L-81-124, Forwards Status Rept of Const/Startup Progress for Feb 1981

From kanterella
Jump to navigation Jump to search
Forwards Status Rept of Const/Startup Progress for Feb 1981
ML17209A876
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 03/20/1981
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
L-81-124, NUDOCS 8103260455
Download: ML17209A876 (6)


Text

~9'EGULA INFORMATION DISTRIBUTIO YSTEM (RIDS)

ACCESSION NBR:8103260955 DOC ~ DATE! 81/03/20 NOTARIZED'O FACIL050-389 StB Lucie Plant<

Unit 2P Florida Power L Light'o+

AUTH ~ NPME" AU/HOR AFFILIATION UHRIGER ~ E, F l or ida Power 8,Light Co ~

RECIP ~ NAME'FCIPIENT AFFILIATION EISENHUT'PDBGB Division of Licensing DOCKET ¹ 05000389

SUBJECT:

Forwards status rept of const/startup progress for Feb 19810 DISTRIBUTION CODE:

SOOIS COPIES RECEIVED:LTR +ENCL Q SIZE:"

TITLE': PSAR/FSAR AMDTS and Related Corr espondence NOTES:

RECIPIENT ID CODE/NAMF'CTION:

'/D LICENSNG RUSHBROOKPMR INTERNAL: ACCID EVAL BR26 CHEM ENG BR 08 CORK PERF BR'0 EMERG PREP 22" GEOSCIENCES 14 HYD/GEO BR 15 ILE 06 LIC QUAL BR MECH ENG BR 18 NRC PDR 02 OP LIC BR PROC/TST REV 20 R

S BR22" EG FILE 01 KNG BR25 Y

COPIES LTTR ENCL" 0

0 1

1 1

1 1

1 0

1 1

2 2

3 3

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

RECIPIENT ID CODE/NAME YOUNGBLOODEB NERSESEV ~

0 l AUX SYS BR 07 CONT'YS BR 09 EFF TR SYS BR12 EQUIP QUAL BR13 HUM FACT ENG BR IE,C SYS BR 16 LIC GUID BR MATL ENG BR 17 MPA OELD POWER SYS BR 19 QA BR 21 REAC SYS BR 23 SIT ANAL BR 24 SYS INTERAC BR COPIES LTTR ENCL 1

0 1

1 1

1 1

1 1

1 3

1 1

1 1

1 1

1 1

1 0

1 0

1 1

1 1

1 1

1 1

1 1

EXTERNAL: ACRS NSIC 27 05 16 16 1

1 LPDR 03 1

1 TOTAL NUMBER OF COPIES REQUIRED o LTTR 57 ENCL 51

A H

E't CI

'E f

+(Igy FLORIDAPOWER & LIGHTCOMPANY March 20, 1981 L-81-124 Office of Nuclear Reactor Regulation Attention:

Mr. Darrell G. Eisenhut, Director Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Eisenhut:

~ e/g tI'g" Pffft Q 6 t98j 8

rcpt g~

~8 e

r-n'~

Re:

St. Lucie Unit 2 Docket No. 50-389 Construction/Start-u Pro ress U date Attached is a report of the construction/start-up progress for St. Lucie Unit 2 for February, 1981. If you have any questions regarding the attached information, or would like additional information from Florida Power 5 Light

Company, please feel free to call me.

Very truly yours, Robert E. Uhrig Vice President Advanced Systems 8 Technology REU/TCG/mc Attachment cc:

Harold R. Denton, Director, Office of Nuclear Reactor Regulation James P. O'Reilly, Director, Region II Harold F. Reis, Esquire gooj 8~0826O Lfeg PEOPLE... SERVING PEOPLE

la I

It t

ti I

TI I I

> l4 1

a'" ll 41 ~ I'1 4 1

1 It.

~ ~

1 r

FLORIDA POWER 8 LIGHT COMPANY ST, LUCIE UNIT g2 CONSTRUCTION/START UP MONTHLY STATUS REPORT CURRENT PERIOD:

February, 1981 SCHEDULE STATUS:

Overall Project Construction/Start up Critical Path Variance Target Fuel Load Date 71,54 63,80 0,0 10/29/82 MAJOR WORK HIGHLIGHTS; 1.

Completed Dismantling CBSI Derrick 2,

Completed Installing Diesel Ext. Sil.

6 Pi'pe 3.

Set Safety Inj. Tks.

2A1 8 2A2 set in RCB 4.

Set 2 remaining MSR 2A 6 2D on Turb, Deck 5.

Comp.

Concrete Pl, for Pzr.

Roof in RCB 6.

Mobilized P. D,M. on Site to erect PWST 7.

Start exc. of Seal Well Discharge Canal 8.

Turnover Turb. Cooling Water System SCHEDULED 2/14/81 4/23/81 1/30/81 10/21/80 2/27/81 2/06/81 6/18/81 "4/01'/81 ACTUAL f

2/06/81 2/13/81 2/16/81 2/12/81 2/19/81 2/03/81 3/02/81 BULK QUANTITY STATUS:

TOTAL TO DATE PH S

C L

QUANTITY PERCENT CURRENT MONTH QUANTITY 0

DATE FORECASTED VERAGE MONTHLY INSTAL.

RATE (QTY,/MO.)

IOio -'904 Concrete 'cy)

Large Bore Pipe (ft)

Small Bore Pipe (ft)

Large Bore Hangers (ea)

Whipping Restraints (tn)

Cable Tray (ft)

Exposed and Embedded Conduit (ft)

Power Cable (ft)

Control Cable (ft)

Termination (ea)

START"UP PROGRAM STATUS:

Preoperational Test Procedures System Turnovers (Preliminary)

Preoperational Tests 121,893 59,787 68,573 2,289 162 31,648 309,854 254,201 847,678 13,977 SCHEDULED TO DATE 135 9

6 88,6 71,5 35 5

49,0 46,6 83.5 43.4 38.6 26,4 15.3 COMPLETED TO DATE 135 41 2

1,243 3,180 8,253 85 29

522, 7,901 26,381 172,935 3,518 CURRENT MONTH 2,850 2,150 6,890 110 15 1,850 9,300 36,340 174,200 3,520 TOTAL
REQUIRED, 195 136 195 2,720 1,920 7,250 130 25 1,210 8,470 26,740 125,920 4,875