L-79-237, Forwards Response to IE Bulletin 79-17, Pipe Cracks in Stagnant Borated Water Sys at PWR Plants
| ML17338B146 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 08/27/1979 |
| From: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| L-79-237, NUDOCS 7910090109 | |
| Download: ML17338B146 (5) | |
Text
O. BOX 529100, MIAMI,F L 331 2 p FLORIDA POWER II LIGHTCOMPANY
'j /'.U; g~l C:. g August 2'P, 1979 L-79-237 i
~
~
~
c I
~
Mr. James P. O'Reilly, Director, Region II Office of Inspection and Enforcement U.
S. Nuclear Regulatory Commission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303
Dear Mr. O'Reilly:
Re:
RI I: JPO 50-250, 50-251 IE Bulletin 79-17 The attached information is submitted in response to Items 1 and 5 of the subject Bulletin.
Very truly yours, Robert E. Uhrig Vice President Advanced Systems 8 Technology REU/MAS/cph Attachment cc:
Director, Division of Operating Reactors,'ffice of Inspection and Enforcement (w/o drawings)
Robert Lowenstein,'squire (w/o drawings)
>>>oooo'EOPLE...
SERVING PEOPLE
ATTACHMENT Re:
RII:JPO 50-250, 50-251 IE Bulletin 79-17 Item 5 of the subject Bulletin requires a written report to the Director,'f the Region II Office of Inspection and Enforcement addressing the results of Florida Power
& Light Company's review of Item 1 of the Bulletin.
The following.'.':
information represents the result of our review of Item 1:
l.
Units 3 and 4
Two sets of color coded drawings are enclosed.
One set is for Unit 3 and one is for Unit 4.
The drawing numbers are the same for both units-The safety related Type 304 stainless steel piping systems that contain stagnant oxygenated borated water are color coded in pink.
~Drawin s
FPL FPL FPL FPL FPL FPL FPL 5610- T-E-4 510 5610- T-E-4510 5610- T-E-4515 5610-T-E-4503 5610-'T-E-4 518 5610-T-E-4505 5610- T-E-4 505 Sheet 1
Sheet 2
'Sheet 1
Sheet 2
(a),Unit 3 The extent of the examination of these systems is marked in green adjacent to the appropriate components.
Examination of Class 1 canponents and systems (and their supports) were conducted to the ASME Code Section XI (1970 Edition through the Winter 1970 Addenda) during the Fall 1974,
- 1975,
& 1976 and Winter 1977,
& 1979 refueling outages.
The examinations were performed by Westinghouse (W) in 1974 and by Southwest Research Institute (SwRI) thereafter-The nondestructive examination procedures (for Class 1 components and systems) and the results of examinations are on file at the plant site.
The procedures have been qualified by W and SwRI and contain acceptance criteria for each examination.
There were no reportable examination findings.
Unit 4 The extent of the examination of these systems is marked in green adjacent to the appropriate components.
Examination of Class 1 components and systems (and their supports) was conducted to the ASME Code Section XI (1970 Edition through the Winter 1970 Addenda) during the Spring 1975 and the Spring 1976 refueling outages.
Examination of Class 1 and Class 2 components and systems (and, their, supports) was conducted to the Technical Specifications and the:ASME Code Section XI (1974 Edition through the Summer 1975 Addenda); during the Summer 1978 and the Spring 1979 refueling outages.
m s
s The examinations were performed by Southwest Research Institut4,"
(SwRI).
The nondestructive examination procedures (for Class 1'nd Class 2 components and systems) and the results of examinations are on file at the plant site.
The procedures have been qualified by SwRI and contain acceptance criteria for each examination.
There were no reportable examination findings.
(b)
Units 3 and 4
Chemistry Parameters and Surveil lance Schedule RWST - Weekly pH Cl (ppm)
F (ppm)
Cond Qmhos)
B (ppm)
Accumulators - 2 times per month Cl- (ppm)
F (ppm)
B (ppm)
Boron Injection Tank - 2 times per month B (ppm)
(recirculated 3 times per day for 15 min.
15 min.,
and 45 min.; one recirc period per shift Boric Acid Storage Tanks - Weekly Cl" (ppm)
- 3 times per week B (ppm)
(also sampled after transfers from the Batching Tank)
(c)
Units 3 and 4
reservice examinations of Cl 1
to the ASNE Code Section XI (1970 Ed ass systems and components were conducted Addenda).
ition through the Winter 1970 Nondestructive examinations were erform W t ho Th a
e tanc c
rsa o
hese exam>nat>ons ar'.
II (d)
Units 3 and 4 Not applicable.