Category:Letter type:L
MONTHYEARL-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-122, Core Operating Limits Report2024-08-12012 August 2024 Core Operating Limits Report L-2024-106, Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-022024-08-12012 August 2024 Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-02 L-2024-089, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2024-07-25025 July 2024 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-112, Condition Prohibited by Technical Specifications2024-07-10010 July 2024 Condition Prohibited by Technical Specifications L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-100, Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project2024-06-19019 June 2024 Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project L-2024-076, Reply to Notice of Violation; NOV 05000250, 05000251/2024010-052024-05-29029 May 2024 Reply to Notice of Violation; NOV 05000250, 05000251/2024010-05 L-2024-082, 2023 Annual Radiological Environmental Operating Report2024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report L-2024-060, 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report2024-05-0909 May 2024 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report L-2024-073, Cycle 34 Core Operating Limits Report2024-05-0101 May 2024 Cycle 34 Core Operating Limits Report L-2024-072, Cycle 33 Core Operating Limits Report2024-05-0101 May 2024 Cycle 33 Core Operating Limits Report L-2024-048, Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision2024-04-30030 April 2024 Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision L-2024-069, Radiological Emergency Plan Revision 762024-04-22022 April 2024 Radiological Emergency Plan Revision 76 L-2024-066, Sixth 10-Year Inservice Testing Interval Relief Request No. PR-022024-04-17017 April 2024 Sixth 10-Year Inservice Testing Interval Relief Request No. PR-02 L-2024-057, 0 for Turkey Point, Unit 3 - Condition Prohibited by Technical Specifications2024-04-11011 April 2024 0 for Turkey Point, Unit 3 - Condition Prohibited by Technical Specifications L-2024-040, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2024-03-28028 March 2024 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections L-2024-047, Proposed Use of a Subsequent ASME Code Edition and Addenda2024-03-28028 March 2024 Proposed Use of a Subsequent ASME Code Edition and Addenda L-2024-013, Submittal of Periodic Reports2024-03-28028 March 2024 Submittal of Periodic Reports L-2024-044, Revised Steam Generator Tube Inspection Reports2024-03-19019 March 2024 Revised Steam Generator Tube Inspection Reports L-2024-011, and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2024-03-13013 March 2024 and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2024-014, 2023 Annual Radioactive Effluent Release Report2024-02-29029 February 2024 2023 Annual Radioactive Effluent Release Report L-2024-025, Notification of Improved Standard Technical Specifications (ITS) Implementation2024-02-22022 February 2024 Notification of Improved Standard Technical Specifications (ITS) Implementation L-2024-008, Supplement to License Amendment Request 278. Incorporate Advanced Fuel Products. Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles2024-02-0909 February 2024 Supplement to License Amendment Request 278. Incorporate Advanced Fuel Products. Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2024-007, Inservice Inspection Program Owners Activity Report (OAR-1)2024-01-18018 January 2024 Inservice Inspection Program Owners Activity Report (OAR-1) L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-172, Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-146, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-078, License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles2023-11-15015 November 2023 License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles L-2023-077, License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis2023-10-11011 October 2023 License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis L-2023-110, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-08-25025 August 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2023-115, Inservice Inspection Program Owner'S Activity Report (OAR-1)2023-08-21021 August 2023 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2023-094, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-07-27027 July 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) L-2023-086, Request Temporary Suspension of Turkey Point License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation.2023-06-28028 June 2023 Request Temporary Suspension of Turkey Point License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation. L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update L-2023-069, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-05-31031 May 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2023-072, Preparation and Scheduling of Operator Licensing Examinations2023-05-22022 May 2023 Preparation and Scheduling of Operator Licensing Examinations L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal L-2023-061, 2022 Annual Radiological Environmental Operating Report2023-05-12012 May 2023 2022 Annual Radiological Environmental Operating Report L-2023-062, Cycle 33 Core Operating Limits Report2023-04-27027 April 2023 Cycle 33 Core Operating Limits Report L-2023-060, Radiological Emergency Plan, Revision 752023-04-26026 April 2023 Radiological Emergency Plan, Revision 75 L-2023-054, Submittal of Periodic Reports2023-04-12012 April 2023 Submittal of Periodic Reports 2024-09-25
[Table view] Category:Technical Specifications
MONTHYEARML24135A0932024-05-0909 May 2024 Periodic Update to the Updated Final Safety Analysis Report, Chapter 15, Technical Specifications ML23234A1922023-09-27027 September 2023 Issuance of Amendment Nos. 297 and 290 Regarding Conversion to Improved Standard Technical Specifications ML23151A4462023-05-24024 May 2023 Enclosure 2, Volume 8: Turkey Point Nuclear Plant, Units 3 and 4, Improved Technical Specifications Conversion, Section 3.3, Instrumentation, Revision 3 ML23151A4442023-05-24024 May 2023 Enclosure 2, Volume 6: Turkey Point Nuclear Plant, Units 3 and 4, Improved Technical Specifications Conversion, Section 3.1, Reactivity Control Systems, Revision 2 ML23151A4432023-05-24024 May 2023 Enclosure 2, Volume 5: Turkey Point Nuclear Plant, Units 3 and 4, Improved Technical Specifications Conversion, Section 3, LCO and SR Applicability, Revision 2 ML23151A4412023-05-24024 May 2023 Enclosure 2, Volume 3, Turkey Point Nuclear Plant, Units 3 and 4, Improved Technical Specifications Conversion, Revision 2, Chapter 1 - Use and Application, Revision 2 ML23151A4542023-05-24024 May 2023 Enclosure 2, Volume 16: Turkey Point Nuclear Plant, Units 3 and 4, Improved Technical Specifications Conversion, Chapter 5, Administrative Controls, Revision 2 ML23151A4532023-05-24024 May 2023 Enclosure 2, Volume 15: Turkey Point Nuclear Plant, Units 3 and 4, Improved Technical Specifications Conversion, Chapter 4, Design Features, Revision 1 ML23151A4422023-05-24024 May 2023 Enclosure 2, Volume 4: Turkey Point Nuclear Plant, Units 3 and 4, Improved Technical Specifications Conversion, Chapter 2, Safety Limits, Revision 1 L-2023-063, Enclosure 2, Volume 1: Turkey Point Nuclear Plant, Units 3 and 4, Improved Technical Specifications Conversion, Application of Selection Criteria to Technical Specifications, Revision 2, Volume 12023-05-24024 May 2023 Enclosure 2, Volume 1: Turkey Point Nuclear Plant, Units 3 and 4, Improved Technical Specifications Conversion, Application of Selection Criteria to Technical Specifications, Revision 2, Volume 1 ML23151A4402023-05-24024 May 2023 Enclosure 2, Volume 2: Turkey Point Nuclear Plant, Units 3 and 4, Improved Technical Specifications Conversion, Generic Determination of No Significant Hazards Consideration and Environmental Assessment, Revision 2, Volume 2 ML23151A4382023-05-24024 May 2023 Enclosure 1: Contents of the Turkey Point Nuclear Plant, Units 3 and 4, Improved Technical Specifications Submittal ML23151A4372023-05-24024 May 2023 Attachment 3: Turkey Point Nuclear Plant, Units 3 and 4, Improved Technical Specifications Conversion License Amendment Request NRC Request for Additional Information and FPL Responses Database ML23151A4452023-05-24024 May 2023 Enclosure 2, Volume 7:Turkey Point Nuclear Plant, Units 3 and 4, Improved Technical Specifications Conversion, Section 3.2, Power Distribution Limits, Revision 2 ML23151A4472023-05-24024 May 2023 Enclosure 2, Volume 9: Turkey Point Nuclear Plant, Units 3 and 4, Improved Technical Specifications Conversion, Section 3.4, Reactor Coolant System, Revision 3 ML23151A4362023-05-24024 May 2023 License Amendment Request Revision 3 for the Technical Specifications Conversion to NUREG - 1431 Revision 5 ML23151A4482023-05-24024 May 2023 Enclosure 2, Volume 10: Turkey Point Nuclear Plant, Units 3 and 4, Improved Technical Specifications Conversion, Section 3.5, Emergency Core Cooling Systems, Revision 2 ML23151A4512023-05-24024 May 2023 Enclosure 2, Volume 13: Turkey Point Nuclear Plant, Units 3 and 4, Improved Technical Specifications Conversion, Section 3.8, Electrical Power Systems, Revision 3 ML23151A4492023-05-24024 May 2023 Enclosure 2, Volume 11:Turkey Point Nuclear Plant, Units 3 and 4, Improved Technical Specifications Conversion, Section 3.6, Containment Systems, Revision 3 ML23151A4522023-05-24024 May 2023 Enclosure 2, Volume 14: Turkey Point Nuclear Plant, Units 3 and 4, Improved Technical Specifications Conversion, Section 3.9, Refueling Operations, Revision 2 ML23151A4502023-05-24024 May 2023 Enclosure 2, Volume 12: Turkey Point Nuclear Plant, Units 3 and 4, Improved Technical Specifications Conversion, Section 3.7, Plant Systems, Revision 2 ML23095A0222023-04-0404 April 2023 Enclosure 2 - ITS Chapter 5.0 Administrative Controls, Revision 2, Volume 16 L-2023-043, Enclosure 2 - Application of Selection Criteria to the Turkey Point Nuclear Generating Station Units 3 and 4 Technical Specifications, Revision 2, Volume 12023-04-0404 April 2023 Enclosure 2 - Application of Selection Criteria to the Turkey Point Nuclear Generating Station Units 3 and 4 Technical Specifications, Revision 2, Volume 1 ML23095A0122023-04-0404 April 2023 Enclosure 2 - ITS Chapter 1.0 Use and Application, Revision 2, Volume 3 ML23095A0092023-04-0404 April 2023 Enclosure 1 - Contents of the Turkey Point Nuclear Plant, Units 3 and 4 Improved Technical Specifications (ITS) Submittal ML23095A0132023-04-0404 April 2023 Enclosure 2 - ITS Section 3.0 LCO and SR Applicability, Revision 2, Volume 5 ML23095A0162023-04-0404 April 2023 Enclosure 2 - ITS Section 3.4 Reactor Coolant System (Rcs), Revision 2, Volume 9 ML23095A0142023-04-0404 April 2023 Enclosure 2 - ITS Section 3.1 Reactivity Control Systems, Revision 2, Volume 6 ML23095A0202023-04-0404 April 2023 Enclosure 2 - ITS Section 3.8 Electrical Power Systems, Revision 2, Volume 13 ML23095A0192023-04-0404 April 2023 Enclosure 2 - ITS Section 3.7 Plant Systems, Revision 2, Volume 12 ML23095A0172023-04-0404 April 2023 Enclosure 2 - ITS Section 3.5 Emergency Core Cooling Systems (Eccs), Revision 2, Volume 10 ML23095A0152023-04-0404 April 2023 Enclosure 2 - ITS Section 3.2 Power Distribution Limits, Revision 2, Volume 7 ML23095A0182023-04-0404 April 2023 Enclosure 2 - ITS Section 3.6 Containment Systems, Revision 2, Volume 11 ML23095A0212023-04-0404 April 2023 Enclosure 2 - ITS Section 3.9 Refueling Operations, Revision 2, Volume 14 ML22089A2102022-03-30030 March 2022 Enclosure 2 - Volume 12, Turkey Point Nuclear Generating Station, Units 3 and 4, Improved Technical Specifications Conversion, ITS Section 3.7, Plant Systems Revision 1 ML22089A2032022-03-30030 March 2022 Enclosure 2 - Volume 5, Turkey Point Nuclear Generating Station, Units 3 and 4, Improved Technical Specifications Conversion, ITS Section 3.0 LCO and SR Applicability, Revision 1 ML22089A2072022-03-30030 March 2022 Enclosure 2 - Volume 9, Turkey Point Nuclear Generating Station, Units 3 and 4, Improved Technical Specifications Conversion, ITS Section 3.4, Reactor Coolant System (Rcs), Revision 1 ML22089A2002022-03-30030 March 2022 Enclosure 2 - Volume 2, Turkey Point Nuclear Plant, Units 3 and 4, Improved Technical Specifications Conversion Generic Determination of No Significant Hazards Consideration and Environmental Assessment, Revision 1 ML22089A2012022-03-30030 March 2022 Enclosure 2 - Volume 3, Turkey Point Nuclear Generating Station, Units 3 and 4, Improved Technical Specifications Conversion, ITS Chapter 1.0 Use and Application, Revision 1 ML22089A2022022-03-30030 March 2022 Enclosure 2 - Volume 4, Turkey Point Nuclear Generating Station, Units 3 and 4, Improved Technical Specifications Conversion ITS Chapter 2.0 Safety Limits (Sls), Revision 1 ML22089A1972022-03-30030 March 2022 Attachment 1 - Contents of the Turkey Point Nuclear Plant, Units 3 and 4, Improved Technical Specifications (ITS) Revision 1 Submittal ML22089A1982022-03-30030 March 2022 Enclosure 1 - Contents of the Turkey Point Nuclear Plant, Units 3 and 4, Improved Technical Specifications (ITS) Submittal L-2022-040, Enclosure 2 - Turkey Point Nuclear Plant, Units 3 and 4, Improved Technical Specifications (ITS) Revision 1 Submittal, Volumes 1 Through 162022-03-30030 March 2022 Enclosure 2 - Turkey Point Nuclear Plant, Units 3 and 4, Improved Technical Specifications (ITS) Revision 1 Submittal, Volumes 1 Through 16 ML22089A2042022-03-30030 March 2022 Enclosure 2 - Volume 6, Turkey Point Nuclear Generating Station, Units 3 and 4, Improved Technical Specifications Conversion, ITS Section 3.1, Reactivity Control Systems, Revision 1 ML22089A2052022-03-30030 March 2022 Enclosure 2 - Volume 7, Turkey Point Nuclear Generating Station, Units 3 and 4, Improved Technical Specifications Conversion, ITS Section 3.2, Power Distribution Limits, Revision 1 ML22089A2062022-03-30030 March 2022 Enclosure 2 - Volume 8, Turkey Point Nuclear Generating Station, Units 3 and 4, Improved Technical Specifications Conversion, ITS Section 3.3, Instrumentation, Revision 1 ML22089A2082022-03-30030 March 2022 Enclosure 2 - Volume 10, Turkey Point Nuclear Generating Station, Units 3 and 4, Improved Technical Specifications Conversion, ITS Section 3.5, Emergency Core Cooling Systems (Eccs), Revision 1 ML22089A2092022-03-30030 March 2022 Enclosure 2 - Volume 11, Turkey Point Nuclear Generating Station, Units 3 and 4, Improved Technical Specifications Conversion, ITS Section 3.6 Containment Systems, Revision 1 ML22089A2112022-03-30030 March 2022 Enclosure 2 - Volume 13, Turkey Point Nuclear Generating Station, Units 3 and 4, Improved Technical Specifications Conversion, ITS Section 3.8, Electrical Power Systems, Revision 1 ML22089A2122022-03-30030 March 2022 Enclosure 2 - Volume 14, Turkey Point Nuclear Generating Station, Units 3 and 4, Improved Technical Specifications Conversion, ITS Section 3.9, Refueling Operations, Revision 1 2024-05-09
[Table view] |