L-80-315, Responds to IE Bulletin 80-18, Maint of Adequate Min Flow Thru Centrifugal Charging Pumps Following Secondary Side High Energy Line Rupture. Units Do Not Have Centrifugal Charging Pumps
(Redirected from L-80-315)
Jump to navigation
Jump to search
| ML17340A293 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 09/23/1980 |
| From: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| IEB-80-18, L-80-315, NUDOCS 8010240648 | |
| Download: ML17340A293 (1) | |
Text
y
'L
~
,g [j P I I;
qJf
~
P.O. BOX 529100 MIAMI,FL 33152 gflllj~
FLORIDAPOWER & LIGHTCOMPANY September 23, 1980 L-80-315 Mr. James P. O'Reilly, Director, Region II Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Dear Mr. O'Reilly Re:
R P
0-250 5-u letin 80-18 Florida Power
& Light has reviewed the subject Bulletin and has determined that it is not applicable to the Turkey Point units.
The units do not have centrifugal charging
- pumps, and the recir-culation lines on the safety injection pumps are not isolated on receipt of the Safety Injection Actuation Signal.
Five man-hours were expended preparing this report.
Very truly yours, Robert E. Uhrig Vice President Advanced Systems 8 Technology REU/PLP/ras cc:
- Director, NRC Office of Inspection and Enforcement Division of Reactor Operations Inspection Harold Reis, Esquire U"~'ICALQOPY PEOPLE...SERVING PEOPLE