L-2014-156, 5 to the Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan for St. Lucie Units 1 and 2

From kanterella
(Redirected from L-2014-156)
Jump to navigation Jump to search
5 to the Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan for St. Lucie Units 1 and 2
ML14181B084
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 06/23/2014
From: Jensen J
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2014-156
Download: ML14181B084 (2)


Text

SAFEGUARDS INFORMATION June 23, 2014 F:PL. L-2014-156 10 CFR 50.4(b)(4) 10 CFR 50.54(p)(2) 10 CFR 73.22 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-001 Re: Florida Power and Light Company St. Lucie Units 1 and 2, Docket Nos. 50-335, 50-389 Revision 15 to the Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan for St. Lucie Units I and 2 In accordance with 10 CFR 50.4(b)(4), "Security plan and related submissions," and 10 CFR 50.54(p)(2), "Conditions of licenses," Florida Power and Light Company (FPL), the licensee for St. Lucie Nuclear Plant, Units I and 2, hereby submits Revision 15 to the FPL St. Lucie Units 1 and 2 Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan and ISFSI Security Plan.

Revision 15 to the FPL St. Lucie Units 1 and 2 Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and ISFSI Security Plan incorporates descriptions of recently added barriers and intrusion detection features, and clarifying language in response to RAI from previously submitted revision 14.

One (1) CD-ROM containing Safeguards Information is included in this submission.

The CD-ROM labeled "FPL St. Lucie Units 1 and 2 PSP, Revision 15, Safeguards Information" contains the following three files:

001 FPL St Lucie Units I and 2 PSP Rev 15 (SGI).pdf. SGI 002 Change Synopsis FPL St Lucie Units 1 and 2 PSP Rev 15.pdf. SGI 003 CD Index.pdf (includes individual file size). SGI - Decontrolled upon separation On each CD-ROM, file 001 and file 002 contain Safeguard Information that must be protected from public disclosure as required by 10 CFR 73.22, "Protection of Safeguards Information:

Specific Requirements."

Should you have any question regarded this submittal, please contact Charles Workman (charles.workman@fpl.com), Security Manager, at (772) 467-7045.

SAFEGUARDS INFORMATION (Enclosure contains Safeguards Information. Upon separation this page is decontrolled.)

S~oI Florida Power & Ught Company 6501 S. Ocean Drive, Jensen Beach, FL 34957

SAFEGUARDS INFORMATION L-2014-156 Page 2 Sincerely,

!;J:s_ ph Jensen Site Vice President St. Lucie Plant Enclosure - SGI CD-ROM labeled "FPL St. Lucie Units I and 2 PSP, Revision 15, Safeguards Information" Cc: Regional Administrator, Region II (With enclosure)

USNRC Project Manager, St. Lucie and Turkey Point (Without enclosure)

Senior Resident Inspector, USNRC, St. Lucie (Without enclosure)

SAFEGUARDS INFORMATION (Enclosure contains Safeguards Information. Upon separation this page is decontrolled.)