L-2007-154, Emergency Response Data System (ERDS) Maintenance

From kanterella
Jump to navigation Jump to search
Emergency Response Data System (ERDS) Maintenance
ML072920393
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 10/11/2007
From: Jefferson W
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2007-154
Download: ML072920393 (5)


Text

O** 1 1 2007 L-2007-154 FIPL 10CFR50, Appendix E US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC, 20555-00001 Re:

Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Emergency Response Data System (ERDS) Maintenance By letter L-2007-129, dated August 20, 2007, Florida Power & Light provided the 30-day notification pursuant to 10CFR50, Appendix E, VI, 3.b, "Maintaining the Emergency Response Data System," for Turkey Point Units 3 and 4 due to ERDS Point identification (ID) revisions. L-2007-129 identified the changes to the Turkey Point Units 3 and 4 data point libraries as a result of the Emergency Response Data Acquisition and Display System (ERDADS) replacement. Installation of the replacement ERDADS will be completed during the Unit 3 Cycle 23 refueling outage, currently in progress.

The purpose of this letter is to update some of the information provided by the referenced letter.

1) Attachment 1 to L-2007-129, "TP3 ERDS Data Parameter Point IDs" Summary Table Data point item # 9 is revised to reflect the New DCS Point ID "SCMCETLO_V" to make it consistent with Attachment 3 of L-2007-129.
2) Attachment 2, to L-2007-129, Appendix B, ERDS Communications Description and Survey Questionnaire" The name of the FPL contact person has changed from Billy J Wood to MarKeith Poteat for the Computer Hardware Specialist(s).

Replacement pages for these two changes are attached.

Should there be any questions, please contact James Connolly, Licensing Manager, at 305-246-6632.

Very truly yours, Vice President Turkey Point Nuclear Plant Attachments cc:

Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant (tC-an FPL Group company A

ATTACHMENT 1 TURKEY POINT UNIT 3 ERDS DATA PARAMETER POINT ID CHANGES

L-2007-154 Revised Page 1 of 2 of L-2007-129 TP3 ERDS Data Parameter Point IDs Item #

Original Point ID New DCS Point ID Description I

NIAVPRLVL-3 NIAVPRL V POWER RANGE POWER LEVEL (AVG) 2 NIAVSRLVL-3 NIAVSRL V SOURCE RANGE POWER LVL (AVG) 3 INTERMEDIATE RANGE POWER LVL NIAVIRLVL-3 NIAVIRLV(AG 46 (AVG) 4 N16649AVPR-3 N6649AVPSV GAMMA-METRICS AVE OF PR (AVG) 5 N16649AVSR-3 N6649AVS V.

GAMMA-METRICS AVE OF SR (AVG) 6 RXHDLVLLO-3 RXHDLLOV REACTOR HEAD LEVEL (AUCT LOW) 7 REACTOR PLENUM LEVEL (AUCT RXPLLVLLO-3 RXPLLLO_V LOW) 8 CET-3 CET V CORE EXIT TEMP (AUCT HIGH) 9 SMM1LO-3 SCMCETLOV SUBCOOLING (AUCT LOW) 10 RCSA-AVFLO-3 RCSAAVFV RCS A AVERAGE FLOW 11 RCSB-AVFLO-3 RCSBAVF V RCS B AVERAGE FLOW 12 RCSC-AVFLO-3 RCSCAVF V RCS C AVERAGE FLOW 13 SGA-AVLVL-3' SGA AVL V STEAM GENERATOR LEVEL A (AVG) 14 LT477-3 L477 A STM GEN A WIDE RANGE LEVEL 15 SGB-AVLVL-3 SGB AVL V STEAM GENERATOR LEVEL B (AVG) 16 LT487-3.

L487 A STM GEN B WIDE RANGE LEVEL 17 SGC-AVLVL-3 SGC AVLV STEAM GENERATOR LEVEL C (AVG) 18 LT497-3 L497_A STM GEN C WIDE RANGE LEVEL 19 STEAM GENERATOR PRESSURE A SGA-AVPRES-3 SGA-AVPV (AVG) 20 SGB-AVPRES-3 SGB AVP V STEAM GENERATOR PRESSURE B

--(AVG) 21 STEAM GENERATOR PRESSURE C SGC-AVPRES-3 SGCAVP_

(AG

-(AVG) 22 SGAAVFWFLO-3 SGAAVFWFV FEEDWATER FLOW A SG (AVG) 23 SGBAVFWFLO-3 SGBAVFWFV FEEDWATER FLOW B SG (AVG) 24 SGCAVFWFLO-3 SGCAVFWFV FEEDWATER FLOW C SG (AVG) 25 SGAAFWFLO-3 SGAAFWF V AUX FEEDWATER FLOW A SG U3 G

(TOTAL) 26 AUX FEEDWATER FLOW B SG U3.

SGBAFWFLO-3 SGBAFWFV(TAL (TOTAL) 27 AUX FEEDWATER FLOW C SG U3 SGCAFWFLO-3 SGCAFWFV(TAL (TOTAL)

RCS HOT LEG A AVG TEMP THA-AVTEMP-3 THAAVTPV 28 T

A V

29 THB-AVTEMP-3 THBCAVTP-V RCS HOT LEG B AVG TEMP 30 TH-VEP3 TCAT CS HOT LEG C AVG TEMP

L-2007-154 ATTACHMENT 2 APPENDIX B ERDS COMMUNICATIONS DESCRIPTION AND SURVEY QUESTIONNAIRE TURKEY POINT UNITS 3 AND 4 PLANT ATTRIBUTE LIBRARY

L-2007-154 Revised Page 1 of 5 of Attachment 2 of L-2007-129 I. CONTACTS Note: Please provide name, title, mailing address, and phone number.

A. Survey Coordinator (i.e., contact for later clarification of questionnaire answers):

Paul Banaszak Florida Power & Light Company Turkey Point Nuclear Plant 9760 SW 344 St Homestead, FL 33035 305-246-6072 B. Computer Hardware Specialist(s):

MarKeith Poteat ERDADS Florida Power & Light Company Turkey Point Nuclear Plant 9760 SW 344 St Homestead, FL 33035 305-246-6958 C. Systems Software Specialist(s)

Paul Banaszak (see above)

D. Application-level Software Specialist(s):

Paul Banaszak (see above)

E. Telephone Systems Specialist(s):

Tom Liberatore Management Information System Supervisor Florida Power & Light Company Turkey Point Nuclear Plant 9760 SW 344 St Homestead, FL 33035 305-246-4634