L-80-215, Forwards Response to IE Bulletin 80-08, Exam of Containment Liner Penetration Welds. Containment Boundary Butt Welds Identified.Field Welds Were Made During Const.Shop Welds Were Made by Penetration Assembly Fabricator
| ML17208A851 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 07/08/1980 |
| From: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| IEB-80-08, IEB-80-8, L-80-215, NUDOCS 8007250312 | |
| Download: ML17208A851 (14) | |
Text
P.O. BOX 529100, MIAMI,FL 33152 I I FLORIOA POWER & LIGHT COMPANY July 8, 1980 L-80-215 Mr. James P. O'Reilly, Director, Region II Office "of Inspection and Enforcement U.
S. Nuclear Regulatory Commission 101 Marietta Street, Suite 3100
- Atlanta, Georgi a 30303
Dear fir. O'Reilly:
Re RI I:JPO 50-335 If Bulletin 80-8 A reply to the subject Bulletin is attached.
Very truly yours, Robert E. Uhrig Vice President Advanced Systems
& Technology REU/MAS/paf Attachment cc:
Director, Division of Reactor Construction Inspection Harold F. Reis, Esquire 80072503(2-PEOPLE... SERVING PEOPLE
ATTACHMENT Re:
RII JPO 50-335 IKE BULLETIN 80-08 EXAMINATION OF CONTAINii1ENT LINER PENETRATION MELDS The subject 18E Bulletin requested data on Non Destructive Examination (NDE) performed on full penetration butt welds made between containment penetration assemblies and the penetration
- sleeve, and penetration assembly flued head to outer sleeve welds.
Figures 1 and 2, attached, illustrate the types of penetration assemblies utilitized at St. Lucie Unit ¹l.
Note that containment boundary butt welds have been identified on Figures 1 and 2, and consist of field welds made during construction and shop welds made by the penetration assembly fabricator, Tube Turns Division of Chemetron Corporation.
The date of issue of the Purchase Order with Tube Turns was June 30, 1971.
Fabrication of the penetration assemblies and shop welding was done in accordance with ASNE Section III, 1971 Edition.
The design specification for the assemblies and manufacturers and fabrication drawi ngs both required Radiography (RT) as the method for NDE in accordance with the code.
Tube Turns has been contacted and has assured that no exception was taken on any assembly to the RT examination requirements (see Tube Turns letter dated 6/2/80, attached).
The following and Table 1, attached, are our responses to the action items enumerated in'he subject Bulletin and are directed to the field welds only:
1.
Penetration assemblies affected are as listed in Table 1 and illustrated in Figures 1 and 2.
2a. Although issue of the Construction Permit allowed the use of ANSI B31.1, St. Lucie Unit ¹1 committed to compliance with ANSI B31.7, 1968 Edition with 1969 Winter Addenda for construction.
Acceptance standards for non-destructive examination (NDE) were in accordance with the draft ASHE Section III, 1968 Edition with 1969 Winter, Addenda.
2b.
Type of NDE performed as per attached Table l.
2c.
Type of weld joints and joint details as per attached Table l.
2d. Results of NDE as per attached Table l.
3.
Radiographic examination of full penetration circumferential butt welds in penetration assemblies which are part of the containment pressure boundary is required per, code.
- However, when the joint detail does not permit radiographic examination such as on complex-designed mechanical penetrations, due to access limitations and/or geometric unsharpness factors, ultrasonic examination plus liquid penetrant or magnetic particulate examination may be used in lieu of radiography (reference ASNE Section III, NE 5211.1).
This option was exercised on approximately 50$
of the weld joints listed in Table 1, since ultrasonic examination is, by
- code, an acceptable alternate to radiography for volumetric examination of open root type butt welds.
A major concern in using ultrasonic exami nation for open root butt welds is that if a backing ring is used during welding, it may distort the results of the examination in the root area.
The welds listed on the attached Table and all shop welding were done without the use of backing rings or bars except in the case of penetrations P-40, P-64, and P-33.
As part of the final repair welds to these penetrations in order to preclude additional weld-induced residual
- stresses, backing strips were used for sections of the welds and the welds were accepted by ultrasonic examination.
The welds in Penetrations P-40
. and P-64 were examined by radiographic exami nation during a recent plant outage and were accepted.
Penetration P-33 is for the containment sump suction piping and is one of three Type IV penetration assemblies (see Figure 1).
The weld in question is located in the reactor auxiliary building pipe tunnel and would be extremely difficult to RT without disassembling the penetration.
Therefore it is impractical to RT P-33.
There is a high level of confidence in the integrity of the weld, however, based on the results of RT on P-40 and P-64.
The three penetrations were all assembled and inspected in accordance with the same codes and procedures during plant construction.
For these
- reasons, we are convinced of the integrity of the weld and no radiographic examination has been scheduled for P-33.
FIELD OP WELD
~ ~
~ ee
~ 0 Ova
~ LVO <<0 ~
~oooo reaaa <<o eoo
~of>>
~fool eoo+
'f OOT laor O
~oov<<pa a>>a
~I>>
~ 1 ~
~f~ oo
~ ~
~0>>
~OVP TICII oolvo>> <<loo
~ 1
~
~a ~ aa
'Ia>>
OO<<O>>oo Dv oael ~
~1
~
~ Ioaeepv 40>>aeC ~ IOIC Caco>>l aevaN>>1
~CO
~
aa ao Tc<<oo>>OCT cca>> RI>>4 f00 Dlealalla
~>> ae ~ OII0 alt>>D
~<<4 40>>401 aooaeT ~ 5 Roe>>0 oeoo opa>>444 Iaa 04 tat ~ oe CIICLI
~0 OICT>>
Ia 10OT ftl~I>> 0000<5
~\\
aaf
~OLLDP>>
ala e
~
~
~av<<>>tao 04 4 oalllo
~o'4 ~Ila,ot'oa 0
~OIL>> t>>T
' Ilpapalf
~4aac<<0
~ace ItttCoo tv E'1ttoat 1<<ae>>l ICIoll t'-.
~>>a>>IL ~ oawo
~ COO ae<<aaaa
~Lfl~ olao
~>>e<<at tartfo
~
~
~ ~'E.- - ~
04aaooaleatt 4<<>>lth CPILCRCTC C>>>>Pop\\4 afaa>>
~ ~
~
~
~
~
~
~
~
~ ~
~
~
~
~ e al <<
~
~
C
~tat 4 IOOICTO olaa>>r>> Lel,ll 0 C\\aaof tal>>4 4<<>>4IC tC) RNC>>OCL SOCCC:
~
I ~'
0 Joe>>IN taC4 Or ONLLJ
~ Oleo
<<0ll0 Oao
~aa f ~
~ 0
/>>.
~ ~ta<<pt att ooova>>
pa>>oa 1 0 Lao tlaat
~OCOOT<<at eaa >>OR FIELD WELD 4'
oal
~I
~pae<< ~
04 Ifo 4 Io<<
Clear
~Otoa ar ~Pa tlvo eoo r oooo>>>>o<<eoo iota CC La ahet TCOOCI
~'1 C 4$ 5 4'1 ~ 4 ~ PC
~llalta C lel Loot 'laeol
~at CO<<C'O'll\\
~
C>>>>avOLR ace>>>>>>
~
~ a
~ ~ t'a'
~ ~
l lifer ao
~'0 OCOICIC PfItl Oe>>a Tl or fr ~
~at<<o00 h>>+
' Otal<<a>>
I
~4'j ~IL>>0 ~ avo 0 Ca>> Itll I
'HOP 'ELD IIPLC OLTCO
~ I
~
~ at I
owP
~at hoh
~ aa 4 RautT 0h
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~ 1.'
~ o
~
~
~
~
~
~
~
o
~
~
~
~a<<oooafeo<<oa'l4<<a foa TTPT 5 0COTT04hOIC
~ Lt v I
CP OO>
~o 0 oo
~cato leo OLT0 4 0
OA CONC ~ 0 oa)
~ OL~ <<aat OCT <<CI ~ 4 VCtaa ANCHOR RING
~1441.
Coaro evotpt
~o 4I0 al SHOP WELD ao Oaara
~ OC IA I ~
P la a<<aataoo
~>>avf ~
~f ~ 1 ~ a
~ ~ L'
<<cavo af 1 ~ 1 ~
arvev ~
af \\aa ~
~\\O aoea
~ ~
~ aaf 0 4
~,0 FIELD WELD
+0~a'ToahOV
~ aat cato tall 0la Ia<<14 FIGURE. 1: TYPE I III &-IV PENETRATIONS
Jet et ~
~ T
,4 tvt
~ ~l FIELD WELD--
~ Ias to eh\\east aNtarahlpf
~tell lhp tto 4&\\4v etttaeaeha
'laatas
~ll a Pret h
~
apt Iaovaap
~th ~4aathhtvh CS
~SOJOIJ~ Isea i Wetths fapses eh
~ sl.~ catv,Itest ss r'/]
Ke 'lea hsN
~ e ee
~e aeslo j
~~fte tat10 t ~ tto ~ l ~
Nh eN tto t\\
to
~tllttt ~ evttaahoo JataOPJ e
ffhtthhtaeh Js.ft lf J1 as. les
$)
~e aah la ~I etaathahpt laaett J
~s Iles
~hIWtss gshea essf
~recta sq 4setsf acts teN ehsstaettss
)Shit'I aeSOCJ lta 4haS etN 1 fhstSS
~M4ho vav Slhfts
~rf ehshttafes
~ag trt o her I
JJ 4
~tl
~
- a. ~
OT t\\$ tt)
~ x r 4 %5%4 hts tf t
~hasf vvs m
~seS,thah) eatt44 Ne r,'IELD WELD.'IELD WELD I~ ha
\\
' tet fv rs Pha elf (4~
rt Il te cthe ovrfI peaas It t~
~t
~
e
~
/t,~
fte
~Met
~oahaa Neth seso
~a>>
tpra ~ fJ~\\~tar
~steat eetll 4
~a
~
te Nets
~I eso steal Nato
~
~tee s
T:
~e Ptsll alhTPh
~NtI
~Vhtahf Pv
~hsh stafsat
~4 Sfffaltss
~eel,elf sal f el 4 etttttatso Jaaeea J
~ thea A
PROCESS PIPE WELDED TO PENETRATION B
GUARD PIPE WELDED TO PENETRATION FIGURE 2:
TYPE II PENETRATIONS FOUR DESIGNS
Tube Turns Division cHEhtElRON CORPOAAnc'.V Box 32160. Louisville. Kentucky 40232 Telephone 502 774.6011 June 2,
1980 ECElVE JUAt 4 1980 KBCKO ENQIMEERi%
Ebasco Services Incorporated St. Lucie Plants 1 and 2
P. 0.
Box 1117 Jensen Beach, Florida 33457 Attention: T. A. Tarte, Project Engineer Tube Turns fabricated Containment Piping Penetration Assemblies for St. Lucie Plants 1 and 2 on Purchase Order HY-422564 from Ebasco Services Incorporated acting as age'nt.for Florida Power And Light.
For this contract, all butt welds joining the containment sleeve pipe to the multiple flued forging and all butt welds within the containment sleeve were subjected to 100% radiographic examination and found to be satisfactory to specification requirements.
Respectfully, S. D. Vitatoe Manager, Quality Assurance
/gjb
~~,
~
'c
~ V~V
~ r ~
EBA5CO 5ERV1CE5 INCORPORATED PKV.
NO,
- PEN, TYPE SERVICE LHLD NG, ESASCO O,D MELD PROC, (IN+)
- IHICX, (IN,)
FLORIDA POIlER & LICHT COHPANY tt osccv ST. LUCIE UNIT NO. 1 bhCFJIT sursccv~IIUE TION C CONTAlh".CNT PENETRATION MELDS SACERI RING I
~
NDE PERPORHED ops Ito PLO 5822 196 cttcctcco os
~S- 0 ossc RESULIS OP EXhGHATICI P-1 I
llhIN STEAN FM IC MP-100 60,0 1,2$
REJECTED C: l'T fOR EXIKSSIVK LI:ZAR DEFECTS ~ REPAIRED AND REJECT& CX L'T FOR NORE DEFECTS ~ REPAIRED h'.1D ACCEI TEII ON IllIRD UT, P"2 HAIN STEAN PM-IC bUTT MP 100 60.0 1,25 Nh RKJECTFD Cl UI FOR I.lliEAR DEFECTS ~
RK PAIRED AND ACCEPTED Ci SKCQtD UT.
P 3 I
~
I 1.25 I
~
1 SKVLl AREAS REJECTED C'IRST UT 3-13-75, RKPhlkKD h:RI TVO APEAS REJKCTLD C C
OVD UI 4 22 751 REPAIRED ASD ACCEPTED ON THlRD UT 5-I-75+
FEED'MATER FM 1C MP-100 4$.0' 1.25 1
CS, Nh X
Nh REJECTKD OH UT 3 18 7$, REPAIRED AHib TMO AREAS kEJECTED Cl UF '-22 75 ~
RE PAIRED ASD hCCEPTED Ci UT 5 1
75 P-5 1
1 P 6 I
III BLOMDOMN III SLOMDOMN FM-I PM 1 MP-100' I
I l
MP 100l I
I 10,7$
IOt75 0,594 I
0.$ 94
~
I l
CS I
i Nh NA REJECTED Ci UT 7-27-75 FOR DEFECT IS ROOT AT CiE POINT (APPR(N, 1" LCiC),
REPAIRED AND ACCEPIED OH UI 8 24 75 ~
RFJECTKD OH UT 7-26 7$ FOR EXCESSIVE ROOT HILT IllkOUCH~ REPhlkED hiD ACCKPIID dl UT 9 IS 7$ 1 P-7 PRIHARY MATER SUPPLY FM-I BUTT MP-64 2,375 t
0.344 NA
- ACCEPTED, I
A
}M-1h SUTT MP-43 I
2.375 0.344
'SS ACCKPTED.
I P-8 STATIOH AIR FM-1 MP>>24 I
I I
2t375 0.344 CS:
1 l
I kFJKC'lED Cl RT 10 7 75 ~ REPAIREU NHI ACCEPTED OH RT 10 28 7$i P 9 INSTRUHENT AIR PM-1 MP-24 2,375 0.344 Nh Nh Nh.
ACCEPTED.
P-10 II SII0!IN HVAC
~
1 48,0 1.0J CS i
1
~I NA ACCEPIKDa MELD bY HVAC CCiIRACTOR.
E8ASCO SERYlCES INCORPORATED a~car-2 or 6
cucor Fl ORIDA POMER 6 LICHT CCHPAHT
~toltcr~
orc wo.
FLO 5822.196 ocr r. ro.
~y H
J DRIES otrt 5 8 80 NRC BULLETIN 80 08:
EXAHINATION OF COHTAINHENT PENETRATION MELDS TABLE 1 (CelZNUED) ciicciito oy otrt
- PEN, NOi Pl"I.
TVPE SERVICE MELD NO, MELD TVPE EBASCO MELD PROC, O.D,
- THICK, (IH.)
(IN.)
BASE HETAL
- BACK, RING RT i
NDE PERFOIOIED LP RESULTS Or mslSATICH P
11 IIVAC 48,0 1,00 NA Hh NA
I 2i37$
Oi218 IHCONEL Hh.
Nh Nh
Hh Nh REJECTED AHD REPAIRED TACE ON RT, ACCEPTED OS THIRD RT.
P 15 CCM FRIRI PAH COOLER 1C FM 1 BUTT MP 24 8.62$
0.322 CS, NA.
l Nh NA
- ACCEPTED, P-16 CCM TO FAH COOLER 1C FM I MP 24 i I
Bi62$
Oi500 MELD NdIE AND ACCEPTED IEI RT 4~11~73, CUT ASD REMELLED LLE TO PIPiHiC HIE ALIC:DIECT, ACCEPiED AQI i 0N R 5 25 73 ~
P-17 CCM FRIPI FAN COOLER 1D MP-24.
I i
8,62$
Oi500 Hh I
Hh X
ACCYI'1LD, P-18 P-19 CCM TO FAN COOLER 1D CCM FROH FAN COOLER lh F'M 1 FM 1 MP-24 I
Bi62$
OiSOO CS
',62S O,SOO CS.
HA Nh X
9 Nh X
i ShvS AS P 16 (LXCEPZ FOR DA.ES) ~
SA'.IE AS P-16 (EXCEPT FOR DATES) ~
P 20 CCM TO FAH COOLER 1A I
I I
8 62S 0,500 SAIE AS P-16 (EXCEPT FOR DATES) ~
~ ~
P 21 CCM FR(PI FAN COOLER lb FM 1 MP 39 I Bi625 Oi500 CS Hh NA
- ACCEPTED, P 22 CCM TO FAN COOLCR 1B FM 1 MP 24 I
I Bi625 I
~
~
0,500 CS.
I X
I HA SANE AS P 16 (EXCEPT FOR DATES) ~
P-23 CCM TO R.C, PIDIPS FM 1 BVIT MP-39
(
I 8.62S O,SOO i
..I Nh.
Nh ACCEPTEDi
- ~':r
" I'
~
~
~
S ESASCO SERVICES (JICORPORATEO
~ ter~'r ogygssr~@'f~(YIMKR~fglJ EX@PA ST~IPJg JP{JJ h0~1>>A RA~CKP
~~OJEEEELEELEE I IIA lil SP >>INTA NNEIIT PBIETIIATISN NEESS ThbLE 1 (CONTINUED) ore wo.
0 22 I 6
~r IPR cssccsico or
~SS>>
oorc POI ~
NO>>
- FEH, TYPE SERVICE MKLD NO, MEI,D TYPE ebASCO MELD PROC, O,D.
(IN.)
- THICK, (IN,)
r
PEA I
CCM FROH R.C, PIMPS PM I MP 24 A
8.625 0>>500 CS SAHE AS P 16 (EXCEPT fOR DATES) ~
.12 75 1 2$
NA REJECTED IXI UT 7-26~75 ~ RQ'AIRED ANNI ACCEPTED OH UT 8 2$-75, P 27 aIARCINC PM 1 MP-100 10 75 1.12$
REPAIRED A ~
ACCEI"JIJJ 0:l UT S-24-75 ~
SAHPLING FM-1 MP-24 6,62S 0,432 CS
'Nh
6>>62S 0 500 REJECTED FOUR TJHES lkl UT, REPAIRS JLIDE A:ID ACCEPTED OH FIFTH UT
(
P-So BLOMDOMH FM I MP 100, I
6,625 0,500 CS-E REJECTED 0:I lit 7 29 7$, REPAIPZD h:s3 ACCEPTED ON UT 9 1$ 7S>>
P-SI COHTAIIZIEHT VENT IIEAMR PM-I DUTT E
MP-64 2>>375 0,218 IHCOHEL X
- ACCEPTED, I'2 IV LYPITAIJDEHT SIPIP SUCTION bUlT.
I MP 100.
34,00 34 00 A
1,500 1,500 CS Nh X
ACCEPTED S
ACCEPTED (SHOP MELD bY CR6l) ~
34,00 1,500
'CS NA X
ACCEPTED (FIELD LKLD bY CS61) ~
P-33 IV ODITAIIDIKNT SUMP SUCTION FM-I I
MP 100 I
34,00 1,500 ACS
- Nh Nh X
T REJECTED A:ID REPAIRED I'I"EI'S IX'I ACCEPTED ON TE:ATH LT, FINAL REPAIR INCLUDED USE OF PARTJAJ.
RAECKJ:A'0 RISC DUTY w
~ I 34.00 I 500 Nh ACCEPTED (SIIOP M~ bY CSLJ)
~
~
~
~
~
~
34,00 1.500 CS I
I E
Nh ACCEPTED (FIELD MELD bY Cbli) ~
~
EBASCO SERVICES IIICORPORATEO s tc.r 4 or CLl ter OR DA e roster ST LUClK UNIT HO 1 ~ DACRFIT t
t 'r HRC bULl.KTIN 8 08 ~ EXAHINA ON OF COMTAIHHENT PENETRATION WELDS ThslJr. 1 (COHTINUED) ort wo.
~r H
J DRIES cl4tctto or ocrr. ao. ~~
oart 5-8-80 otrt PEN ~
HO.
(IN.)
IHICK.
(IN.)
bASE HETAL
- SACK, RIND RI NDE UT PERPORHED HT RESULTS OF DJ'ILVAIION P 34h 6 34b CONTAIHHENT SPRAY HEADER Cs 12/
FW 1 WP 60 10,75 0,250 INCONEL
- ACCFFfED, CS-IS/
FW I WP SO 12,75 0.250 Ss RUECTKD A%I REPAIRED TL'ICE, ACCEPT OV THIRD RT 35A 6 3Sb COHTAINHEHT SPRAT HEADER Cs-13/
FW 2 WP 60 10.75 Or250 INCCNEL TO SS ACCEPTEil.
Cs 19/
FW 1 WP 50 12'5 0.250 Ss
- ACCEPTED, P 36 SI MOP lh2 FW 1 bUTT WP 100 16,00 I 593 REJECTED el UT 7-28-75, REPAIRED AVD ACCEPTED LV I.'I 8 25 75 P 37 SI LOOP Ihl, FW-1 WP 100, 16 00 Ir593
'S I
Nh NA REJECTED AVD REPAIRED V.: L'T INPr TL'KI FOURTH PEPAIR AND Uf ACCLPfKD, I
P 38 I
SI LOOP Ibl FWrl I'P 100 16,00 1.593
, CS NA
,X Nh
- ACCEPTED, s
o-39 SI LOOP lb2 WP-100 i 16.00 1,593 RUECTED OS UT 7 27 75, REPAIRED AQ ACCEPTED IP UI 8-24 75, P-40 SIIUTDOWH COOLIHC FW I 'UIT
~
I l
WP 100 I
24r00 Iron Cs I NA RUKCTKD AVD REPAIRED KIQIT TIHIS OS ll ACCKP1CD ON NlsfN Uf, FINIJ RK!'Alb ls CLUDEO USK OF PARTIAL AACRLVC F1SC, PWI III S,IrT, TEST PW 1'UTT WP-IOO I 8.625 Or500 CS I
i NA I
REPAIRED AVD ACCEPIKO OS Ur 8-21-75.
P 42 CONT*INN ENT SUHP PIIIP DISCNARCE FW 1 UP&4 3r50 I
I 0 300 INCCIIEL Hh I
I Nh REJECTED AHD REPAIRED iÃICE OV RT, AC CKPIKD CI 1HIRD Rf, LK' CL'I AVD frLDSK DUK TO Pll'1"G HISPLIC'a M;I RK.'KCTrb A"
'REPAIRED Il'aCS AND ACCKP1KU CV F1SAC E:
~
~
iiil E8ASCO SERVICES It(CORPORATED
~
4 l~lC'.'r cvas,v FLORIDA POWER 6 LICHT CtbtPANT gQ FLO 5872 ~ 196 OCr V. ~ O.
531
~ IIOJCCT SVOJCCT C
CEK VRC RULLETIH 80-08 EKAttTNATttbt OF CONTAINNENT PENETRATION WELDS TASLE 1 (CONTINUED)
CHCCIECO OT DJTC
- PEH, NO,
- PEH, TYPE SERVICE MELD HO.
ESASCO MELD PROC, OiD.
(IN,)
THICK,:
RASE (IN )
ttETAL bhCK.
RING RT NDE PERPORHED NT VT RESULTS OF EFJttlNATITEt IV REACTOR DRAIN PetP SUCTION PM~2 ltP-76 WP 24 8,625 8,625 0.500 Oi500 INCOHEL
'IO CS NA Nh RtJECTED tbt RT 10 9 72 ~ REPAIFLD ACCEPIED ON RT 10-13 72,
- ACCEPTED, PQ.5 bUTT MP 24, 8.625 0.500 CS Nh NA Nh ACCEPT ED, PM RCP RI.EEDOFF FM I MP 100 6.625 Oi432 CS ltA REJECTED tent UT 7 29 75 ~ REPAIRED A!iD ACCEPTLD Ott UT 8 24 75
'P 45 TNSTRVHFNT TUblttC PM~I WPi100 2i375 0,344 CS I
ltA REILCTEO TMlCE Ott LT FOR SVRt'ALE tOtOLIT REPAIRED AHD ACCEPTED tbt 'DllRD L
~
REFUELINO CAV, PURIP INLET FM 1 bUIT MP 68
~
5,563 0,625 INCONEL TO SS Nh
- ACCEPTED,
~
P 49 SLOMDOtN FW-1 SUIT WP-100 6,625 Oi500 CS Nh REJECTED et IJT 7i29 7S, REPAIRED h!TD ACCEl'TED Ott 8T 9-15-7Si I
P 51 FHSTRUHCttT IUbING WP 24 6i625 0,500 NA Nh ACCE~ ~
P 52 I
I P-53 IHSIRVttENT TUSINC INSTR tbt EttT Tvblltc Flt-1 FM 1 WP 100'P 100 I
12.00 di625 Oi500 0,500 Nh Nh.
NA X
ltA ACCEPTED RFJECTED TPt VT 7-25 75 ~ REPAIRED AQ ACCEPTED CN UT 8 24-7S.
EBASCO SERVICES IHCDRPCRATED ca,a ~ aar FLORIDA POHER & LIOlT COHPANT
~aaofgor ST LUCIE UNIT NO 1 ~ BACKFIT op/ ato PIO S822 196 oy M
J DRIES
~
aal okra 5-8-KO
- PEN, NO,
- PEN, TVPE SERVICE HELD NO.
EBASCO HELD PROC, O.D.
(>N.)
ggoggor
'NRC BULLETIN 80 08'XAHINATIONOP COITAIIblENT PENETRATION HELDS THICK.
(IN,)
PERFORHED caascaaco oy oar+
RESULTS OF maLWTION P S6 HVAC CV 12/
FM-3 HP-24
'2,375 0 218 CS a
I NA ACCEPTED+
P-57 HVAC CV-2/
FQ 1 HP-24 2,375 0,218
. HA a
NA ACCEPTED P-SB CV 10/
FQ 1 WP 24 2,375 0,218
'CS Nh NA HA
- ACCKPIED, P-64 SNVTDOHN COOLING FH-1' MP-100 a
a 24+00 I
I 1,00 CS '
a Nh, lEJECTED AND REPAIRED FOUR TIYES a; L ~
'aCCEPTED a FIYIll UI. FI!IAL PAMPA R INCLUDED USE OF PARTIAL BACKING P.I!'G
~
~
~
~
l a
a
~ I
~
~
I a
I
~
~
a a
a a
I I
a
.; I.
I a
I a
I I"
II.
a
~
a
~
~
I j
I I
I a
I a
a I
)
I I
I
~
a a
t j
~
a a
I a
I a
a a
~
~
1 l
tI J
~
Jk
(