L-79-122, Forwards Steam Generator Insp Program. Insp Showed No New Phenomena.Verified General Pattern of Denting Is within Predictable Limits.Requests Permission to Return Facility to Power Operation
| ML17338A709 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 05/18/1979 |
| From: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| To: | Stello V Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML17338A710 | List: |
| References | |
| L-79-122, NUDOCS 7905240486 | |
| Download: ML17338A709 (6) | |
Text
ACCESSION NBR:
FAC IL:50-25f AUTH. MANE UHRIGi R. E.
REC lP. NANE STELLOi V.
RE TORY INFORNATION DISTR1B QN SYSTEN (RIDS) b 790524048b DQC. DATE: 7'7/05/i8 NOTARIZED:
NQ TURKEY POlNT PLANTi UNIT 4i FLORlDA POMER AND LlGHT C AUTHOR AFFlLIATIQN FLORIDA POMER 5 LIGHT CO.
REC IPlENT AFFILI*TlON DIVISlQN QF OPERATING REACTORS DOCKET 0500025f
SUBJECT:
FQRMARDS STEAN GENERATOR 1NSP PRQGRAN. INSP SHQMED NO NEM PHENONENA. VERIFIED GENERAL PATTERN QF DENTING IS MITHIN PREDICTABLE LINITS. REGUESTS PERNISSIQN TO RETURN FACILITY TQ PQMER OPERATION.
NOTES DISTRIBUTION CODE:
A00iS COPIES RECEIVED: LTR~ ENCL fW SIZE:
TITLE: GENERAL DISTRlBUTION FQR AFTER ISSUANCE QF OPERATING LIC b A~tsM c 5 c Z~C '6:
c
~ I 'I ~
REC IP IENT "ID CODE/MANE ACTION:
05 BC gp.g 9-INTERNAL EG F i2 ICE i5 CORE PERF BR f7 ENGR...BR.
f9 PLANT SYS BR 2i EFLTTRT SYS EXTERNAL'3 LPDR 23 ACRS CQP lES LTTR ENCL 7
7 i
f 2
2 f
f i
fff i
fb fb REC IP lENT ID CODE/MANE 02,NRC PDP f4 TA/EDQ ib AD SYS/PROJ f8 REAG,,SFTY BR 20'EEB 22 BRINKNAN 04 NSIC CQP IES LTTR ENCL f
f QN sg gag
~ <ia ~
TOTAL NUNBER QF COPIES REQUIRED:
LTTR 38 ENCL 38
I II E; ~
I I
'I I'
I'
'j n
I 4
4 Ef
'Qt I
EJ f
I
'll g fj E,
P I
I I
~ ~ Ifjf l
4
~
4 I
Il Il I
+ E 04
=a.
E 4:
g Igf I,
g"
~ I
~ 4 f
x I
E y
4 f E 1
4 4,4
P.
0.
Box 529100 Miami, Florida 33152 O'6 FLORIDA POWER 8 LIGHTCOMPANY May 18, 1979 L-79-122 Office of Nuclear Reactor Regulation Attention:
Mr. Victor Stello, Director Division of Operating Reactors U. S. Nuclear Regulatory Commission Washington, D.
C.
20555
Dear Mr. Stello:
Re:
Turkey Point Unit 4 Docket No.
50-251 Steam Generator Ins ections The results of the Turkey Point Unit 4 steam generator inspections conducted during the current outage are attached.
The inspections which were performed in accordance with Turkey Point Unit 4 operating license DPR-41 showed no new phenomena and verified that the general pattern of denting in Unit 4 is within predictable limits and consis-tent with previous inspections of the Turkey Point Units.
The general criteria applied for steam generator inspections and pre-ventive plugging are the same as previously applied to Turkey Point Units 3 and 4, with an additional plugging criterion included to provide more conservatism.
Additional tubes to provide in excess of 10 months of operation have been plugged.
This approach provides reasonable assurance of steam generator tube integrity such that safe operation of the unit during normal full power operation and during hypothetical accident conditions is assured for an operating period in excess of 10 effective full power months.
Therefore, the implementa-tion of this program with the resulting preventive plugging, enables continued safe full power operation of Turkey Point Unit 4 for a period in excess of 10 months.
Total steam generator tube plugging at the conclusion of the current outage will be approximately 20.6%.
This is conservatively bounded by the 25% tube plugging ECCS analysis which has been previously submitted and the 22% tube plugging ECCS analysis which we plan to submit shortly.
The results of this inspection and the preventative tube plugging program have been reviewed by the Turkey Point Plant Nuclear Safety Committee and the Florida Power 8 Light Company Nuclear Review Hoard.
They have concluded that based on the inspection results, the implemented plugging
- pattern, and previously submitted analysis, that the return of Turkey Point Unit 4 to full power operation for at least 10 effective months does not involve an unreviewed safety question.
PEOPLE... SERVING PEOPLE
N
Mr. Victor Stello, Director Division of Operating Reactors U. S. Nuclear Regulatory Commission Page 2
In accordance with condition Dl of operating license DPR-41, Florida Power 8 Light Company requests permission to return Unit 4 to power operation.
Based on our current schedule, we could be ready to resume power operation by June 1, 1979.
We will keep you advised of any significant schedule changes.
Very truly yours, Robert ED Uhrig Vice President REU:GDW:cf Attachment cc: