L-80-315, Responds to IE Bulletin 80-18, Maint of Adequate Min Flow Thru Centrifugal Charging Pumps Following Secondary Side High Energy Line Rupture. Units Do Not Have Centrifugal Charging Pumps

From kanterella
(Redirected from L-80-315)
Jump to navigation Jump to search
Responds to IE Bulletin 80-18, Maint of Adequate Min Flow Thru Centrifugal Charging Pumps Following Secondary Side High Energy Line Rupture. Units Do Not Have Centrifugal Charging Pumps
ML17340A293
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 09/23/1980
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
IEB-80-18, L-80-315, NUDOCS 8010240648
Download: ML17340A293 (1)


Text

y

'L

~

,g [j P I I;

qJf

~

P.O. BOX 529100 MIAMI,FL 33152 gflllj~

FLORIDAPOWER & LIGHTCOMPANY September 23, 1980 L-80-315 Mr. James P. O'Reilly, Director, Region II Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Dear Mr. O'Reilly Re:

R P

0-250 5-u letin 80-18 Florida Power

& Light has reviewed the subject Bulletin and has determined that it is not applicable to the Turkey Point units.

The units do not have centrifugal charging

pumps, and the recir-culation lines on the safety injection pumps are not isolated on receipt of the Safety Injection Actuation Signal.

Five man-hours were expended preparing this report.

Very truly yours, Robert E. Uhrig Vice President Advanced Systems 8 Technology REU/PLP/ras cc:

Director, NRC Office of Inspection and Enforcement Division of Reactor Operations Inspection Harold Reis, Esquire U"~'ICALQOPY PEOPLE...SERVING PEOPLE