L-80-184, Forwards Info Re TMI-related Requirements,In Response to NRC

From kanterella
(Redirected from L-80-184)
Jump to navigation Jump to search
Forwards Info Re TMI-related Requirements,In Response to NRC
ML17208A716
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 06/13/1980
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
L-80-184, NUDOCS 8006180471
Download: ML17208A716 (8)


Text

REGULATORY IN MATION DISTRIBUTION SYSTF (RIDS)

ACCESSION NBR:8006180471 DOC ~ DATE: 80/06/13 NOTARIZED; NO FACIL:50 335 St ~ Lucie Pl anti Unit li Florida Power 8 Light Co, AUTH,NAME AUTHOR AFFILIATION UHRIGiR ~ ED Florida Power 8 Light-Co, RECIP, NAME

'ECIPIENT AFFILIATION EISENHUTrD,G,.-

Division of Licensing DOCKET" 0 05000335

SUBJECT:

Forwards into r e TMI related requirementsr in response to NRC 800507 ltd DISTRIBUTION CODEi AOO2S COPIES RECEIVED:LTR

'NCL $

SIZEi TITLE: Resp to Lesson Learn Task Force Comb Eng 8 50'267 NO T E S + mwwweae~w~mw~~~mmw REC IP IENT ID CODE/NAME ACTION:

BCCLH+g, g.

08 INTERNAL: ANDERSONgC, 06 CORE PERF BR 18 EMERG PREP 19 IMBROPG ~

NRC PDR 02 S

BR 20 01 COPIES LTTR ENCL 7

7 1

1 1

1 1

1 1

1 1

1 1

1 1

RECIPIENT ID CODE/NAME AUX SYS BR, 21 CWALINA,G, 07 IEE 15 NELSONiG ~

05 OELD RAD ASSESS BR22 TELFORDrJ AT ~

COPIES LTTR ENCL 1

1, 1

2 2

2 2

1 0

1 2

2 EXTERNAL: ACRS NSIC 24 04 16 16 1

1 LPDR 1

1

""" ~8 f980 TOTAL NUMBER OF COPIES REQUIRED o LTTR 42 ENCL 41

I(

tr

~

JJ tt'I

)

f ll III I

JJ r

f3+

  • I Y

'IM

't I,

r t1 W

. BOX 629100, MIAMI,FL 331B2 gyi54i fthwAK FLORIDA POWER & LIGHTCOMPANY June 13, 1980 L-80-184 Office of Nuclear Reactor Regulation Attention:

Mr. Darrell G. Eisenhut, Director Division of Licensing U. S.

Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Eisenhut:

Re:

St. Lucie Unit 1

Docket No. 50-335 Additional TMI-Related Re uirements The attached information is submitted in response to your letter of May 7, 1980.

Very truly yours, Robert E. Uhrig Vice President Advanced Systems 8 Technology REU/MAS/JEM/pa Attachment','

cc:

J.

P. O'Reilly, Region II Harold F. Reis, Esquire

)ooazao /Pi'EOPLE...

SERVING PEOPLE

PSL 1 - ATTACHMENT Item 1.A.1.3 1.A.3.1 1.C.5 I I.K.3.1 Title Shift Manning Revise Scope 8 Criteria of Licensing Examinations Procedures for Feedback of Operating Experience to Plant Staff Installation and Testing of Automatic PORV Isolation system

~Res onse The requirements of this item are to be supplied by the NRC.

To

date, we have not yet received any correspondence on this item referenced in the May 7; 1980 letter.

FPL will respond to this item following receipt of the letter.

FPL has not yet completed the review and assessment.

of the requirements of the referenced March 28, 1980 letter.

We will respond to this item by Aug. 1, 1980.

FPL intends to comply with the requirements of this item.

However, the commitment to the implementation schedule must be qualified pending our ability to provide additional manpower required fo administer an appropriate operating experience feedback program.

The implementation of this action item has beea,delayed until after the studies specified in Item II.K.3.2 have been completed.

We plan to respond further at that time.

II'.3.2 PWR Vendor Report on PORV Failure Reduction FPL plans to support the vendor effort in this area and should submit the required report.

II.K.3.3 Reporting Safety 8 Relief Val ve Failures and Challenges FPL intends to comply with the requirements of item II.K.3.3.

I I.K.3. 5 I I.K.3. 17 Automatic Trip of Reactor Coolant Pumps During LOCA Report on Outage of ECCS Systems-Li censee Report and Proposed Technical Specification Changes CEN-115 documents the FPL and the CE position on the subject.

FPL sees no need for further evaluation of alternati.ves.

FPL intends to comply with the requirements of item II.K.3.17.

ll f '

6t V

PSL -

1 Item II.K.3. 25 I I.K.3.29 II.K.3.30 II.K.3.31 II.K.3.44 I I.D. 3.4 Title Effect of Loss of AC Power on Pump Seals Study to Demonstrate Performance of Isolation Condensers with Non-Condens ibles Revised Small-Break LOCA Methods to Show Compliance with 10CFR50, App.

K Plant specific calcula-tions to show compliance with 10CFR50.46 Anticipated transients with single failure to verify no fue 1 failur e Control Room habitability R~es onse This item is identified in NUREG-0660 as applicable only to G.E. plants.

This item is identified in NUREG-0660 as applicable only to G.E. plants.

FPL intends to comply with this item subject to vendor's ability to meet the schedule.

FPL intends to comply with the requirements of Item I I.K.3.31.

This item is identified in NUREG-0660 as applicable only to G.E.

plants.

FPL intends to comply with the requirements of Item I I I.D.3.4.

NOTE:

The following items are applicable to BMRs and are not addressed in this submittal.

II.K.3.13 through I I.K.3.16 II.K.3.18 through I I.K.3.22 I I.K.3. 24 II.K.3.27 II. K.3.28 II. K. 3.45 I I.K.3.46 I I.K.3. 57 1

I.

4