sys expected
.to be oper ational by 840115.
oisTRisuTto>,
coos:
sashes casrss sscsrvso:cps sscL,Q stzs: J.
TITLE: PSAR/FSAR ANOTS and Related Correspondence NOTES:
RECIPIENT ID CODE/NAPE ACTION:
A/D LICENSNG LIC BR 03 LA INTERhAL; ELD IE/DEP/EPDB 35 HPA NRR/DE/EQB 13 NRR/OE/HGEB 30 NRR/DE/PTEB 17 NRR/DE/SAB 24 NRR/DHFS/HFEB40 NRR/DHFS/OLB 34 NRR/DSI/AFB 26 NRR/DSI/CPB 10 NRR/DSI/ETSB 12 NRR/DSI/PSB 19 N
23 EG F
04 EXTERNAL: ACRS 41 FERA-REP D IY 39
,NRC PDR 02 NTIS lCOPIES LTTR ENCL 1
1
(
1 3
2 1
1 1
1 1
1 1
1 1
1 16 1
1 1
1 RECIPIENT ID CODE/NAPE LIC BR 03 BC NERSESgV
~
01 IE 06 IE/DEP/EPLB 36 NRR/DE/CEB 11 NRR/OE/GB 28 NRR/DE/HEB 18 NRR/DE/GAB 21 NRR/DE/SEB 25 NRR/OHFS/LQB 32 NRR/DHFS/PTRB20 NRR/DS I/ASH 27 NRR/OS I/CSB 09 NRR/OS I/JCSB 16 NRR/OS I/RAB 22 NRR/OST/LGB 33 BNL(APiDTS ONLY)
LPDR 03 NSIC 05 COPIES LTiTR ENCL 1
1
))Vf,', s; 's"""~1
)TOTAL NUMBER OF COP IES REQUIRED:
L>TTR 63 ENCL
P.O. BOX 529100 MIAMI,F L 33152 PA 0'4%
FLORIDAPOWER & LIGHT COMPANY December 3,
1981 L-81-510 Office of Nuclear Reactor Regulation Attention:
Mr. Darrell G. Eisenhut, Director Division of Licensing U.S. Nuclear Regulatory Commission ltashington, D.C.
20555 og'
Dear Mr. Eisenhut:
i~
OE'Ce Re:
St. Lucie Unit 2 Docket No. 50-389 Inadequate Core Cooling (ICC)
Instrumentation Installation Schedule
'1rI Pursuant to FPL's commitment to meet item II.F.2 of NUREtiM737, FPL commits to have instrumentation for inadequate core cooling indication completely operational by January 15, 1984.
This commitment includes the completion-of installation of the system components:,on, the following. schedule:.
1)
All core exit thermacouples (CET) will be installed and readable in the -final totally safety grade system inclu-ding the gSPDS cabinets by initial criticality.
As a target a minimum of 4 CET'S/QUADRANT. will be functional by core load and readable from the gSPDS cabinets.
,'2)
The instrumentation necessary to display subcooling margin monitoring will be functional in the gSPDS cabinets by initial criticality with a target date of core load.
3)
The heated junction thermacouples (HJTC) will be func-tional in the gSPDS cabinets by June.,1983.
From June 1983 to November 1983 FPL expects to test and calibrate the full system and to issue a final test report.
Based on NRC approval of the test report the full system is expected to be operational by January 15, 1984.
Very truly yours, Rober E. Uhrig resident Advanced Systems and Technology cc:
J.P. O'Reilly, Director, Region II Harold F. Reis, Esquire 8ii2i00228 8ii20333, PDR ADOCK 05000389 I