0December 15, 2015 L-2015-303 FPL/
10 CFR 50.90 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001
Subject:
St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 TS Correction for License Amendment Request to Standardize the Required Actions for Inoperability of Auxiliary Feedwater Pumps
References:
- 1.
FPL Letter L-2015-079 dated July 15, 2015, "License Amendment Request to Standardize the Required Actions for Inoperability of Auxiliary Feedwater Pumps,"
ADAMS Accession No. ML15198A028
- 2.
NRC letter November 23, 2015, "Request for Additional Information RE: License Amendment Request for Changes to the Required Actions for Inoperability of Auxiliary Feedwater Pumps (CAC Nos. MF6491 and MF6492)," ADAMS Accession No. ML15308A615 In Reference 1 Florida Power & Light (FPL) submitted a Technical Specification (TS) amendment request that would standardize the TS LCO actions for inoperable auxiliary feedwater pumps.
Reference 2 identified an administrative oversight within the proposed TS surveillance requirements. The corrected TS markups and TSs supersede those in References 1 above and are provided in the attachment.
The no significant hazards consideration determination within Reference 1 bounds the scope of these changes. If you should have any questions, please contact Mr. Ken Frehafer at (772) 467-7748.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on December 1 5f
, 2015.
Sincerely, Christopher R. Costanzo Site Vice President St. Lucie Plant CRC/KWF Attachment cc:
NRC Region II Administrator St. Lucie Plant NRC Senior Resident Inspector l
X Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957
L-2015-303 Attachment Page 1 of 6 PLANT SYSTEMS AUXILIARY FEEDWATER SYSTEM LIMITING CONDITION FOR OPERATION 3.7.1.2 At least three independent steam generator auxiliary feedwater pumps and associated flow paths shall be OPERABLE with:
- a.
Two motor driven feedwater pumps, and
- b.
One feedwater pump capable of being powered from an OPERABLE steam supply system.
APPLICABILITY: MODES 1, 2 and 3.
ithe pump ACTION:
- a.
With one auxiliary feedwater pump inoperable, restore a-es-he beiP, pewefed -by-an-PR-BEztz splyzstem-to OPERABLE status
[*
within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
-b.
LO 3.0.4.b is not applicable.
"--Insert II SURVEILLANCE REQUIREMENTS 4.7.1.2 Each auxiliary feedwater pump shall be demonstrated OPERABLE:
- a.
In accordance with the Surveillance Frequency Control Program by:
A4/
ST. LUCIE - UNIT 13/7-3/4 7-4 Amendment No. 25. 99,4998,229, 23-
L-2015-303 Attachment Page 2 of 6 INSERT 1
- b. With two auxiliary feedwater pumps inoperable, immediately enter LCO 3.0.3.
~NOTE LCO 3.0.3 and all other LCO Actions requiring MODE changes are suspended until one AFW pump is restored to OPERABLE status.
- c. With three auxiliary feedwater pumps inoperable, immediately initiate corrective action to restore at least one auxiliary feedwater pump to OPERABLE status.
L-2015-303 Attachment.
Page 3 of 6 PLANT SYSTEMS AUXILIARY FEEDWATER SYSTEM LIMITING CONDITION FOR OPERATION 3.7.1.2 At least three independent steam generator auxiliary feedwater pumps and associated flow paths shall be OPERABLE with:
- a.
Two feedwater pumps, each capable of being powered from separate OPERABLE emergency busses, and
- b.
One feedwater pump capable of being powered from an OPERABLE steam supply system.
APPLICABILITY: MODES 1, 2, and 3.
ACTION:
- a.
With one auxiliary feedwater pump inoperable, restore the required auxiliary feedwater pumps to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
- b.
With two auxiliary feedwater pumps inoperable be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
c* With three auxiliary feedwater pumps inoperable, immediately initiate
\\corrective action to restore at least one auxiliary feedwater pump to OPERABLE status.
- d.
- CO 3.0.4.b is not applicable.
- a.
In ac rdance with the Surveillance Frequency Control Program by:
m-in t e flow path that is not locked, sealed, or otherwise secured in p ston,.is in its correct position.
ST. LUCIE - UNIT 2 3/4 7-4 Amendment No. 25,446, 4-740, 47~--
L-2015-303 Attachment Page 4 of 6 INSERT 2 NOTE LCO 3,0.3 and all other [CO Actions requiring MODE changes are suspended until one AFW pump is restored to OPERABLE status.
L-2015-303 Attachment Page 5 of 6 PLANT SYSTEMS AUXILIARY FEEDWATER SYSTEM LIMITING CONDITION FOR OPERATION 3.7.1.2 At least three independent steam generator auxiliary feedwater pumps and associated flow paths shall be OPERABLE with:
- a.
Two motor driven feedwater pumps, and
- b.
One feedwater pump capable of being powered from an OPERABLE steam supply system.
APPLICABILITY: MODES 1, 2 and 3.
ACTION:
- a.
With one auxiliary feedwater pump inoperable, restore the auxiliary feedwater pump to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
- b.
With two auxiliary feedwater pumps inoperable, be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
NOTE LCO 3.0.3 and all other LCO Actions requiring MODE changes are suspended until Sone AFW pump is restored to OPERABLE status.
- c.
With three auxiliary feedwater pumps inoperable, immediately initiate corrective action to restore at least one auxiliary feedwater pump to OPERABLE status.
- d.
LCO 3.0.4.b is not applicable.
SURVEILLANCE REOUIREMENTS 4.7.1.2 Each auxiliary feedwater pump shall be demonstrated OPERABLE:
- a.
In accordance with the Surveillance Frequency Control Program by:
ST. LUCIE - UNIT 1 3!4 7-4 Amendment No. 35, 90, 4-9-9, 2-29,
L-201 5-3 03 Attachment Page 6 of 6 PLANT SYSTEMS AUXILIARY FEEDWATER SYSTEM LIMITING CONDITION FOR OPERATION 3.7.1.2 At least three independent steam generator auxiliary feedwater pumps and associated flow paths shall be OPERABLE with:
- a.
Two feedwater pumps, each capable of being powered from separate OPERABLE emergency busses, and
- b.
One feedwater pump capable of being powered from an OPERABLE steam supply system.
APPLICABILITY: MODES 1, 2, and 3.
ACTION:
- a.
With one auxiliary feedwater pump inoperable, restore the auxiliary feedwater pump to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
- b.
With two auxiliary feedwater pumps inoperable, be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
~NOTE LCO 3.0.3 and all other LCO Actions requiring MODE changes are suspended until one AFW pump is restored to OPERABLE status.
- c.
With three auxiliary feedwater pumps inoperable, immediately initiate corrective action to restore at least one auxiliary feedwater pump to OPERABLE status.
- d.
LCO 3.0.4.b is not applicable.
SURVEILLANCE REOUIREMENTS 4.7.1.2 Each auxiliary feedwater pump shall be demonstrated OPERABLE:
- a.
In accordance with the Surveillance Frequency Control Program by:
- t.
Verifying that each valve (manual, power-operated, or automatic) in the flow path that is not locked, sealed, or otherwise secured in position, is in its correct position.
ST. LUCIE - UNIT 2 3/4 7-4 ST.LUCE
-UNI 2 14 -4Amendment No. 2-5, 44, -t-7-,
0December 15, 2015 L-2015-303 FPL/
10 CFR 50.90 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001
Subject:
St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 TS Correction for License Amendment Request to Standardize the Required Actions for Inoperability of Auxiliary Feedwater Pumps
References:
- 1.
FPL Letter L-2015-079 dated July 15, 2015, "License Amendment Request to Standardize the Required Actions for Inoperability of Auxiliary Feedwater Pumps,"
ADAMS Accession No. ML15198A028
- 2.
NRC letter November 23, 2015, "Request for Additional Information RE: License Amendment Request for Changes to the Required Actions for Inoperability of Auxiliary Feedwater Pumps (CAC Nos. MF6491 and MF6492)," ADAMS Accession No. ML15308A615 In Reference 1 Florida Power & Light (FPL) submitted a Technical Specification (TS) amendment request that would standardize the TS LCO actions for inoperable auxiliary feedwater pumps.
Reference 2 identified an administrative oversight within the proposed TS surveillance requirements. The corrected TS markups and TSs supersede those in References 1 above and are provided in the attachment.
The no significant hazards consideration determination within Reference 1 bounds the scope of these changes. If you should have any questions, please contact Mr. Ken Frehafer at (772) 467-7748.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on December 1 5f
, 2015.
Sincerely, Christopher R. Costanzo Site Vice President St. Lucie Plant CRC/KWF Attachment cc:
NRC Region II Administrator St. Lucie Plant NRC Senior Resident Inspector l
X Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957
L-2015-303 Attachment Page 1 of 6 PLANT SYSTEMS AUXILIARY FEEDWATER SYSTEM LIMITING CONDITION FOR OPERATION 3.7.1.2 At least three independent steam generator auxiliary feedwater pumps and associated flow paths shall be OPERABLE with:
- a.
Two motor driven feedwater pumps, and
- b.
One feedwater pump capable of being powered from an OPERABLE steam supply system.
APPLICABILITY: MODES 1, 2 and 3.
ithe pump ACTION:
- a.
With one auxiliary feedwater pump inoperable, restore a-es-he beiP, pewefed -by-an-PR-BEztz splyzstem-to OPERABLE status
[*
within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
-b.
LO 3.0.4.b is not applicable.
"--Insert II SURVEILLANCE REQUIREMENTS 4.7.1.2 Each auxiliary feedwater pump shall be demonstrated OPERABLE:
- a.
In accordance with the Surveillance Frequency Control Program by:
A4/
ST. LUCIE - UNIT 13/7-3/4 7-4 Amendment No. 25. 99,4998,229, 23-
L-2015-303 Attachment Page 2 of 6 INSERT 1
- b. With two auxiliary feedwater pumps inoperable, immediately enter LCO 3.0.3.
~NOTE LCO 3.0.3 and all other LCO Actions requiring MODE changes are suspended until one AFW pump is restored to OPERABLE status.
- c. With three auxiliary feedwater pumps inoperable, immediately initiate corrective action to restore at least one auxiliary feedwater pump to OPERABLE status.
L-2015-303 Attachment.
Page 3 of 6 PLANT SYSTEMS AUXILIARY FEEDWATER SYSTEM LIMITING CONDITION FOR OPERATION 3.7.1.2 At least three independent steam generator auxiliary feedwater pumps and associated flow paths shall be OPERABLE with:
- a.
Two feedwater pumps, each capable of being powered from separate OPERABLE emergency busses, and
- b.
One feedwater pump capable of being powered from an OPERABLE steam supply system.
APPLICABILITY: MODES 1, 2, and 3.
ACTION:
- a.
With one auxiliary feedwater pump inoperable, restore the required auxiliary feedwater pumps to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
- b.
With two auxiliary feedwater pumps inoperable be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
c* With three auxiliary feedwater pumps inoperable, immediately initiate
\\corrective action to restore at least one auxiliary feedwater pump to OPERABLE status.
- d.
- CO 3.0.4.b is not applicable.
- a.
In ac rdance with the Surveillance Frequency Control Program by:
m-in t e flow path that is not locked, sealed, or otherwise secured in p ston,.is in its correct position.
ST. LUCIE - UNIT 2 3/4 7-4 Amendment No. 25,446, 4-740, 47~--
L-2015-303 Attachment Page 4 of 6 INSERT 2 NOTE LCO 3,0.3 and all other [CO Actions requiring MODE changes are suspended until one AFW pump is restored to OPERABLE status.
L-2015-303 Attachment Page 5 of 6 PLANT SYSTEMS AUXILIARY FEEDWATER SYSTEM LIMITING CONDITION FOR OPERATION 3.7.1.2 At least three independent steam generator auxiliary feedwater pumps and associated flow paths shall be OPERABLE with:
- a.
Two motor driven feedwater pumps, and
- b.
One feedwater pump capable of being powered from an OPERABLE steam supply system.
APPLICABILITY: MODES 1, 2 and 3.
ACTION:
- a.
With one auxiliary feedwater pump inoperable, restore the auxiliary feedwater pump to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
- b.
With two auxiliary feedwater pumps inoperable, be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
NOTE LCO 3.0.3 and all other LCO Actions requiring MODE changes are suspended until Sone AFW pump is restored to OPERABLE status.
- c.
With three auxiliary feedwater pumps inoperable, immediately initiate corrective action to restore at least one auxiliary feedwater pump to OPERABLE status.
- d.
LCO 3.0.4.b is not applicable.
SURVEILLANCE REOUIREMENTS 4.7.1.2 Each auxiliary feedwater pump shall be demonstrated OPERABLE:
- a.
In accordance with the Surveillance Frequency Control Program by:
ST. LUCIE - UNIT 1 3!4 7-4 Amendment No. 35, 90, 4-9-9, 2-29,
L-201 5-3 03 Attachment Page 6 of 6 PLANT SYSTEMS AUXILIARY FEEDWATER SYSTEM LIMITING CONDITION FOR OPERATION 3.7.1.2 At least three independent steam generator auxiliary feedwater pumps and associated flow paths shall be OPERABLE with:
- a.
Two feedwater pumps, each capable of being powered from separate OPERABLE emergency busses, and
- b.
One feedwater pump capable of being powered from an OPERABLE steam supply system.
APPLICABILITY: MODES 1, 2, and 3.
ACTION:
- a.
With one auxiliary feedwater pump inoperable, restore the auxiliary feedwater pump to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
- b.
With two auxiliary feedwater pumps inoperable, be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
~NOTE LCO 3.0.3 and all other LCO Actions requiring MODE changes are suspended until one AFW pump is restored to OPERABLE status.
- c.
With three auxiliary feedwater pumps inoperable, immediately initiate corrective action to restore at least one auxiliary feedwater pump to OPERABLE status.
- d.
LCO 3.0.4.b is not applicable.
SURVEILLANCE REOUIREMENTS 4.7.1.2 Each auxiliary feedwater pump shall be demonstrated OPERABLE:
- a.
In accordance with the Surveillance Frequency Control Program by:
- t.
Verifying that each valve (manual, power-operated, or automatic) in the flow path that is not locked, sealed, or otherwise secured in position, is in its correct position.
ST. LUCIE - UNIT 2 3/4 7-4 ST.LUCE
-UNI 2 14 -4Amendment No. 2-5, 44, -t-7-,