L-81-204, Responds to NRC Re Violations Noted in IE Insp Repts 50-250/81-06 & 50-251/81-06.Corrective Actions: Procedural Changes Reviewed & Approved,Personnel Counseled & Flowmeter Replaced
(Redirected from L-81-204)
Jump to navigation
Jump to search
| ML17341A178 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 05/14/1981 |
| From: | Robert E. Uhrig Florida Power & Light Co |
| To: | O'Reilly J NRC Office of Inspection & Enforcement (IE Region II) |
| Shared Package | |
| ML17341A180 | List: |
| References | |
| L-81-204, L-81-205, NUDOCS 8106100157 | |
| Download: ML17341A178 (101) | |